Irradiation Loop Studies of Organic Reactor Coolants Quarterly Report: July 1-September 30, 1961.
Description:
Irradiation of Santowax OMP was initiated in the M.I.T. Reactor Organic In-Pile Loop on August 9, 1961 and is continuing. As of September 30, 1961 the total absorbed dose to an average inventory of 5000 grams of coolant was 79,900 watt-hrs. In this same period of time approximately 35% of the terphenyls in the coolant have been degraded.
Date:
January 1, 1962
Creator:
Mason, Edward A. (Edward Allen), 1926-1994 & Bley, W. N.
Item Type:
Refine your search to only
Report
Partner:
UNT Libraries Government Documents Department