Production test IP-278-A, Supplement A verification of BPA loss bulk temperature surge at the DR-Reactor
Description:
To run a second BPA outage test at the DR-Reactor using the same instrumentation and procedure but increasing the trip-out level fro 800 MW up to a maximum of 1200 MW.
Date:
January 7, 1960
Creator:
Jones, S. S.
Item Type:
Refine your search to only
Report
Partner:
UNT Libraries Government Documents Department