A Non-scaling Fixed Field Alternating Gradient Accelerator for the Final Acceleration Stage of the International Design Study of the Neutrino Factory.

Description: The International Design Study of the Neutrino Factory (IDS-NF) has recently completed its Interim Design Report (IDR), which presents our current baseline design of the neutrino factory. To increase the efficiency and reduce the cost of acceleration, the IDR design uses a linear non-scaling fixed field alternating gradient accelerator (FFAG) for its final acceleration stage. We present the current lattice design of that FFAG, including the main ring plus its injection and extraction systems. We describe parameters for the main ring magnets, kickers, and septa, as well as the power supplies for the kickers. We present a first pass at an engineering layout for the ring and its subsystems.
Date: September 4, 2011
Creator: Berg, J.S.; Aslaninejad, M.; Pasternak, J.; Witte, H.; Bliss, N. Cordwell M.; Jones, T. et al.
Partner: UNT Libraries Government Documents Department

Chimney Open Issues

Description: In the process of developing a design for the design report, many side questions or comments arose which were not completely answered or investigated because the work was outside the scope of developing a base design. I have pored over my meeting notes and tried to list all such chimney 'open issues' in this engineering note.
Date: October 4, 1993
Creator: Rucinski, R.
Partner: UNT Libraries Government Documents Department

Interim report on the Global Design Effort Global International Linear Collider (ILC) R&D

Description: The International Linear Collider: A Technical Progress Report marks the halfway point towards the Global Design Effort fulfilling its mandate to follow up the ILC Reference Design Report with a more optimised Technical Design Report (TDR) by the end of 2012. The TDR will be based on much of the work reported here and will contain all the elements needed to propose the ILC to collaborating governments, including a technical design and implementation plan that are realistic and have been better optimised for performance, cost and risk. We are on track to develop detailed plans for the ILC, such that once results from the Large Hadron Collider (LHC) at CERN establish the main science goals and parameters of the next machine, we will be in good position to make a strong proposal for this new major global project in particle physics. The two overriding issues for the ILC R&D programme are to demonstrate that the technical requirements for the accelerator are achievable with practical technologies, and that the ambitious physics goals can be addressed by realistic ILC detectors. This GDE interim report documents the impressive progress on the accelerator technologies that can make the ILC a reality. It highlights results of the technological demonstrations that are giving the community increased confidence that we will be ready to proceed with an ILC project following the TDR. The companion detector and physics report document likewise demonstrates how detector designs can meet the ambitious and detailed physics goals set out by the ILC Steering Committee. LHC results will likely affect the requirements for the machine design and the detectors, and we are monitoring that very closely, intending to adapt our design as those results become available.
Date: April 30, 2011
Creator: Harrison, M.
Partner: UNT Libraries Government Documents Department

Engineering Specification Document (ESD) of X-ray Vacuum Transport System (XVTS) for LCLS XTOD

Description: The vacuum system of the X-Ray Vacuum Transport System (XVTS) for the Linac Coherent Light Source (LCLS) X-ray Transport, Optics and Diagnostics (XTOD) system has been analyzed and configured by the Lawrence Livermore National Laboratory's New Technologies Engineering Division (NTED) as requested by the SLAC/LCLS program. The preliminary system layout, detailed analyses and suggested selection of the vacuum components for the XTOD tunnel section are presented in the preliminary design report [1]. This document briefly reviews the preliminary design and provides engineering specifications for the system, which can be used as 'design to' specifications for the final design. Also included are the requirements of plans for procurement, mechanical integration, schedule and the cost estimates.
Date: January 25, 2006
Creator: Shen, S
Partner: UNT Libraries Government Documents Department

Pressure Model for the Vacuum System for the Electron Gun and Injector for LCLS Final Design Report

Description: The vacuum system of the injector for the Linac Coherent Light Source (LCLS) has been analyzed and configured by the Lawrence Livermore National Laboratory's New Technologies Engineering Division (NTED) as requested by the SLAC/LCLS program. The vacuum system layout and detailed analyses for the injector are presented in this final design report. The vacuum system was analyzed and optimized using a coupled gas load balance model of sub-volumes of the components to be evacuated.
Date: April 28, 2006
Creator: Tung, L S & Eriksson, L
Partner: UNT Libraries Government Documents Department

NSLS 2006 ACTIVITY REPORT (NATIONAL SYNCHROTRON LIGHT SOURCE ACTIVITY REPORT 2006)

Description: This past year has seen both challenges and fantastic new opportunities for the user community at the NSLS. The fantastic new opportunities are clear and abundant. We now have a five-year strategic plan for new development and continued operation of the NSLS. The NSLS continues to be an extremely productive facility, and the UEC is delighted at how NSLS Chair Chi-Chang Kao has consulted widely within the user community to develop a five-year plan for strategic upgrades and continued operation of the facility. The NSLS-II project, led by Associate Lab Director Steve Dierker, has done very well in its Department of Energy (DOE) reviews and will hopefully soon receive Critical Decision-1 (CD-1) approval, which in DOE lingo gives a go-ahead to launch the detailed design of the facility. We also held the first joint user meeting between the NSLS and Brookhaven's Center for Functional Nanomaterials (CFN), for which the building is near completion. The joint user meeting is an important step toward the close collaboration of the two facilities. The CFN, led by Emilio Mendez, promises to provide capabilities and research foci that are complementary to those at the NSLS. Together, all of these developments give a clear path to an exciting future of synchrotron radiation research at Brookhaven! However, with opportunities come challenges! One of the largest of these faced in the past year involved congressional support for scientific research in general, and DOE user facilities in particular. As you likely know, Congress did not complete its usual budget process in 2006, with the exceptions of the departments of Defense and Homeland Security. This left science funding at the budget levels enacted in late 2005 for FY2006, and unfortunately, FY2006 was not a particularly memorable vintage for science support. The good news is that you, the user community, have ...
Date: December 31, 2006
Creator: MILLER, L. (EDITOR)
Partner: UNT Libraries Government Documents Department

SPENT NUCLEAR FUEL NUMBER DENSITIES FOR MULTI-PURPOSE CANISTER CRITICALITY CALCULATIONS

Description: The purpose of this analysis is to calculate the number densities for spent nuclear fuel (SNF) to be used in criticality evaluations of the Multi-Purpose Canister (MPC) waste packages. The objective of this analysis is to provide material number density information which will be referenced by future MPC criticality design analyses, such as for those supporting the Conceptual Design Report.
Date: January 12, 1996
Creator: Thomas, D. A.
Partner: UNT Libraries Government Documents Department

LCLS XTOD Tunnel Vacuum System (XVTS)

Description: The vacuum system of the XVTS (X-Ray Vacuum Transport System) for the LCLS (Linac Coherent Light Source) XTOD (X-ray Transport, Optics and Diagnostics) system has been analyzed and configured by the Lawrence Livermore National Laboratory's NTED (New Technologies Engineering Division) as requested by the SLAC/LCLS program. The system layout, detailed analyses and selection of the vacuum components for the XTOD tunnel section are presented in this preliminary design report. The vacuum system was analyzed and optimized using a coupled gas load balance model of sub-volumes of the components to be evacuated. Also included are the plans for procurement, mechanical integration, and the cost estimates.
Date: November 4, 2005
Creator: Beale, R; Duffy, P; Kishiyama, K; Mckernan, M; McMahon, D; Lewis, S et al.
Partner: UNT Libraries Government Documents Department

LCLS XTOD Tunnel Vacuum Transport System (XVTS) Final Design Report

Description: The design of the X-Ray Vacuum Transport System (XVTS) for the Linac Coherent Light Source (LCLS) X-ray Transport, Optics and Diagnostics (XTOD) system has been analyzed and configured by the Lawrence Livermore National Laboratory's New Technologies Engineering Division (NTED) as requested by the SLAC/LCLS program. A preliminary design review was held on 11/14/05 [1][2]. This FDR (Final Design Report) presents system configuration, detailed analyses and selection of the mechanical and electrical components for the XTOD tunnel section, as well as the response to all issues raised in the review committee report. Also included are the plans for procurement, mechanical integration, schedule and the cost estimates. It should be noticed that, after the XVTS PDR, LCLS management has decided to lower the number of beamlines from three to one, and shorten the tunnel length from 212 m to 184 m. [3][4] The final design of XVTS system is completed. The major subjects presented in this report are: (1) Design of the complete system. (2) System analysis results. (3) ES&H issues and plan. (4) Project cost estimates and schedule.
Date: October 16, 2006
Creator: Shen, S
Partner: UNT Libraries Government Documents Department

FFAG Designs for the International Design Study for the Neutrino Factory

Description: The International Design Study for the Neutrino Factory (IDS-NF) aims to produce a design report for a neutrino factory. One component of that design is a linear nonscaling fixed-field alternating gradient accelerator (FFAG) that will accelerate to the final energy of 25 GeV. An FFAG is used to reduce the machine cost by maximizing the number of passes made through the RF cavities. We present some design options for this FFAG, individually optimized for cost. We study the addition of nonlinear magnets to the lattice to improve the performance of the lattice and consider the negative effects of doing so.
Date: May 4, 2009
Creator: Berg, J.S. & Machida, S.
Partner: UNT Libraries Government Documents Department

D0 Solenoid Upgrade Project: Heat Load Calculations for the Solenoid Chimney

Description: This engineering note documents the calculations done to determine the chimney heat loads. These heat load numbers were reported in the D0 solenoid upgrade design report. The heat loads to the LN2 circuit were done by Andrew Stefanik, RDIMechanical Systems group. They were part of his LN2 shield calculations dated 2/23/93. Pages 1 thru 3 of his calculations that apply to the chimney are attached. The heat loads to the LHe circuit were done originally on 12/16/92 and then revised on 12/23/92 to be more conservative. The raw calculations are attached. I include both the original 12/16 version and the 12/23 revised version to document the amount of conservativeness added.
Date: May 26, 1993
Creator: Rucinski, R.
Partner: UNT Libraries Government Documents Department

Control Dewar Open Issues

Description: In the process of developing a design for the design report, side questions or comments arose which were not completely answered or investigated because the work was outside the scope of developing a base design. I have pored over my meeting notes and tried to list all such control dewar 'open issues' in this engineering note.
Date: October 4, 1993
Creator: Rucinski, R.
Partner: UNT Libraries Government Documents Department

The ILC engineering design phase: Towards the production of an engineering design report

Description: In August 2007, the International Linear Collider-Global Design Effort (ILC-GDE) published the ILC Reference Design Report (RDR) which contains a description of the design of the linear collider and a ''value'' cost estimate. The RDR was developed over a 2 year period starting in August 2005 with the creation of the GDE at the Second ILC workshop, held at Snowmass, Colorado. The design described in the RDR and its associated estimate allow the GDE to plan and prioritize the next phase of the ILC, the creation of an Engineering Design and the production, by mid 2010, of an Engineering Design Report (EDR). The EDR will contain, in addition to a more mature design and an updated value estimate, a plan for executing the ILC Project. The purpose of the EDR is to facilitate formal international negotiations at government level on siting, funding, organization and execution of the ILC project with a timescale consistent with the start of construction in 2012. The creation of the ILC Engineering Design will include: (1) Basic R&D to demonstrate that all components can be engineered; (2) R&D into alternative solutions to mitigate remaining risk; (3) An overall design to allow machine construction to start within 3 years following its completion; (4) selection between high tech options to allow industrialization efforts; (5) A comprehensive value-engineering exercise; (6) A complete value cost estimate for the machine, including a funding profile consistent with the project schedule; (7) A project execution plan including a realistic schedule; (8) Designs for facilities shared between different ''area systems'', and for site-specific infrastructure. The designs must include the level of detail needed for regions to estimate the cost to host; and (9) All necessary information must be provided to regions to evaluate project technical and financial risks in support of a bid to ...
Date: January 1, 2007
Creator: Ross, Marc
Partner: UNT Libraries Government Documents Department

DOE Defense Program (DP) safety programs. Final report, Task 003

Description: The overall objective of the work on Task 003 of Subcontract 9-X52-W7423-1 was to provide LANL with support to the DOE Defense Program (DP) Safety Programs. The effort included the identification of appropriate safety requirements, the refinement of a DP-specific Safety Analysis Report (SAR) Format and Content Guide (FCG) and Comprehensive Review Plan (CRP), incorporation of graded approach instructions into the guidance, and the development of a safety analysis methodologies document. All tasks which were assigned under this Task Order were completed. Descriptions of the objectives of each task and effort performed to complete each objective is provided here.
Date: August 1, 1998
Partner: UNT Libraries Government Documents Department

Safety analysis, risk assessment, and risk acceptance criteria

Description: This paper discusses a number of topics that relate safety analysis as documented in the Department of Energy (DOE) safety analysis reports (SARs), probabilistic risk assessments (PRA) as characterized primarily in the context of the techniques that have assumed some level of formality in commercial nuclear power plant applications, and risk acceptance criteria as an outgrowth of PRA applications. DOE SARs of interest are those that are prepared for DOE facilities under DOE Order 5480.23 and the implementing guidance in DOE STD-3009-94. It must be noted that the primary area of application for DOE STD-3009 is existing DOE facilities and that certain modifications of the STD-3009 approach are necessary in SARs for new facilities. Moreover, it is the hazard analysis (HA) and accident analysis (AA) portions of these SARs that are relevant to the present discussions. Although PRAs can be qualitative in nature, PRA as used in this paper refers more generally to all quantitative risk assessments and their underlying methods. HA as used in this paper refers more generally to all qualitative risk assessments and their underlying methods that have been in use in hazardous facilities other than nuclear power plants. This discussion includes both quantitative and qualitative risk assessment methods. PRA has been used, improved, developed, and refined since the Reactor Safety Study (WASH-1400) was published in 1975 by the Nuclear Regulatory Commission (NRC). Much debate has ensued since WASH-1400 on exactly what the role of PRA should be in plant design, reactor licensing, `ensuring` plant and process safety, and a large number of other decisions that must be made for potentially hazardous activities. Of particular interest in this area is whether the risks quantified using PRA should be compared with numerical risk acceptance criteria (RACs) to determine whether a facility is `safe.` Use of RACs requires quantitative ...
Date: August 1, 1997
Creator: Jamali, K.; Stack, D.W.; Sullivan, L.H. & Sanzo, D.L.
Partner: UNT Libraries Government Documents Department

Interim measure conceptual design for remediation of source area contamination at Agra, Kansas.

Description: This document presents a conceptual design for the implementation of a non-emergency interim measure (IM) at the site of the grain storage facility formerly operated by the Commodity Credit Corporation of the U.S. Department of Agriculture (CCC/USDA) in Agra, Kansas. The IM is recommended to mitigate localized carbon tetrachloride contamination in the vadose zone soils at the former CCC/USDA facility and eliminate ongoing soil-to-groundwater contamination. The objectives of this IM conceptual design report include the following: 1. Obtain written acknowledgement from the Kansas Department of Health and the Environment (KDHE) that remediation on the former CCC/USDA property is required. 2. Provide information (IM description, justification for the IM, and project schedule) that the KDHE can include in a pending fact sheet. 3. Obtain KDHE approval for the IM conceptual design, so that the CCC/USDA can initiate a formal request for access to the privately owned property and proceed with preparation of a remedial design plan (RDP). Investigations conducted on behalf of the CCC/USDA by Argonne National Laboratory (Argonne 2006) have demonstrated that soil and groundwater at the Agra site are contaminated with carbon tetrachloride. The levels in groundwater exceed the Kansas Tier 2 Risk-Based Screening Level (RBSL) and the U.S. Environmental Protection Agency (EPA) maximum contaminant level (MCL) of 5.0 {micro}g/L for this compound. The soil and groundwater contamination identified at the former CCC/USDA facility currently poses no unacceptable health risks.
Date: July 31, 2007
Creator: LaFreniere, L. M. & Division, Environmental Science
Partner: UNT Libraries Government Documents Department

Options for Production Staging for a Low Energy Neutrino Factory

Description: A low energy neutrino factory (LENF) is defined, for the purpose of this report, to accelerate a muon beam to a total energy in the range of 10-14 GeV, and store it in a decay ring directing a resulting neutrino beam to a detector 2200-2300 km distant. The machine should be ultimately capable of producing 10{sup 21} decays toward that detector per year of 10{sup 7} s. We consider such a neutrino factory to be the accelerator defined in the Interim Design Report (IDR) of the International Design Study for the Neutrino Factory (IDS-NF), modified to remove the final stage of acceleration, possibly modifying the remaining acceleration stages to adjust the final energy, and replacing the decay ring with one designed for the lower energy and shorter baseline. We discuss modifications to that design which would reduce the cost of the machine at the price of a reduction in neutrino production, down to as low as 10{sup 20} decays per year. These modifications will not preclude eventually upgrading the machine to the full production of 10{sup 21} decays per year. The eventual cost of a machine which achieves the full production through a series of lower-production stages should not exceed the cost of a machine which is immediately capable of the full production by more than a small fraction of the cost difference between the full production machine and the lowest production stage.
Date: October 26, 2011
Creator: Berg, J. S.
Partner: UNT Libraries Government Documents Department

P-West High Intensity Secondary Beam Area Design Report

Description: This report gives the initial design parameters of a 1000 GeV High Intensity Superconducting Secondary Beam Laboratory to be situated in the Proton Area downstream of the existing Proton West experimental station. The area will provide Fermilab with a major capability for experimentation with pion and antiproton beams of intensities and of energies available at no other laboratory and with an electron beam with excellent spot size, intensity, and purity at energies far above that available at electron machines. Detailed beam design, area layouts, and cost estimates are presented, along with the design considerations.
Date: March 1, 1977
Creator: Cox, A.; Currier, R.; Eartly, D.; Guthke, A.; Johnson, G.; Lee, D. et al.
Partner: UNT Libraries Government Documents Department

The Impact of SuperB on Flavor Physics

Description: This report provides a succinct summary of the physics programme of SuperB, and describes that potential in the context of experiments making measurements in flavour physics over the next 10 to 20 years. Detailed comparisons are made with Belle II and LHCb, the other B physics experiments that will run in this decade. SuperB will play a crucial role in defining the landscape of flavour physics over the next 20 years. SuperB is an approved high luminosity e{sup +}e{sup -} collider intended to search for indirect and some direct signs of new physics (NP) at low energy, while at the same time, enabling precision tests of the Standard Model (SM). This experiment will be built at a new laboratory on the Tor Vergata campus near Rome, Italy named after Nicola Cabibbo. The project has been described in a Conceptual Design Report, and more recently by a set of three white papers on the accelerator, detector, and physics programme. The main focus of the physics programme rests in the study of so-called Golden Modes, these are decay channels that provide access to measurements of theoretically clean observables that can provide both stringent constraints on models of NP, and precision tests of the SM. A number of ancillary measurements that remain important include those with observables that may not be theoretically clean, and those that can be used to provide stringent constraints on the SM but are not sensitive to NP. The remainder of this section introduces SuperB before discussing the golden modes for SuperB, precision CKM measurement modes, and an outline of the rest of this report.
Date: February 16, 2012
Creator: Meadows, B.; Blanke, M.; Stocchi, A.; Drutskoy, A.; Cervelli, A.; Giorgi, M. et al.
Partner: UNT Libraries Government Documents Department

Mountaineer Commercial Scale Carbon Capture and Storage Project Topical Report: Preliminary Public Design Report

Description: This Preliminary Public Design Report consolidates for public use nonproprietary design information on the Mountaineer Commercial Scale Carbon Capture & Storage project. The report is based on the preliminary design information developed during the Phase I - Project Definition Phase, spanning the time period of February 1, 2010 through September 30, 2011. The report includes descriptions and/or discussions for: (1) DOE's Clean Coal Power Initiative, overall project & Phase I objectives, and the historical evolution of DOE and American Electric Power (AEP) sponsored projects leading to the current project; (2) Alstom's Chilled Ammonia Process (CAP) carbon capture retrofit technology and the carbon storage and monitoring system; (3) AEP's retrofit approach in terms of plant operational and integration philosophy; (4) The process island equipment and balance of plant systems for the CAP technology; (5) The carbon storage system, addressing injection wells, monitoring wells, system monitoring and controls logic philosophy; (6) Overall project estimate that includes the overnight cost estimate, cost escalation for future year expenditures, and major project risks that factored into the development of the risk based contingency; and (7) AEP's decision to suspend further work on the project at the end of Phase I, notwithstanding its assessment that the Alstom CAP technology is ready for commercial demonstration at the intended scale.
Date: September 30, 2011
Creator: Cerimele, Guy
Partner: UNT Libraries Government Documents Department

Pedigree Analysis of the MELCOR 1.8.2 Code to be Used for ITER’s Report Preliminary on Safety

Description: This report documents the pedigree analysis of the MELCOR 1.8.2 code to be used for ITER’s Report Preliminary on Safety. To pedigree the code the process involved four steps. First, taking the modified MELCOR 1.8.2 code used by the ITER Joint Central Team (JCT) for analyses in previous ITER Safety Assessments and compared the FORTRAN code of this version line-by-line to the original 1.8.2 version of MELCOR. The second step was a non-regression analysis which involves comparing the results from the pedigreed version against those predicted by the original, unmodified version of MELCOR 1.8.2. The third step involved comparing the pedigreed version results to results from the MELCOR version used by the ITER JCT for the Generic Site Safety Report (GSSR) against a set of accident problems analyzed for the safety report. The fourth and final step involved a comparison between the pedigreed version of the code and the developmental test problems cited in the change documents referenced in this report. The results from the pedigree process are described in this report.
Date: June 1, 2007
Creator: Moore, Richard L. & Merrill, Brad J.
Partner: UNT Libraries Government Documents Department