525 Matching Results

Search Results

Advanced search parameters have been applied.

Footprint Reduction Process: Using Remote Sensing and GIS Technologies to Identify Non-Contaminated Land Parcels on the Oak Ridge Reservation National Priorities List Site

Description: In 1989, the Agency for Toxic Substances and Disease Registry evaluated the entire 35,000-acre U. S: Department of Energy (DOE) Oak Ridge Reservation (ORR, located in Oak Ridge, TN) and placed it on the National Priorities List (NPL), making the ORR subject to Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) regulations. Although much of the ORR has not been impacted by previous federal activities, without investigation it is difficult to discern which parcels of land are free of surface contamination. In 1996, the DOE Oak Ridge Environmental Management Program (EM) funded the Footprint Reduction Project to: 1) develop a process to study the large areas of the ORR that are believed to be free of surface contamination and 2) initiate the delisting of the "clean" areas from the NPL. Although this project's goals do not include the transfer of federal property to non-federal entities, the process development team aimed to provide a final product with multiple uses. Therefore, the process was developed to meet the requirements of NPL delisting and the transfer of non- contaminated federal lands to future land users. Section 120 (h) of the CERCLA law identifies the requirements for the transfer of federal property that is currently part of an NPL site. Reviews of historical information (including aerial photography), field inspections, and the recorded chain of title documents for the property are required for the delisting of property prior to transfer from the federal government. Despite the widespread availability of remote sensing and other digital geographic data and geographic information systems (GIS) for the analysis of such data, historical aerial photography is the only geographic data source required for review under the CERCLA 120 (h) process. However, since the ORR Environmental Management Program had an established Remote Sensing Program, the Footprint Reduction Project included the development ...
Date: December 9, 1998
Creator: Halsey, P.A.; Kendall, D.T.; King, A.L. & Storms, R.A.
Partner: UNT Libraries Government Documents Department

Analytical services Organization Union Valley sample Preparation facility Polychlorinated Biphenyl (PCB) Annual Inventory Document

Description: The Analytical Services Organization (ASO), Union Valley Sample Preparation Facility (UVSPF), provides analytical testing in support of the Department of Energy (DOE), Oak Ridge Operations (ORO), and associated sites. Samples generated on the Oak Ridge Reservation (ORR) are routinely received at the WSPF for analytical evaluatiotiidentification. Many of these samples are polychlorinated biphenyl (PCB) regulated from a source or being sent to the facility to determine PCB content. PCB laboratory wastes in solid and liquid form are generated during the evaluation of these materials, requiring the WSPF staff to maintain formal storage areas for staging the materials prior to off-site shipment for disposal. The purpose of this report is to fulfill the requirements set forth in Title 40, Code of Federal Regulations (CFR), Part 761.180(a), Subpart J, which requires owners or operators of a facility using or storing PCBS to prepare an annual inventory document by July 1 of the current year which covers the previous calendar year. This report provides documentation of the inventory of PCB materials/wastes that were generated, stored for dispos~ and shipped off site for disposal for the period January 1, 1997, to January 1, 1998. The following is a summary of materials/wastes subject to the aforementioned reporting requirements.
Date: June 1, 1998
Creator: Brown, B. J.
Partner: UNT Libraries Government Documents Department

Evaluation of Calendar Year 1997 Groundwater and Surface Water Quality Data For The Chestnut Ridge Hydrogeologic Regime At The U.S. Department of Energy Y-12 Plant, Oak Ridge, Tennessee

Description: This report presents an evaluation of the groundwater monitoring data obtained in the Chestnut Ridge Hydrogeologic Regime (Chestnut Ridge Regime) during calendar year (CY) 1997. The Chestnut Ridge Regime encompasses a section of Chestnut Ridge bordered by the U.S. Department of Energy (DOE) Y-12 Plant in Bear Creek Valley (BCV) to the north, Scarboro Road to the eas~ Bethel Valley Road to the south, and an unnamed drainage basin southwest of the Y-12 Plant (Figure 1). Groundwater quality monitoring is performed at hazardous and nonhazardous waste management facilities in the regime under the auspices of the Y-12 Plant Groundwater Protection Program (GWPP). The CY 1997 monitoring data are presented in Calendar Year 1997 Annual Groundwater Monitoring Report for the Chestnut Ridge Hydrogeolo~"c Regime at the US. Department of Energy Y-12 Plant, Oak Ridge, Tennessee (MA Technical Services, Inc. 1998), which also presents results of site-specific monitoring data evaluations required under the Resource Conservation and Recovery Act (RCIL4) post-closure permit (PCP) for the Chestnut Ridge Regime
Date: September 1, 1998
Creator: Jones, S. B.
Partner: UNT Libraries Government Documents Department

Calendar Year 1997 Annual Groundwater Monitoring Report For The Bear Creek Hydrogeologic Regime at the U.S. Department of Energy Y-12 Plant, Oak Ridge, Tennessee

Description: This report contains the groundwater and surface water monitoring data obtained during calendar year (CY) 1997 in compliance with the Resource Conservation and Recovery Act (RCIU) post- closure permit (PCP) for the Bear Creek Hydrogeologic Regime (Bear Creek Regime), and as otherwise required by U.S. Department of Energy (DOE) Order 5400.1. In July 1997, the Temessee Department of Environment and Conservation (TDEC) approved several modifications to the RCRA post-closure corrective action monitoring requirements specified in the PCP. This report has been prepared in accordimce with these modified requirements.
Date: February 1, 1998
Creator: Jones, S.B.
Partner: UNT Libraries Government Documents Department

Reprocessing of Shallow Seismic Reflection Data to Image Faults Near a Hazardous Waste Site on the Oak Ridge Reservation, Tennessee

Description: Shallow seismic reflection data from Bear Creek Valley on the Oak Ridge Reservation demonstrates that spectral balancing and tomographic refraction statics can be important processing tools for shallow seismic data. At this site, reprocessing of data which had previously yielded no useable CMP stacked sections was successful after application of these processing techniques.
Date: December 30, 1997
Creator: Doll, W. E.
Partner: UNT Libraries Government Documents Department

Calendar Year 1997 Annual Groundwater Monitoring Report For The Chestnut Ridge Hydrogeologic Regime At The U.S. Department of Energy Y-12 Plant, Oak Ridge, Tennessee

Description: This report contains the groundwater monitoring data obtained during calendar year (CY) 1997 in compliance with the Resource Conservation and Recovery Act (RCRA) post-closure permit (PCP) for the Chestnut Ridge Hydrogeologic Regime (Chestnut Ridge Regime). In July 1997, the Tennessee Department of Environment and Conservation (TDEC) approved modifications to several of the permit conditions that address RCRA pow-closure corrective action groundwater monitoring at the Chestnut Ridge Security Pits (Security Pits), and RCIU4 post-closure detection groundwater monitoring at the Chestnut Ridge Sediment Disposal Basin (Sediment Disposal Basin) and Kerr Hollow Quarry. This report has been prepared in accordance with these modified permit requirements. Also included in this report are the groundwater and surface water monitoring data obtained during CY 1997 for the purposes ofi (1) detection monitoring at nonhazardous solid waste disposal facilities (SWDFS) in accordance with operating permits and applicable regulations, (2) monitoring in accordance with Comprehensive Environmental Response, Compensation, and Recove~ Act Records of Decision (now pefiormed under the Integrated Water Quality Program for the Oak Ridge Reservation), and (3) monitoring needed to comply with U.S. Department of Energy Order 5400.1.
Date: February 1, 1998
Creator: Jones, S.B.
Partner: UNT Libraries Government Documents Department

Calendar Year 1997 Annual Groundwater Monitoring Report For The Upper East Fork Poplar Creek Hydrogeologic Regime At The U.S. Department of Energy Y-12 Plant, Oak Ridge, Tennessee

Description: This report contains the groundwater monitoring data obtained during calendar year (CY) 1997 in compliance with the Resource Conservation Wd Recovery Act (RCRA) post-closure permit (PCP) for the Upper East Fork Poplar Creek Hydrogeologic Regime (East Fork Regime) at the U.S. Department of Energy (DOE) Y-12 Plant in Oak Ridge, Tennessee. Issued by the Tennessee Department of Environment and Conservation (TDEC), the PCP defines the RCRA post-closure corrective action monitoring requirements for the portion of the groundwater contaminant plume that has migrated into the East Fork Regime ftom the S-3 Ponds, a closed RCW-regulated former surface impoundment located in Bear Creek Valley near the west end of the Y-12 Plant. In addition to the RCIL4 post-closure corrective action monitoring results, this report contains the groundwater and surface water monitoring data obtained during CY 1997 to fulfill requirements of DOE Order 5400.1.
Date: February 1, 1998
Creator: Jones, S.B.
Partner: UNT Libraries Government Documents Department

Oak Ridge Reservation Federal Facility Agreement. Quarterly report for the Environmental Restoration Program. Volume 4, July 1995--September 1995

Description: This quarterly progress report satisfies requirements for the Environmental Restoration (ER) Program that are specified in the Oak Ridge Reservation Federal Facility Agreement (FFA) established between the U.S. Department of Energy (DOE), the U.S. Environmental Protection Agency (EPA), and the Tennessee Department of Environment and Conservation (TDEC). The reporting period covered herein is July through September 1995 (fourth quarter of FY 1995). Sections 1.1 and 1.2 provide respectively the milestones scheduled for completion during the reporting period and a list of documents that have been proposed for transmittal during the following quarter but have not been approved as FY 1995 commitments.
Date: October 1, 1995
Partner: UNT Libraries Government Documents Department

ORR Deer Hunt Monitoring Program

Description: The primary purpose for the initiation of deer hunts on the Oak Ridge Reservation (ORR) was deer population control to reduce collisions with vehicles and maintain a healthy herd and habitat. As of 1997, thirteen annual deer hunts have been conducted on the ORR. The deer hunt monitoring program (DHMP) has two components -- a field screening monitoring program and a confirmatory laboratory analysis program of both retained and randomly selected released deer samples.
Date: September 1999
Creator: Scofield, P. A. & Teasley, N. A.
Partner: UNT Libraries Government Documents Department

Regional forest-ABL coupling: influence on CO{sub 2} and climate. Progress to date

Description: A National Center for Atmospheric Research (NCAR) Integrated Sounding System (ISS) was deployed about 5 km east of the WLEF-TV tower in Chequamegon National Forest, Wisconsin. The tower is instrumented for high-precision, high-accuracy CO{sub 2} mixing ratio measurements at six levels up to 396 m above ground and continuous eddy-covariance flux measurements at three levels up to 396 km. The ISS, including boundary layer radar profile, radio acoustic sounding system, and rawinsonde system was operated from March through October of 1998 and 1999. The NCAR ISS was also deployed at the Walker Branch flux tower in Oak Ridge, Tennessee from March through November of 1999. Continuous observations of atmospheric structure including radar reflectivity and horizontal wind profiles were collected at each site, and rawinsondes were launched at midday once per week. Boundary layer depths were derived from the radar reflectivity data. A combination of tall tower and radar boundary layer depths was us ed to describe the seasonal evolution of the diurnal mixing depth and its relationship to local turbulent forcing and synoptic conditions. These depths were compared with model predictions from a General Circulation Model (GCM). The proposed method of computing the jump in CO{sub 2} mixing ratio across the convective boundary layer top was tested on data from September, 1995; a journal publication is in preparation. A paper describing the comparison between GCM boundary layer depths and the observations, as well as the covariance between mixing depth and surface fluxes (the forcing for the rectifier effect) has been drafted.
Date: August 31, 2001
Creator: Davis, Kenneth J.
Partner: UNT Libraries Government Documents Department

Environmental monitoring and surveillance on the Oak Ridge Reservation: 1995 data

Description: Environmental monitoring and surveillance are conducted on the Oak Ridge Reservation and its environs throughout the year. Environmental monitoring ensures that (1) the reservation is a safe place to work, (2) activities on the reservation do not adversely affect the neighboring communities, and (3) compliance is made with federal and state regulations. This document is a compilation of the monitoring and surveillance data for calendar year 1995. It is a tool for analysts in the fields of environmental monitoring and environmental restoration. The summary information found in the annual site environmental report was drawn from the contents of this document.
Date: October 1, 1996
Creator: Hamilton, L.V.
Partner: UNT Libraries Government Documents Department

Preliminary assessment of the ecological risks to wide-ranging wildlife species on the Oak Ridge Reservation. 1996 update

Description: More than approximately 50 years of operations, storage, and disposal of wastes generated by the three facilities on the Oak Ridge Reservation (ORR) (the Oak Ridge K-25 Site, Oak Ridge National Laboratory, and the Oak Ridge Y-12 Plant) has resulted in a mosaic of uncontaminated property and lands that are contaminated to varying degrees. This contaminated property includes source areas and the terrestrial and aquatic habitats down gradient from these source areas. Although the integrator OUs generally contain considerable habitat for biota, the source OUs provide little or no suitable habitat. Historically, ecological risk assessment at Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) sites has focused on species that may be definitively associated with a contaminated area or source OU. Endpoints considered in source OUs include plants, soil/litter invertebrates and processes, aquatic biota found in on-OU sediments and surface waters, and small herbivorous, omnivorous, and vermivorous (i.e., feeding on ground, litter, or soil invertebrates) wildlife. All of these endpoints have limited spatial distributions or home ranges such that numerous individuals or a distinct population can be expected to reside within the boundaries of the source OU. Most analyses are not adequate for large sites with multiple, spatially separated contaminated areas such as the ORR that provide habitat for wide-ranging wildlife species. This report is a preliminary response to a plan for assessing risks to wide-ranging species.
Date: September 1, 1996
Creator: Sample, B.E.; Hinzman, R.L.; Jackson, B.L. & Baron, L.
Partner: UNT Libraries Government Documents Department

Development, Demonstration, Testing, and Evaluation Efforts Associated with the Oak Ridge Reservation`s Land Disposal Restrictions Federal Facility Compliance Agreement

Description: On June 12, 1992, the U. S. Department of Energy Oak Ridge Operations Office and the U. S. Environmental Protection Agency (EPA) Region IV signed a Federal Facility Compliance Agreement (FFCA) to regulate the treatment of wastes governed by the Land Disposal Restrictions (LDR) of the Resource Conservation and Recovery Act (RCRA). Compliance Requirement 5 of the agreement states that `. . . DOE shall submit to EPA for review and approval a plan for the treatment of the LDR prohibited wastes identified in Appendices 1B, 2B, and 3B. This plan must identify the treatment strategy for such wastes to meet LDR treatment standards and must include a schedule, not to exceed two (2) years after the submittal of this plan (i.e., March 1995), for the evaluation and prioritization of treatment method options, treatability studies, if required, and technology development. The FFCA divided the mixed wastes currently stored on the Oak Ridge Reservation (ORR) into two categories. Appendix A listed those wastes for which existing treatment methods and facilities exist. Appendix B listed wastes for which no identified treatment methods or facilities exist on the ORR.
Date: December 1995
Creator: Abraham, T. J. & Conley, T. B.
Partner: UNT Libraries Government Documents Department

Status Report: A Hydrologic Framework for the Oak Ridge Reservation

Description: The Oak Ridge Reservation Hydrology and Geology Study (ORRHAGS) was established in 1989 as an integrated study of the hydrology, geology, and soils of the reservation in support of the extensive activities in environmental monitoring, environmental restoration, waste management, and regulatory compliance on the Oak Ridge Reservation (ORR) of the US Department of Energy (DOE). The Hydrologic Studies Task of ORRHAGS is designed to provide essential information about the hydrologic environment of the ORR to those responsible for dealing with environmental issues, including restoration, environmental monitoring, and waste management, compliance, and enforcement. In order to ensure optimum environmental protection, these systems and their elements must be better understood and quantified. Additionally, in light of the enormous costs attached to environmental protection, restoration, monitoring, and waste management, these activities must be planned and implemented as efficiently as possible. A practical understanding of the hydrologic systems is required for all the objectives associated with contaminants in the hydrologic environment of the ORR. This report describes the current status of the development of a workable framework for the hydrology of the ORR. The framework is based mostly on data and information available from previous investigations.
Date: January 1, 1992
Creator: Solomon, D.K.
Partner: UNT Libraries Government Documents Department

Resource Conservation and Recovery Act (RCRA) Closure Plan Summary for Interim reasctive Waste Treatment Area (IRWTA)

Description: This closure plan has been prepared for the interim Reactive Waste Treatment Area (IRWT'A) located at the Y-12 Pkmt in oak Ridge, Tennessee (Environmental Protection Agency [EPA] Identification TN 389-009-0001). The actions required to achieve closure of the IRWTA are outlined in this plan, which is being submitted in accordance with Tennessee Ruie 1200- 1-1 1-.0S(7) and Title 40, Code of Federal Regulations (CFR), Part 265, Subpart G. The IRWTA was used to treat waste sodium and potassium (NaK) that are regulated by the Resource Conservation and Recovery Act (RCRA). The location of the IRWT'A is shown in Figures 1 and 2, and a diagram is shown in Figure 3. This pkm details all steps that wdi be petiormed to close the IRWTA. Note that this is a fmai ciosure.and a diagram is shown in Figure 3. This pkm details all steps that wdi be petiormed to close the IRWTA. Note that this is a fmai ciosure.
Date: July 1, 1997
Creator: Collins, E.T.
Partner: UNT Libraries Government Documents Department

Predicting Sediment and Cesium-137 Transported to Offsite During Extreme Floods

Description: This paper presents the methods and results of a research project for predicting contaminated sediment transport from Oak Ridge Reservation to offside under potential extreme flood conditions. A computer model, Hydrologic Simulation Program--FORTRANE (HSPF), was calibrated and validated for White Oak Creek watershed using a five-year data. The model was then used to quantify the effects of a potential 100-year flood event in terms of the sediment transport and {sup 137}Cs movement. Results from computer simulation showed that during a 100-year flood event the watershed and channel bed became the major sources of the {sup 137}Cs. A 100-year flood event may result in 3.2 Ci of the total annual release of {sup 137}Cs which is six times of the averaged annual release observed during a five-year time period.
Date: April 12, 1999
Creator: Bao, Y.
Partner: UNT Libraries Government Documents Department

Finding of no significant impact: Changes in the sanitary sludge land application program on the Oak Ridge Reservation, Oak Ridge, Tennessee

Description: The U.S. Department of Energy (DOE) has completed an environmental assessment (DOE/EA-1042) that evaluates potential impacts of proposed changes in the sanitary sludge land application program on the DOE Oak Ridge Reservation (ORR), Oak Ridge, Tennessee. Changes in lifetime sludge land application limits and radionuclide loading are proposed, and two new sources of sewage sludge from DOE facilities would be transported to the City of Oak Ridge Publicly Owned Treatment Works (COR POTW). Lifetime sludge land application limits would increase from 22 tons/acre to 50 tons/acre, which is the limit approved and permitted by the Tennessee Department of Environment and Conservation (TDEC). With the approval of TDEC, the permissible radiological dose from sludge land application would change from the current limit of 2x background radionuclide concentrations in receiving soils to a risk-based dose limit of 4 millirem (mrem) per year for the maximally exposed individual. Sludge land application sites would not change from those that are currently part of the program. Based on the results of the analysis reported in the EA, DOE has determined that the proposed action is not a major federal action that would significantly affect the quality of the human environment within the context of the National Environmental Policy Act of 1969 (NEPA). Therefore, preparation of an environmental impact statement (EIS) is not necessary, and DOE is issuing this Finding of No Significant Impact (FONSI). 70 refs., 2 figs., 17 tabs.
Date: October 1, 1996
Partner: UNT Libraries Government Documents Department

Evaluation of Calendar Year 1997 Groundwater and Surface Water Quality Data For The Upper East Fork Poplar Creek Hydrogeologic Regime At The U.S. Department of Energy Y-12 Plant, Oak Ridge, Tennessee

Description: 1 1.0 INTRODUCTION This report presents an evaluation of the groundwater quality monitoring data reported in: Calendar Year 1997 Annual Groundwatw Monitoring Report for the Upper East Fork Poplar Creek Hydrogeologtc Rep-meat the US. Department of Energy Y-12 Plant, Oak Ridge, Tennessee (AJA Technical Services, Inc. 1998), which is hereafter referenced as the Annual Monitoring Report. Section 2.0 presents background information for the Upper East Fork Poplar Creek Hydrogeologic Regime (East Fork Regime) that is relevant to data evaluation, including brief descriptions of the geology, the groundwater flow system, the contaminant source areas, and the extent of groundwater contamination in the regime. Section 3.0 provides an overview of the groundwater sampling and analysis activities petiormed during calendar year (CY) 1997, including monitoring well locations, sampling frequency and methods, and laboratory analyses. Evaluation and interpretation of the monitoring da% described in Section 4.0, is generally focused on an overview of data quality assurance/quality control (QA/QC), long-term concentration trends for selected inorganic, organic, and radiological contaminants, and consistency with applicable site-specific conceptual contaminant transport models described in: Report on the Remedial Investigation of the Upper East Fork Poplar Creek Characterization Area at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee (U.S. Department of Energy 1998), which is referenced hereafter as the Remedial Investigation @I) Report. Findings of the data evaluations are summarized :in Section 5.0 and a list of technical reports and regulatory documents cited for more detailed irdormation (Section 6.0) concludes the report. All of the illustrations (maps and trend graphs) and data summary tables referenced in the text are presented in Appendm A and Appendix B, respectively. Appendix C provides a summary of the analytical results that meet applicable data quality objectives (DQOS) of the Y-12 Plant Groundwater Protection Program.
Date: September 1, 1998
Creator: Jones, S. B.
Partner: UNT Libraries Government Documents Department

Effective porosity and pore-throat sizes of mudrock saprolite from the Nolichucky Shale within Bear Creek Valley on the Oak Ridge Reservation: Implications for contaminant transport and retardation through matrix diffusion

Description: Specimens of saprolite developed from mudrock of the Nolichucky Shale (Upper Cambrian, Conasauga Group) from the Whiteoak Mountain thrust sheet on the Oak Ridge Reservation (ORR) were analyzed. Petrophysical techniques include helium porosimetry and mercury porosimetry. Petrophysical data obtained from the laboratory experiments include effective porosity, pore-throat sizes and their distribution, specimen bulk-density, and specimen grain-density. It is expected that the data from this study will significantly contribute to constraining the modeling of the hydrologic behavior of saprolite developed from mudrock of the Conasauga Group in general and from the Nolichucky Shale specifically.
Date: May 1, 1996
Creator: Dorsch, J. & Katsube, T.J.
Partner: UNT Libraries Government Documents Department

Terrestrial habitat mapping of the Oak Ridge Reservation: 1996 Summary

Description: The US DOE is in the process of remediating historical contamination on the Oak Ridge Reservation (ORR). Two key components are ecological risk assessment and monitoring. In 1994 a strategy was developed and a specific program was initiated to implement the strategy for the terrestrial biota of the entire ORR. This document details results of the first task: development of a habitat map and habitat models for key species of interest. During the last 50 years ORR has been a relatively protected island of plant and animal habitats in a region of rapidly expanding urbanization. A preliminary biodiversity assessment of the ORR by the Nature Conservancy in 1995 noted 272 occurrences of significant plant and animal species and communities. Field surveys of threatened and endangered species show that the ORR contains 20 rare plant species, 4 of which are on the state list of endangered species. The rest are either on the state list of threatened species or listed as being of special concern. The ORR provides habitat for some 60 reptilian and amphibian species; more than 120 species of terrestrial birds; 32 species of waterfowl, wading birds, and shorebirds; and about 40 mammalian species. The ORR is both a refuge for rare species and a reservoir of recruitment for surrounding environments and wildlife management areas. Cedar barrens, river bluffs, and wetlands have been identified as the habitat for most rare vascular plant species on the ORR.
Date: September 1, 1996
Creator: Washington-Allen, R.A. & Ashwood, T.L.
Partner: UNT Libraries Government Documents Department

Standard process for the roles and responsibilities for facility reuse of DOE Oak Ridge Reservation Facilities

Description: The purpose of this report is to provide an understanding of the standard process for the lease or sale of facilities, equipment, and real property for the Oak Ridge Reservation (ORR). The objective of this process is to facilitate the reindustrialization of the ORR for the Department of Energy (DOE). The roles and responsibilities in this standard, as defined in the attached narrative and flow diagrams, were agreed upon among various representatives from the DOE-Oak Ridge Operations Office (DOE-ORO), Lockheed Martin Energy Systems, Inc. (LMES), and the Community Reuse Organization of East Tennessee (CROET). Reindustrialization for the DOE encompasses several areas which include: facilities reuse, materials and equipment recycling, and worker transition activities. The DOE-ORO`s vision for the ORR is to have completed the reindustrialization activities for the K-25 Site by the year 2010. Several steps have already been taken to aggressively pursue this vision, such as determining the most efficient and cost-effective ways to expedite the facilities reuse process. This report provides the time-phased, step-by-step, process for the lease or sale of facilities, equipment, land, and suggestions on streamlining the required regulatory processes.
Date: April 1, 1996
Creator: Loebl, A.S.; Trost, D.G.; Pastel, J.A.; Payne, S.G. & Fleenor, R.M.
Partner: UNT Libraries Government Documents Department