Remote inspection of the IFSF spent fuel storage rack

Description: The Irradiated Fuel Storage Facility (IFSF) is a dry storage facility for spent nuclear fuels located at the Idaho Chemical Processing Plant; it was constructed in the 1970`s specifically for the Fort Saint Vrain spent reactor fuels. Currently, it is being used for various spent fuels. It was not known if IFSF would met current DOE seismic criteria, so re-analysis was started, with the rack being analyzed first. The rack was inspected to determine the as-built condition. LazrLyne and VideoRuler were used in lieu of using a tape measure with the camera. It was concluded that when a visual inspection shows widely varying weld sizes, the engineer has to use all resources available to determine the most probable specified weld sizes.
Date: May 1, 1996
Creator: Uldrich, E.D.
Partner: UNT Libraries Government Documents Department

Spent Nuclear Fuel project systems engineering management plan

Description: The purpose of the WHC Systems Engineering Management Plan (SEMP) is to describe the systems engineering approach and methods that will be integrated with established WHC engineering practices to enhance the WHC engineering management of the SNF Project. The scope of the SEMP encompasses the efforts needed to manage the WHC implementation of systems engineering on the SNF Project. This implementation applies to, and is tailored to the needs of the SNF project and all its subprojects, including all current and future subprojects
Date: October 3, 1995
Creator: Womack, J.C.
Partner: UNT Libraries Government Documents Department

ID-69 Sodium drain experiments

Description: This paper describes experiments to determine the sodium retention and drainage from the two key areas of an ID-69. This information is then used as the initiation point for guidelines of how to proceed with washing an ID-69 in the IEM Cell Sodium Removal System.
Date: September 19, 1996
Creator: Johnston, D.C.
Partner: UNT Libraries Government Documents Department

Spent Nuclear Fuel project stage and store K basin SNF in canister storage building functions and requirements. Revision 1

Description: This document establishes the functions and requirements baseline for the implementation of the Canister Storage Building Subproject. The mission allocated to the Canister Storage Building Subproject is to provide safe, environmentally sound staging and storage of K Basin SNF until a decision on the final disposition is reached and implemented
Date: October 24, 1995
Creator: Womack, J.C.
Partner: UNT Libraries Government Documents Department

K basins sludge removal sludge pretreatment system

Description: The Spent Nuclear Fuels Program is in the process of planning activities to remove spent nuclear fuel and other materials from the 100-K Basins as a remediation effort for clean closure. The 105 K- East and K-West Basins store spent fuel, sludge, and debris. Sludge has accumulated in the 1 00 K Basins as a result of fuel oxidation and a slight amount of general debris being deposited, by settling, in the basin water. The ultimate intent in removing the sludge and fuel is to eliminate the environmental risk posed by storing fuel at the K Basins. The task for this project is to disposition specific constituents of sludge (metallic fuel) to produce a product stream through a pretreatment process that will meet the requirements, including a final particle size acceptable to the Tank Waste Remediation System (TWRS). The purpose of this task is to develop a preconceptual design package for the K Basin sludge pretreatment system. The process equipment/system is at a preconceptual stage, as shown in sketch ES-SNF-01 , while a more refined process system and material/energy balances are ongoing (all sketches are shown in Appendix C). Thus, the overall process and 0535 associated equipment have been conservatively selected and sized, respectively, to establish the cost basis and equipment layout as shown in sketches ES- SNF-02 through 08.
Date: June 12, 1997
Creator: Chang, H.L.
Partner: UNT Libraries Government Documents Department

Facility effluent monitoring plan for K area spent fuel storage basin

Description: A facility effluent monitoring plan is required by the U.S. Department of Energy in DOE Order 5400. 1 for any operations that involve hazardous materials and radioactive substances that could impact employee or public safety or the environment. This document was prepared using the specific guidelines identified in WHC-EP-0438-1, A Guide for Preparing Hanford Site Facility Effluent Monitoring Plans, and assesses effluent monitoring systems and evaluates whether they are adequate to ensure the public health and safety as specified in applicable federal, state, and local requirements. This facility effluent monitoring plan is the second revision to the original annual report. Long-range integrity ofthe effluent monitoring systenu shall be ensured with updates of this report whenever a new process or oper&ion introduces new hazardous materials or significant radioactive materials. This document must be reviewed annually even if there are no operational changes, and it must be updated at a minimwn of every three years.
Date: August 1, 1996
Creator: Hunacek, G.S., Westinghouse Hanford
Partner: UNT Libraries Government Documents Department

Fuel sorting evaluation

Description: An evaluation of functions and requirements associated with sorting fuel from the Hanford K Basins is presented to support design issue resolution decisions for achieving interim fuel storage. Potential requirements are recommended for implementation in design activities. The recommendations are provided as input to a management decision process where decisions are finalized and the sorting issue is closed.
Date: March 12, 1996
Creator: Pajunen, A.L.
Partner: UNT Libraries Government Documents Department

Furniture Rack Corrosion Coupon Surveillance - 2012 Update

Description: Under the L Basin corrosion surveillance program furniture rack coupons immersed for 14 years (FY2009 coupons) and 16 years (FY2011 coupons) were analyzed and the results trended with coupons exposed for shorter times. In addition, a section harvested from an actual furniture rack that was immersed for 14 years was analyzed for pitting in the weld and heat-affected-zone (HAZ) regions. The L Basin operations maintained very good water quality over the entire immersion period for these samples. These results for FY2009 and FY2011 coupons showed that the average pit depths for the 6061 and 6063 base metal are 1 and 2 mils, respectively, while those for the weld and HAZ are 3 and 4 mils, respectively. The results for the weld and HAZ regions are similar to coupons removed during the period of FY2003 to FY2007. These similarities indicate that the pit development occurred quickly followed by slow kinetics of increase in pit depth. For the actual furniture rack sample average pits of 5 and 2 mils were measured for the HAZ and weld, respectively. These results demonstrate that pitting corrosion of the aluminum furniture racks used to support the spent fuel occurs in waters of good quality. The corrosion kinetics or pit depth growth rate is much less that 1 mil/year, and would not impact long-term use of this material system for fuel storage racks in L Basin if good water quality is maintained.
Date: October 1, 2012
Creator: Mickalonis, J. I.; Murphy, T. R. & Berry, C. J.
Partner: UNT Libraries Government Documents Department

Annual Radiological Environmental Monitoring Program Report for the Fort St. Vrain Independent Spent Fuel Storage Installation (2005)

Description: This report presents the results of the 2003 Radiological Environmental Monitoring Program conducted in accordance with 10 CFR 72.44 for the Fort St. Vrain Independent Spent Fuel Storage Installation. A description of the facility and the monitoring program is provided. The results of monitoring the predominant radiation exposure pathway, direct radiation exposure, indicate the facility operation has not contributed to any increase in the estimated maximum potential dose commitment to the general public.
Date: February 1, 2001
Creator: Newkirk, J. R. & Borst, F. J.
Partner: UNT Libraries Government Documents Department

Staging and storage facility feasibility study. Final report

Description: This study was performed to investigate the feasibility of adapting the design of the HWVP Canister Storage Building (CSB) to meet the needs of the WHC Spent Nuclear Fuel Project for Staging and Storage Facility (SSF), and to develop Rough Order of Magnitude (ROM) cost and schedule estimates.
Date: February 1995
Creator: Swenson, C. E.
Partner: UNT Libraries Government Documents Department

Spent Nuclear Fuel Project Safety Management Plan

Description: The Spent Nuclear Fuel Project Safety Management Plan describes the new nuclear facility regulatory requirements basis for the Spemt Nuclear Fuel (SNF) Project and establishes the plan to achieve compliance with this basis at the new SNF Project facilities.
Date: February 1, 1996
Creator: Garvin, L.J.
Partner: UNT Libraries Government Documents Department

Characterization of Hanford K basin spent nuclear fuel and sludge

Description: A characterization plan was prepared to support the Integrated Process Strategy (IPS) for resolution of the safety and environmental concerns associated with the deteriorating Spent Nuclear Fuel (SNF) stored in the Hanford Site K Basins. This plan provides the structure and logic and identifies the information needs to be supported by the characterization activities. The IPS involves removal of the fuel elements from the storage canister and placing them in a container, i.e., Multiple Canister Overpack (MCO) capable of holding multiple tiers of baskets full of fuel. The MCOs will be vacuum dried to remove free water and shipped to the Container Storage Building (CSB) where they will be staged waiting for hot vacuum conditioning. The MCO will be placed in interim storage in the CSB following conditioning and disposition.
Date: March 13, 1996
Creator: Lawrence, L.A.
Partner: UNT Libraries Government Documents Department

Sampling and analysis of sludge from the Hanford K East basin

Description: Sludge samples from the floor of the Hanford K East Basin fuel storage pool has been retrieved and analyzed. Both chemical and physical properties have been determined. The results are to be used to determine the disposition of the bulk of the sludge and possibly assess the impact of residual sludge on dry storage of the associated intact metallic uranium fuel elements.
Date: March 13, 1996
Creator: Makenas, B. J.
Partner: UNT Libraries Government Documents Department

105K West Isolation Barrier Acceptance Test results

Description: The objective of this document is to report and interpret the findings of the isolation barrier acceptance tests performed in 105KW/100K. The tests were performed in accordance with the test plan and acceptance test procedure. The test report contains the test data. This document compares the test data against the criteria. A discussion of the leak rate analytical characterization describes how the flow characteristics flow rate will be determined using the test data from the test report. Two modes of water loss were considered; basin and/or discharge chute leakage, and evaporation. An initial test established baseline leakage data and instrumentation performance. Test 2 evaluated the sealing performance of the isolation barrier by inducing an 11 in. (27.9 cm) level differential across the barrier. The leak rate at this 11 in. (27.9 cm) level is extrapolated to the 16 ft. (4.9 m) level differential postulated in the DBE post seismic event. If the leak rate, adjusted for evaporation and basin leakage (determined from Test 1), is less than the SAR limit of 1,500 gph (5,680 lph) at a 16 ft (4.9 m) level differential, the barriers pass the acceptance test.
Date: May 18, 1995
Creator: McCracken, K.J. & Irwin, J.J.
Partner: UNT Libraries Government Documents Department

Electrometallurgical treatment of metallic spent nuclear fuel stored at the Hanford Site

Description: The major component of the DOE spent nuclear fuel inventory is the metallic fuel stored at the Hanford site in the southeastern part of the state of Washington. Most of this fuel was discharged from the N-Reactor; a small part of the inventory is fuel from the early Hanford production reactors. The U.S. Department of Energy (DOE) plans to remove these fuels from the spent fuel storage pools in which they are presently stored, dry them, and place them in interim storage at a location at the Hanford site that is far removed from the Columbia River. It is not yet certain that these fuels will be acceptable for disposal in a mined geologic repository without further treatment, due to their potential pyrophoric character. A practical method for treatment of the Hanford metallic spent fuel, based on an electrorefining process, has been developed and has been demonstrated with unirradiated N-Reactor fuel and with simulated single-pass reactor (SPR) spent fuel. The process can be operated with any desired throughput rates; being a batch process, it is simply a matter of setting the size of the electrorefiner modules and the number of such modules. A single module, prototypic of a production-scale module, has been fabricated and testing is in progress at a throughput rate of 150 kg (heavy metal) per day. The envisioned production version would incorporate additional anode baskets and cathode tubes and provide a throughput rate of 333 kgHM/day. A system with four of these modules would permit treatment of Hanford metallic fuels at a rate of at least 250 metric tons per year.
Date: May 1, 1996
Creator: Laidler, J.J. & Gay, E.C.
Partner: UNT Libraries Government Documents Department

Thermal hydraulic feasibility assessment for the Spent Nuclear Fuel Project

Description: A series of scoping analyses have been completed investigating the thermal-hydraulic performance and feasibility of the Spent Nuclear Fuel Project (SNFP) Integrated Process Strategy (IPS). The SNFP was established to develop engineered solutions for the expedited removal, stabilization, and storage of spent nuclear fuel from the K Basins at the U.S. Department of Energy`s Hanford Site in Richland, Washington. The subject efforts focused on independently investigating, quantifying, and establishing the governing heat production and removal mechanisms for each of the IPS operations and configurations, obtaining preliminary results for comparison with and verification of other analyses, and providing technology-based recommendations for consideration and incorporation into the design bases for the SNFP. The goal was to develop a series fo thermal-hydraulic models that could respond to all process and safety-related issues that may arise pertaining to the SNFP. A series of sensitivity analyses were also performed to help identify those parameters that have the greatest impact on energy transfer and hence, temperature control. It is anticipated that the subject thermal-hydraulic models will form the basis for a series of advanced and more detailed models that will more accurately reflect the thermal performance of the IPS and alleviate the necessity for some of the more conservative assumptions and oversimplifications, as well as form the basis for the final process and safety analyses.
Date: January 1, 1996
Creator: Heard, F.J.; Cramer, E.R.; Beaver, T.R. & Thurgood, M.J.
Partner: UNT Libraries Government Documents Department

Development of design basis capacity for SNF project systems

Description: An estimate of the design capacity for Spent Nuclear Fuel Project systems producing Multi-Canister Overpacks is developed based on completing fuel processing in a two year period. The design basis capacity for systems relates the desired annual processing rate to potential operating inefficiencies which may be actually experienced to project a design capacity for systems. The basis for estimating operating efficiency factors is described. Estimates of the design basis capacity were limited to systems actually producing the Multi-Canister Overpack. These systems include Fuel Retrieval, K Basin SNF Vacuum Drying, Canister Storage Building support for Staging and Storage, and Hot Vacuum conditioning. The capacity of other systems are assumed to be derived from these system capacities such that systems producing a Multi-Canister Overpack are not constrained.
Date: February 27, 1996
Creator: Pajunen, A.L.
Partner: UNT Libraries Government Documents Department

Spent nuclear fuel canister storage building conceptual design report

Description: This Conceptual Design Report provides the technical basis for the Spent Nuclear Fuels Project, Canister Storage Building, and as amended by letter (correspondence number 9555700, M.E. Witherspoon to E.B. Sellers, ``Technical Baseline and Updated Cost Estimate for the Canister Storage Building``, dated October 24, 1995), includes the project cost baseline and Criteria to be used as the basis for starting detailed design in fiscal year 1995.
Date: January 1996
Creator: Swenson, C. E.
Partner: UNT Libraries Government Documents Department

Spent Nuclear Fuel Project operational staffing plan

Description: Using the Spent Nuclear Fuel (SNF) Project`s current process flow concepts and knowledge from cognizant engineering and operational personnel, an initial assessment of the SNF Project radiological exposure and resource requirements was completed. A small project team completed a step by step analysis of fuel movement in the K Basins to the new interim storage location, the Canister Storage Building (CSB). This analysis looked at fuel retrieval, conditioning of the fuel, and transportation of the fuel. This plan describes the staffing structure for fuel processing, fuel movement, and the maintenance and operation (M&O) staffing requirements of the facilities. This initial draft does not identify the support function resources required for M&O, i.e., administrative and engineering (technical support). These will be included in future revisions to the plan. This plan looks at the resource requirements for the SNF subprojects, specifically, the operations of the facilities, balances resources where applicable, rotates crews where applicable, and attempts to use individuals in multi-task assignments. This plan does not apply to the construction phase of planned projects that affect staffing levels of K Basins.
Date: March 1, 1996
Creator: Debban, B.L.
Partner: UNT Libraries Government Documents Department