Search Results

Advanced search parameters have been applied.
open access

Using Motor Electrical Signature Analysis to Determine the Mechanical Condition of Vane-Axial Fans

Description: The purpose of this research was a proof of concept using a fan motor stator as transducer to monitor motor rotor and attached axial fan for mechanical motion. The proof was to determine whether bearing faults and fan imbalances could be detected in vane-axial fans using Motor Electrical Signature Analysis (MESA). The data was statistically analyzed to determine if the MESA systems could distinguish between baseline conditions and discrete fault frequencies for the three test conditions: beari… more
Date: August 2002
Creator: Doan, Donald Scott
Partner: UNT Libraries
open access

20,000 KW Nuclear Power Plant Study for United States Atomic Energy Commission

Description: Introduction: In September of 156, Gilbert Associates, Inc., entered into a contract with the United States of America, acting through the United States Atomic Energy Commission, for the study and preliminary design of a nuclear power plant being considered for integration into a central station power system at an overseas site.
Date: July 7, 1957
Creator: Gilbert Associates, Inc.
Partner: UNT Libraries Government Documents Department
open access

Report of the Advisory Committee on Construction During Adjudication

Description: Abstract: In the Nuclear Regulatory Commission's Seabrook Opinion of January 6, 1978, the Commission directed that an internal study be made of: (1) the effect which would be achieved by relaxation of NRC's stay standards so that site-related issues in potentially troublesome nuclear power plant licensing proceedings could be taken up before utilities invest large sums of money and sites are irrevocably altered; and (2) ways in which the NRC's appellate administrative procedures could assure ea… more
Date: January 1980
Creator: Milhollin, Gary
Partner: UNT Libraries Government Documents Department
open access

PM-1 Nuclear Power Plant Program: 3rd Quarterly Progress Report, September 1, 1959-November 30, 1959

Description: From abstract: The principal efforts are the furthering of the final design and preparation of specifications for some long-lead components. The entire power plant has been divided, for final design purposes, into 37 subsystems. The status of work on each subsystem at the close of the period is reported.
Date: March 1960
Creator: Martin Company. Nuclear Division.
Partner: UNT Libraries Government Documents Department
open access

PM-1 Nuclear Power Plant Program: 4th Quarterly Progress Report, December 1, 1959-February 29, 1960

Description: From abstract: The principal efforts during the fourth project quarter were the near-completion of the final design and preparation of specifications for plant components. Reactor development work included final preparations for the flexible zero-power test (PMZ-1) program and revised fuel element irradiation test program, continuation of reactor flow test, further work on heat transfer test program, and final design and fabrication of the prototype magnetic jack-type control rod actuators.
Date: April 5, 1960
Creator: Martin Company. Nuclear Division.
Partner: UNT Libraries Government Documents Department
open access

PM-1 Nuclear Power Plant Program: 5th Quarterly Progress Report, March 1, 1960-May 31, 1960

Description: From abstract: Reactor development work includes: initiation of the flexible zero-power test (PMZ-1) experimental program, fabrication and delivery of a PM-1 type fuel element, continuation of reactor flow and heat transfer tests, development work on rare earth control rods, and testing and redesign of the prototype magnetic jack-type control rod actuator.
Date: July 5, 1960
Creator: Martin Company. Nuclear Division.
Partner: UNT Libraries Government Documents Department
open access

PM-1 Nuclear Power Plant Program: Final Progress Report, September 1, 1962 Through Completion

Description: From abstract: The principal efforts during the final period were concerned with plant testing, modifications to the plant to enable it to produce full design load at high ambient temperatures, the compilation and evaluation of plant performance data, preparation of documents and transfer of the plant to the AEC and final resolution of all outstanding contract scope items.
Date: July 15, 1963
Partner: UNT Libraries Government Documents Department
open access

PM-3A Nuclear Power Plant Program

Description: From summary: Progress report on the production of detailed piping and equipment installation drawings for the PM-3A nuclear power plant program. Attention has been paid to the procurement of those valves and specialty items associated with the piping system.
Date: July 21, 1961
Creator: Martin Company. Nuclear Division.
Partner: UNT Libraries Government Documents Department
open access

PM-1 Nuclear Power Plant Program: Plant Performance Studies, Final Periodic Report, September 1, 1962 to December 31, 1962

Description: From abstract: Data obtained during the performance testing of the PM-1 plant was compiled and evaluated. It is concluded from the data that the plant performance in general meets or exceeds specifications. Transient and steady-state electrical fluctuations are well within specified limitations. Heat balance data for both the primary and secondary systems agree reasonably well with design predictions. Radiation levels are below those anticipated.
Date: April 1963
Partner: UNT Libraries Government Documents Department
open access

Development Program for Increased Output in the Garigliano Nuclear Reactor. Quarterly Report No. 4

Description: The United States and the European Atomic Energy Community (Euratom), on May 29, and June 18, 1958, signed an agreement which provides a basis for co-operation in programs for the advancement of the peaceful applications of atomic energy. The work described in this report represents the Joint U.S.-Euratom effort. The over-all development program is designed to obtain the test data and operating experience necessary to eventually realize a 50 percent increase in the output of the Garigliano Nucl… more
Date: October 1, 1963
Creator: Sorlie, T.
Partner: UNT Libraries Government Documents Department
open access

Development Program for Increased Output in the Garigliano Nuclear Reactor. Quarterly Report No. 2

Description: The United States and the European Atomic Energy Community (Euratom), on May 29, and June 18, 1958, signed an agreement which provides a basis for co-operation in programs for the advancement of the peaceful applications of atomic energy. The work described in this report represents the Joint U.S.-Euratom effort. The over-all development program is designed to obtain the test data and operating experience necessary to eventually realize a 50 percent increase in the output of the Garigliano Nuc… more
Date: April 1, 1963
Creator: Quinn, E. P.
Partner: UNT Libraries Government Documents Department
open access

Development Program for Increased Output in the Garigliano Nuclear Reactor. Quarterly Report No. 3

Description: The United States and the European Atomic Energy Community (Euratom), on May 29, and June 18, 1958, signed an agreement which provides a basis for co-operation in programs for the advancement of the peaceful applications of atomic energy. The work described in this report represents the Joint U.S.-Euratom effort. The over-all development program is designed to obtain the test data and operating experience necessary to eventually realize a 50 percent increase in the output of the Garigliano Nucl… more
Date: July 1, 1963
Creator: Sorlie, T.
Partner: UNT Libraries Government Documents Department
open access

Nuclear Analysis of PM Long Life Core 3

Description: Introduction. Under AEC contract the Martin Company has followed up the design and construction of the PM-1 and PM-3A nuclear power plants with R&D efforts seeking improved plant efficiency, increased core life and higher operating power. The Advanced PM cores have evolved step by step, with the addition of degrees of freedom to design latitude. A first replacement core, Core 2, has been designed to achieve 50 percent greater life than PM-1 through relatively minor design changes. Core 3 re… more
Date: November 1963
Creator: Bagley, Raymond. & George, Critz.
Partner: UNT Libraries Government Documents Department
open access

Preliminary Design 30,000 KW Prototype Partially Enriched Uranium, Gas Cooled, Graphite Moderated Nuclear Power Plant (Prototype of an Optimum Plant) for United States Atomic Energy Commission, Idaho Operations Office contract no. AT(10-1)-925

Description: Report containing the preliminary design for a nuclear reactor plant and its facilities. Includes a description of systems, safety procedures, costs, and a glossary.
Date: March 1959
Creator: Kaiser Engineers
Partner: UNT Libraries Government Documents Department
Back to Top of Screen