3,056 Matching Results

Search Results

Advanced search parameters have been applied.

Nuclear Power Plant Security and Vulnerabilities

Description: This report discusses the physical security at nuclear power plants and concerns of radiological sabotage, a deliberate act against a plant that could directly or indirectly endanger public health and safety through exposure to radiation.
Date: January 3, 2014
Creator: Holt, Mark & Andrews, Anthony
Partner: UNT Libraries Government Documents Department

An Evaluation of the Calder Hall Type of Nuclear Power Plant

Description: Abstract: Presented herein is the preliminary design of a natural uranium, graphite moderated, CO2-cooled reactor and power plant similar to, but larger than, the British Calder Hall plant, with a net electrical output of 130 MWE.
Date: January 18, 1957
Creator: Banks, William F.; Schneider, G. A.; Morgan, William T. & Ash, E. B.
Partner: UNT Libraries Government Documents Department

PM-1 Nuclear Power Plant Program: Final Progress Report, September 1, 1962 Through Completion

Description: From abstract: The principal efforts during the final period were concerned with plant testing, modifications to the plant to enable it to produce full design load at high ambient temperatures, the compilation and evaluation of plant performance data, preparation of documents and transfer of the plant to the AEC and final resolution of all outstanding contract scope items.
Date: July 15, 1963
Partner: UNT Libraries Government Documents Department

PM-1 Nuclear Power Plant Program: Plant Performance Studies, Final Periodic Report, September 1, 1962 to December 31, 1962

Description: From abstract: Data obtained during the performance testing of the PM-1 plant was compiled and evaluated. It is concluded from the data that the plant performance in general meets or exceeds specifications. Transient and steady-state electrical fluctuations are well within specified limitations. Heat balance data for both the primary and secondary systems agree reasonably well with design predictions. Radiation levels are below those anticipated.
Date: April 1963
Partner: UNT Libraries Government Documents Department

Study of Remote Military Power Applications: Report 3, Guam, Mariana Islands

Description: From introduction: The study is essentially an economic evaluation of the construction and operation of nuclear power plants at several designated military installations where increased power generating capabilities of 5 to 40 mwe may be required by the Government during the period 1963 through 1970.
Date: July 1960
Partner: UNT Libraries Government Documents Department

Study of Remote Military Power Applications: Report 4, Thule Air Base, Greenland

Description: From introduction: The study is essentially an economic evaluation of the construction and operation of nuclear power plants at several designated military installations where increased power generating capabilities of 5 to 40 mwe may be required by the Government during the period 1963 through 1970.
Date: July 1960
Partner: UNT Libraries Government Documents Department

Study of Remote Military Power Applications: Report 6, Fourth U.S. ASA Field Station Asmara, Eritrea

Description: From introduction: The study is essentially an economic evaluation of the construction and operation of nuclear power plants at several designated military installations where increased power generating capabilities of 5 to 40 mwe may be required by the Government during the period 1963 through 1970.
Date: July 1960
Partner: UNT Libraries Government Documents Department

Study of Remote Military Power Applications: Report 7, Super Sage Rocky Mountains Area

Description: From introduction: The study is essentially an economic evaluation of the construction and operation of nuclear power plants at several designated military installations where increased power generating capabilities of 5 to 40 mwe may be required by the Government during the period 1963 through 1970.
Date: July 1960
Partner: UNT Libraries Government Documents Department

Study of Remote Military Power Applications: Report 8, Nike-Zeus Far Site

Description: From introduction: The study is essentially an economic evaluation of the construction and operation of nuclear power plants at several designated military installations where increased power generating capabilities of 5 to 40 mwe may be required by the Government during the period 1963 through 1970.
Date: July 1960
Partner: UNT Libraries Government Documents Department

Study of Remote Military Power Applications: Report 10, Atlantic Barge

Description: From introduction: The study is essentially an economic evaluation of the construction and operation of nuclear power plants at several designated military installations where increased power generating capabilities of 5 to 40 mwe may be required by the Government during the period 1963 through 1970.
Date: July 1960
Partner: UNT Libraries Government Documents Department

PM-3A Nuclear Power Plant Program

Description: From summary: Progress report on the production of detailed piping and equipment installation drawings for the PM-3A nuclear power plant program. Attention has been paid to the procurement of those valves and specialty items associated with the piping system.
Date: July 21, 1961
Creator: Martin Company. Nuclear Division.
Partner: UNT Libraries Government Documents Department

Power Cost Normalization Studies Civilian Power Reactor Program - 1959

Description: Introduction: In connection with the development of a comprehensive plan for a ten year civilian power reactor program, the Evaluation and Planning Branch, Division of Reactor Development, United States Atomic Energy Commission has had a series of status reports prepared to present a comprehensive review of the technical and economic status of various nuclear power reactor concepts.
Date: January 1960
Creator: Sargent & Lundy
Partner: UNT Libraries Government Documents Department

Piqua Nuclear Power Facility Operations Analysis Program Progress Report Number 5: July-December 1964

Description: Progress report for the Piqua Reactor Operations Analysis Program describing observations and analyses at the Piqua Nuclear Power Facility (PNPF). The program goals are to monitor operations and collect data in order to ensure that the plant's operation is safe, to improve design and performance, to evaluate the performance and lifetime of the plant's components and systems, to evaluate plant safety and safeguards, and to disseminate all information to the scientific community.
Date: June 15, 1965
Partner: UNT Libraries Government Documents Department

Piqua Nuclear Power Facility Operations Analysis Program Progress Report Number 2: 1963

Description: Progress report for the Piqua Reactor Operations Analysis Program describing observations and analyses at the Piqua Nuclear Power Facility (PNPF). The program goals are to monitor operations and collect data in order to ensure that the plant's operation is safe, to improve design and performance, to evaluate the performance and lifetime of the plant's components and systems, to evaluate plant safety and safeguards, and to disseminate all information to the scientific community.
Date: November 30, 1963
Creator: Auleta, J. J.
Partner: UNT Libraries Government Documents Department

Piqua Nuclear Power Facility Operations Analysis Program Progress Report Number 3: July-December 1963

Description: Progress report for the Piqua Reactor Operations Analysis Program describing observations and analyses at the Piqua Nuclear Power Facility (PNPF). The program goals are to monitor operations and collect data in order to ensure that the plant's operation is safe, to improve design and performance, to evaluate the performance and lifetime of the plant's components and systems, to evaluate plant safety and safeguards, and to disseminate all information to the scientific community.
Date: July 15, 1964
Creator: Auleta, J. J.
Partner: UNT Libraries Government Documents Department