62 Matching Results

Search Results

Advanced search parameters have been applied.

Volume II solicitation package for solicitation no. 522887-5422 {open_quotes}site electrical replacements & substation{close_quotes} subproject: 69 KV substation

Description: This solicitation is for the U.S. Department of Energy under Prime Contract No. DE-AC04-88-DP43495 with EG&G Mound Applied Technologies. Ohio Sales or Use taxes are not to be included in the proposal price. Applicable taxes due or owing to the State of Ohio will be paid by the buyer under Direct Payment Permit No. 98-002230. Refer to Form ML-2487, General Provisions, Article 24, {open_quotes}Federal, State & Local Taxes{close_quotes}. Sellers are advised that purchases of building and construction materials for incorporation into a structure or improvement to a real property which is accepted for ownership by the United States or one of its agencies are exempt from Ohio Sales and Use taxes. Unnecessarily elaborate brochures or other presentations beyond those sufficient to present a complete and effective response to this solicitation are not desired and may be construed as an indication of the seller`s lack of cost consciousness. Elaborate art work, expensive paper and binding, and expensive visual and other presentation aids are neither necessary nor wanted.
Date: May 3, 1991
Partner: UNT Libraries Government Documents Department

Marys Lake 69/115-kV transmission line upgrade and substation expansion projects

Description: Western Area Power Administration (Western) and the Platte River Power Authority (Platte River) propose to upgrade portions of the existing electric transmission and substation system that serves the Town of Estes Park, Colorado. The existing transmission lines between the Estes Power Plant Switchyard and the Marys Lake Substation include a 115,000 volt (115-kV) line and 69,000 volt (69-kV) line. Approximately one mile is a double-circuit 115/69-kV line on steel lattice structures, and approximately two miles consists of separate single-circuit 115-kV and a 69-kV lines, constructed on wood H-Frame structures. Both lines were constructed in 1951 by the US Bureau of Reclamation. The existing transmission lines are on rights-of-way (ROW) that vary from 75 feet to 120 feet and are owned by Western. There are 48 landowners adjacent to the existing ROW. All of the houses were built adjacent to the existing ROW after the transmission lines were constructed. Upgrading the existing 69-kV transmission line between the Marys Lake Substation and the Estes Power Plant Switchyard to 115-kV and expanding the Marys Lake Substation was identified as the most effective way in which to improve electric service to Estes Park. The primary purpose and need of the proposed project is to improve the reliability of electric service to the Town of Estes Park. Lack of reliability has been a historical concern, and reliability will always be less than desired until physical improvements are made to the electrical facilities serving Estes Park.
Date: May 1, 1996
Partner: UNT Libraries Government Documents Department

Acceptance test procedure for removal of CS1K circuit switcher block and trip schemes

Description: This supporting document provides a detailed process to test the functions of the circuit switcher, protective relays, alarms, SCADA and 125VDC control logic of 115kV and 13.8kV systems at B3S4 substation following the removal of trip and blocking schemes to Transformer No.1 Circuit Switcher B594.
Date: August 25, 1999
Creator: HACHE, J.M.
Partner: UNT Libraries Government Documents Department

Electrical substation service-area estimation using Cellular Automata: An initial report

Description: The service areas for electric power substations can be estimated using a Cellular Automata (CA) model. The CA model is a discrete, iterative process whereby substations acquire service area by claiming neighboring cells. The service area expands from a substation until a neighboring substation service area is met or the substation`s total capacity or other constraints are reached. The CA-model output is dependent on the rule set that defines cell interactions. The rule set is based on a hierarchy of quantitative metrics that represent real-world factors such as land use and population density. Together, the metrics determine the rate of cell acquisition and the upper bound for service area size. Assessing the CA-model accuracy requires comparisons to actual service areas. These actual service areas can be extracted from distribution maps. Quantitative assessment of the CA-model accuracy can be accomplished by a number of methods. Some are as simple as finding the percentage of cells predicted correctly, while others assess a penalty based on the distance from an incorrectly predicted cell to its correct service area. This is an initial report of a work in progress.
Date: July 1, 1998
Creator: Fenwick, J.W. & Dowell, L.J.
Partner: UNT Libraries Government Documents Department

Electric power substation capital costs

Description: The displacement or deferral of substation equipment is a key benefit associated with several technologies that are being developed with the support of the US Department of Energy`s Office of Utility Technologies. This could occur, for example, as a result of installing a distributed generating resource within an electricity distribution system. The objective of this study was to develop a model for preparing preliminary estimates of substation capital costs based on rudimentary conceptual design information. The model is intended to be used by energy systems analysts who need ``ballpark`` substation cost estimates to help establish the value of advanced utility technologies that result in the deferral or displacement of substation equipment. This cost-estimating model requires only minimal inputs. More detailed cost-estimating approaches are recommended when more detailed design information is available. The model was developed by collecting and evaluating approximately 20 sets of substation design and cost data from about 10 US sources, including federal power marketing agencies and private and public electric utilities. The model is principally based on data provided by one of these sources. Estimates prepared with the model were compared with estimated and actual costs for the data sets received from the other utilities. In general, good agreement (for conceptual level estimating) was found between estimates prepared with the cost-estimating model and those prepared by the individual utilities. Thus, the model was judged to be adequate for making preliminary estimates of typical substation costs for US utilities.
Date: December 1997
Creator: Dagle, J. E. & Brown, D. R.
Partner: UNT Libraries Government Documents Department

Refurbish power supply/distribution system, Phase 2, Y-12 Plant, Oak Ridge. Progress status report number 51

Description: This is a report on the phase 2 of refurbishing power supply/distribution system at Y-12 Plant, Oak Ridge, TN. The report topics include accomplishments by work breakdown structure (WBS) identifier, identification of items issued and items received, past due items, items requested, a milestone schedule by WBS and including a drawing list showing percent complete, and conference summaries.
Date: November 30, 1995
Partner: UNT Libraries Government Documents Department

Modulation and SSR tests performed on the BPA 500 kV thyristor controlled series capacitor unit at Slatt substation

Description: Field experience is reported for a thyristor controlled series capacitor (TCSC) recently commissioned at BPA`s Slatt substation. Subsynchronous resonance tests show that TCSC interactions with shaft dynamics of PGE`s Boardman steam generator are well understood and are effectively avoided by normal TCSC valve firing logic. Modulation tests, performed with the Boardman plant off line, show that the TCSC can be a powerful and responsive actuator for swing damping. Security considerations did not permit lightly damped operation of the controlled plant. Close analysis indicates that the TCSC damping contribution, though small, was measurable. The best estimate is that damping for the McNary mode is 7.33% and 8.55%, for the TCSC damper loop open and closed respectively. TCSC testing and monitoring is facilitated by an advanced interactive measurement network representing BPA`s approach to the information requirements of major control systems.
Date: July 1, 1995
Creator: Hauer, J.F.; Mittelstadt, W.A.; Piwko, R.J.; Damsky, B.L. & Eden, J.D.
Partner: UNT Libraries Government Documents Department

Quality Assurance Plan for site electrical replacements at substation line item subproject: 69 KV Substation

Description: The 69 KV Substation Project is based on the recognized need to provide a continuous, reliable source of power and to improve the firm capacity of the electrical service to all production facilities at Mound. The project consists of the following major element: 69 KV Substation: (1) Install a 69 KV Substation and associated equipment with two parallel 18 MVA transformers. (2) Install duct bank as required and provide 15 KV feeder cable from new substation to existing Substation 95 for connection to Mound`s existing primary distribution system. (3) Install duct bank for underground routing of the 15 KV feeder cable from Manhole 5C to the existing power house cable pit. (4) Reconfigure existing Dayton Power and Light Co. 15 KV switchgear in P Building. The purpose of this Quality Assurance Plan (QA Plan) is to assure that the objectives of the United States Department of Energy (D.O.E.) and EG&G Mound Applied Technologies, Miamisburg, Ohio (Mound) are met for this non-weapons project relative to health and safety, protection of the environment, reliability and continuity of operations, and documentation of quality efforts. This QA Plan identifies the activities and responsibilities which are necessary in the design, procurement, fabrication, installation, and start up of this project in order to meet these objectives.
Date: May 21, 1991
Creator: Ohler, C.K.
Partner: UNT Libraries Government Documents Department

Mobile integrated temporary utility system. Innovative technology summary report

Description: The Mobile Integrated Temporary Utility System (MITUS) integrates portable electrical power along with communications and emergency alarm and lighting capabilities to provide safe, centralized power to work areas that need to be de-energized for decommissioning work. MITUS consists of a portable unit substation; up to twenty portable kiosks that house the power receptacles, communications, and emergency alarm and lighting systems; and a central communications unit. This system makes sequential decommissioning efforts efficient and cost-effective by allowing the integrated system to remain intact while being moved to subsequent work sites. Use of the MITUS also eliminates the need to conduct zero-energy tests and implement associated lock-out/tag-out procedures at partially de-energized facilities. Since the MITUS is a designed system, it can be customized to accommodate unique facility conditions simply by varying kiosks and transformer configurations. The MITUS is an attractive alternate to the use of portable generators with stand-alone communications and emergency system. It is more cost-effective than upgrading or reconfiguring existing power distribution systems.
Date: December 1, 1998
Partner: UNT Libraries Government Documents Department

Environmental assessment

Description: The proposed overhead power line construction project (Sand Dunes to Ochoa, in Eddy and Lea Counties, New Mexico) will supply additional electric power to the Waste Isolation Pilot Plant (WIPP) and involve construction of a new electric substation at WIPP. This would provide a redundant electrical power source to WIPP. A finding of no significant impact is made.
Date: August 1, 1995
Partner: UNT Libraries Government Documents Department

Marion Industrial Substation Project : Environmental Assessment.

Description: Consumers Power, Inc. (CPI), proposes to construct a new distribution substation under the existing Bonneville Power Administration (BPA) Albay-Lebanon transmission line near the city of Albany in Linn County, Oregon. BPA is proposing to grant a new Point of Delivery to CPI at this substation. The purpose of the project is to serve the developing industrial needs in the Marion Industrial Park and on the 550 acres of nearby land within CPI's service area that are zoned for residential use. CPI prepared, and the Rural Electrification Administration (REA) has approved a Borrower's Environmental Report (BER) which addresses this action along with several other proposed projects in the CPI service area. Portions of this BER are summarized in this brief EA. BPA is preparing its own EA since Department of Energy National Environmental Policy Act (NEPA) guidelines require additional environmental concerns to be addressed than are required by REA's NEPA guidelines.
Date: April 1, 1992
Creator: Administration., United States. Bonneville Power
Partner: UNT Libraries Government Documents Department

Keeping the Lights on While Cutting Costs.

Description: In 1992, the Bonneville Power Administration spent $361 million in capital on a system to transmit electricity. By 1998, it was spending about one-third that amount: $123 million. In 1992, BPA`s expenses for managing, operating and maintaining the transmission system ran $160 million. By 1998, BPA had cut expenses to $128 million. Maintenance costs alone were cut 28%. In 1992, management of the grid was split into six organizations. Today, there is one. About 2,900 people worked for transmission in October 1992. By February 1998, the Transmission Business Line (TBL) employed 1,855. Transmission in 1992 for the most part meant new towers, lines and substations. Today it means computers, digital communications and electronic controls.
Date: August 1, 1998
Creator: United States. Bonneville Power Administration.
Partner: UNT Libraries Government Documents Department

PUREX new substation ATR

Description: This document is the acceptance test report (ATR) for the New PUREX Main and Minisubstations. It covers the factory and vendor acceptance and commissioning test reports. Reports are presented for the Main 5 kV substation building, the building fire system, switchgear, and vacuum breaker; the minisubstation control building and switch gear; commissioning test; electrical system and loads inspection; electrical utilities transformer and cable; and relay setting changes based on operational experience.
Date: May 12, 1997
Creator: Nelson, D.E.
Partner: UNT Libraries Government Documents Department

CENRTC Project {number_sign}2F3EOA, OCB A-386, acceptance test procedure

Description: This test procedure provides the steps necessary to verify correct functional operation of controls, annunciators, alarms, protective relays and related systems impacted by CENRTC {number_sign}2F3EOA, Microwave Transfer Trip Project, modification work performed under work package 6B-93-00043/M (CENRTC 2F3EOA MWTT OCB A-386 PACKAGE). This procedure separates four tests into separate sections: Energization of A-386 Duplex Panel and Circuits; Local RFL 6750 function tests and start-up; SCADA tests; and A-386 local trip tests.
Date: March 6, 1995
Creator: Akerson, A.W.
Partner: UNT Libraries Government Documents Department

Grizzly Substation Fiber Optics : Environmental Assessment.

Description: This notice announces BPA`s decision to construct, operate, and maintain the Grizzly Substation Fiber Optic Project (Project). This Project is part of a continuing effort by BPA to complete a regionwide upgrade of its existing telecommunications system. The US Forest Service and BPA jointly prepared the Grizzly Substation Fiber Optic Project Environmental Assessment (EA) (DOE/EA-1241) evaluating the potential environmental impacts of the Proposed Action, the Underground Installation Alternative, and the No Action Alternative. Based on the analysis in the EA, the US Forest Service and BPA have determined that the Proposed Action is not a major Federal action significantly affecting the quality of the human environment, within the meaning of the National Environmental Policy Act (NEPA) of 1969. Therefore, the preparation of an Environmental Impact Statement (EIS) is not required and BPA is issuing this FONSI. The US Forest Service has separately issued a FONSI and Decision Notice authorizing BPA to construct, operate, and maintain the Project within the Crooked River National Grassland (Grassland).
Date: February 1, 1998
Creator: United States. Bonneville Power Administration.
Partner: UNT Libraries Government Documents Department

CENRTC Project {number_sign}2F3EOA, OCB A-376, acceptance test procedure

Description: This test procedure provides the steps necessary to verify correct functional operation of controls, annunciators, alarms, protective relays and related systems impacted by CENRTC {number_sign}2F3E0A, Microwave Transfer Trip Project, modification work performed under work package 6B-93-00041/M. This procedure separates three tests into separate sections: energization of A-376 duplex panel and circuits; SCADA tests; and A-376 local trip tests.
Date: January 25, 1995
Creator: Akerson, A.W.
Partner: UNT Libraries Government Documents Department

The value of distributed generation: The PVUSA grid-support project serving Kerman Substation. Interim report, April 1994

Description: A common practice of electric utilities experiencing transmission and distribution (T and D) system overloads is to expand the substation, add lines, or upgrade equipment, all of which are capital intensive options. In 1988, it was hypothesized that strategically sited photovoltaics (PV) could benefit parts of T and D systems near or at overloaded conditions. An evaluation methodology was developed and applied to a test case (Kerman Substation near Fresno, California). Analytical results suggested that the value of PV to the T and D system could substantially exceed its energy and generation capacity value. The importance of this finding indicated the need for empirical validation. This led to the construction of a 0.5 MW PV demonstration plant by Pacific Gas and Electric Company (PG and E) at Kerman, California as part of the PVUSA (PV for Utility Scale Applications) project. PVUSA is a national public-private partnership that is assessing and demonstrating the viability of utility-scale photovoltaic electric generation systems. The Kerman PV plant, commissioned for commercial operation in June, 1993, is reported to be the first grid-support PV demonstration plant in the world. This Interim Report focuses on validating the technical aspects of grid-support PV. It provides interim validation results for four of the eight identified value components that stack up to make the ``value bar``, and compares them to 1992 Case Study estimates. Results are based on improved technical evaluation methodologies, measured plant performance under a variety of conditions, and long-term plant performance estimated using a validated computer simulation program. This report is not intended to be exhaustive in scope. It does, however, provide a thorough progress update of the validation project. Complete documentation of test procedures, data, and evaluation methods will be presented in the Final Report.
Date: July 1, 1994
Creator: Hoff, T. & Wenger, H.
Partner: UNT Libraries Government Documents Department

Design criteria for OSW alternate power

Description: The purpose of this project is threefold. First to provide a reliable and more continuous source of electrical power to the Operational Support Building-West (OSW) in order to better serve Mound financial and CAD computer facilities. This increased reliability shall be accomplished by the installation of a tie breaker that will connect the 480 volt secondary of the OSW substation with the 480 volt secondary of B substation, within 200 feet of the building. The OSW substation is in the penthouse of the four (4) story OSW building. The B substation is outside along the plant roadway. Installation of the tie breaker will also permit work to be done on the primary (12,470 volt) side of the transformer without a shutdown of the building. Secondly, the replacement of the OSW substation PCB transformer shall be done in order to eliminate the risk of a fire spreading PCB vapors to the building ventilation system. Thirdly, the replacement of the switchboard on the 480 volt secondary of the OSW substation with more reliable breakers. Also, the existing switches do not allow expansion of the 480 volt supply to building equipment. One of the new breakers shall supply power to a new power panel, thus providing breaker space for installation of new equipment.
Date: January 1, 1989
Creator: Saul, W.A.
Partner: UNT Libraries Government Documents Department

Repository surface design site layout analysis

Description: The purpose of this analysis is to establish the arrangement of the Yucca Mountain Repository surface facilities and features near the North Portal. The analysis updates and expands the North Portal area site layout concept presented in the ACD, including changes to reflect the resizing of the Waste Handling Building (WHB), Waste Treatment Building (WTB), Carrier Preparation Building (CPB), and site parking areas; the addition of the Carrier Washdown Buildings (CWBs); the elimination of the Cask Maintenance Facility (CMF); and the development of a concept for site grading and flood control. The analysis also establishes the layout of the surface features (e.g., roads and utilities) that connect all the repository surface areas (North Portal Operations Area, South Portal Development Operations Area, Emplacement Shaft Surface Operations Area, and Development Shaft Surface Operations Area) and locates an area for a potential lag storage facility. Details of South Portal and shaft layouts will be covered in separate design analyses. The objective of this analysis is to provide a suitable level of design for the Viability Assessment (VA). The analysis was revised to incorporate additional material developed since the issuance of Revision 01. This material includes safeguards and security input, utility system input (size and location of fire water tanks and pump houses, potable water and sanitary sewage rates, size of wastewater evaporation pond, size and location of the utility building, size of the bulk fuel storage tank, and size and location of other exterior process equipment), main electrical substation information, redundancy of water supply and storage for the fire support system, and additional information on the storm water retention pond.
Date: February 27, 1998
Creator: Montalvo, H. R.
Partner: UNT Libraries Government Documents Department

Tennessee Valley Authority Eagle Bend 161-kV delivery point environmental assessment

Description: Eagle Bend is an area located in a bend of the Clinch River about one mile southeast of Clinton, Tennessee, in Anderson County. This area, including an industrial park, is supplied electric power by the Clinton Utilities Board (UB) through its 69-kV system, which is in turn supplied by TVA over a 69-kV transmission line from Norris Hydro Plant. Studies of the power supply in the area indicate that there will likely be significant load growth both in the Clinton area in general and the industrial park in particular. Studies further show that if this new load is supplied at 69-kV, the TVA transformer at Norris Hydro which supplies this load will be overloaded by the summer of 1993 and no feasible alternate source which would maintain the quality and reliability of the power delivered to the Clinton system exists to accept this load. Clinton UB also needs to transfer load from its Clinton substation in the same time period to prevent overloading. Additional studies and consultation between TVA and Clinton UB have indicated that the best solution to this problem is to supply this load at 161-kV at a new delivery point for Clinton UB. This would require the construction of a new 161/13-kV substation by Clinton UB and the construction by TVA of a new 161-kV transmission line to connect this substation to the existing TVA 161-kV transmission system.
Date: February 5, 1993
Partner: UNT Libraries Government Documents Department

Navajo Electrification Demonstration Project

Description: The Navajo Electrification Demonstration Project (NEDP) is a multi-year project which addresses the electricity needs of the unserved and underserved Navajo Nation, the largest American Indian tribe in the United States. The program serves to cumulatively provide off-grid electricty for families living away from the electricty infrastructure, line extensions for unserved families living nearby (less than 1/2 mile away from) the electricity, and, under the current project called NEDP-4, the construction of a substation to increase the capacity and improve the quality of service into the central core region of the Navajo Nation.
Date: June 11, 2008
Creator: Battiest, Terry W.
Partner: UNT Libraries Government Documents Department

Procedures and criteria for increasing the earthquake resistance level of electrical substations and special installations

Description: This report defines a procedure and provides basic information needed to determine the modifications required to make electrical substations and special installations of the Bonneville Power Administration (BPA) more resistant to strong earthquake ground motion. It also provides a procedure for developing an effective plan for establishing the sequence, or priority, of providing the required modifications.
Date: September 30, 1973
Creator: Couch, R.W. & Deacon, R.J.
Partner: UNT Libraries Government Documents Department