2,955 Matching Results

Search Results

Advanced search parameters have been applied.

An Evaluation of the Calder Hall Type of Nuclear Power Plant

Description: Abstract: Presented herein is the preliminary design of a natural uranium, graphite moderated, CO2-cooled reactor and power plant similar to, but larger than, the British Calder Hall plant, with a net electrical output of 130 MWE.
Date: January 18, 1957
Creator: Banks, William F.; Schneider, G. A.; Morgan, William T. & Ash, E. B.
Partner: UNT Libraries Government Documents Department

PM-1 Nuclear Power Plant Program: Final Progress Report, September 1, 1962 Through Completion

Description: From abstract: The principal efforts during the final period were concerned with plant testing, modifications to the plant to enable it to produce full design load at high ambient temperatures, the compilation and evaluation of plant performance data, preparation of documents and transfer of the plant to the AEC and final resolution of all outstanding contract scope items.
Date: July 15, 1963
Partner: UNT Libraries Government Documents Department

PM-1 Nuclear Power Plant Program: Plant Performance Studies, Final Periodic Report, September 1, 1962 to December 31, 1962

Description: From abstract: Data obtained during the performance testing of the PM-1 plant was compiled and evaluated. It is concluded from the data that the plant performance in general meets or exceeds specifications. Transient and steady-state electrical fluctuations are well within specified limitations. Heat balance data for both the primary and secondary systems agree reasonably well with design predictions. Radiation levels are below those anticipated.
Date: April 1963
Partner: UNT Libraries Government Documents Department

Study of Remote Military Power Applications: Report 8, Nike-Zeus Far Site

Description: From introduction: The study is essentially an economic evaluation of the construction and operation of nuclear power plants at several designated military installations where increased power generating capabilities of 5 to 40 mwe may be required by the Government during the period 1963 through 1970.
Date: July 1960
Partner: UNT Libraries Government Documents Department

PM-3A Nuclear Power Plant Program

Description: From summary: Progress report on the production of detailed piping and equipment installation drawings for the PM-3A nuclear power plant program. Attention has been paid to the procurement of those valves and specialty items associated with the piping system.
Date: July 21, 1961
Creator: Martin Company. Nuclear Division.
Partner: UNT Libraries Government Documents Department

Power Cost Normalization Studies Civilian Power Reactor Program - 1959

Description: Introduction: In connection with the development of a comprehensive plan for a ten year civilian power reactor program, the Evaluation and Planning Branch, Division of Reactor Development, United States Atomic Energy Commission has had a series of status reports prepared to present a comprehensive review of the technical and economic status of various nuclear power reactor concepts.
Date: January 1960
Creator: Sargent & Lundy
Partner: UNT Libraries Government Documents Department

ABWR: PL-2 Design Report

Description: From preface: This report satisfies the quarterly progress report requirements for PL-1 and PL-2 plant design work for the period ending September 30, 1960 At present time a SL-1 Core 2 is under construction. This is a replacement core for SL-1 (ALPR) and will be identical to a PL-2 core; a PL condenser is under test at the SL-1 facility; final construction plans for PL components and modules which are not site sensitive will be completed in March 1961.
Date: October 15, 1960
Creator: Combustion Engineering, inc. Nuclear Division.
Partner: UNT Libraries Government Documents Department

Owners of Nuclear Power Plants

Description: Commercial nuclear power plants in this country can be owned by a number of separate entities, each with varying ownership proportions. Each of these owners may, in turn, have a parent/subsidiary relationship to other companies. In addition, the operator of the plant may be a different entity as well. This report provides a compilation on the owners/operators for all commercial power reactors in the United States. While the utility industry is currently experiencing changes in organizational structure which may affect nuclear plant ownership, the data in this report is current as of November 1999. The report is divided into sections representing different aspects of nuclear plant ownership.
Date: January 12, 2000
Creator: Reid, R. L.
Partner: UNT Libraries Government Documents Department

Aging Nuclear Power Plants: Managing Plant Life and Decommissioning

Description: This report examines the following: the outlook for safety management and economic life decisions for the Nation’s existing nuclear power plants as they age, the prospects for decommissioning, and current and potential Federal efforts that could contribute to more timely and better informed decisions regarding plant life and decommissioning.
Date: September 1993
Creator: United States. Congress. Office of Technology Assessment.
Partner: UNT Libraries Government Documents Department

Engineering Geology of the Proposed Nuclear Power Plant Site on Bodega Head, Sonoma County, California

Description: From abstract: "This report summarizes the geology of a shaft excavated for the proposed nuclear reactor and discusses geologic features on Bodega Head and on Point Reyes peninsula that relate to geologic aspects of earthquake-resistant design."
Date: December 1963
Creator: Schlocker, Julius & Bonilla, Manuel G.
Partner: UNT Libraries Government Documents Department

Boiling Water Reactor Study [Part 1]: 306 Mw Power Reactor Conceptual Design

Description: From introduction: In general, the objective of this study is to provide for the development of the conceptual design criteria for the most promising type of boiling water reactor and associated complete electrical generating plant consistent with a schedule calling for start of construction in July 1960.
Date: July 1959
Creator: Ebasco Services Incorporated
Partner: UNT Libraries Government Documents Department