Search Results

Advanced search parameters have been applied.
open access

Renewable Resources: a national catalog of model projects. Volume 2. Mid-American Solar Energy Complex Region

Description: This compilation of diverse conservation and renewable energy projects across the United States was prepared through the enthusiastic participation of solar and alternate energy groups from every state and region. Compiled and edited by the Center for Renewable Resources, these projects reflect many levels of innovation and technical expertise. In many cases, a critique analysis is presented of how projects performed and of the institutional conditions associated with their success or failure. … more
Date: July 1, 1980
Partner: UNT Libraries Government Documents Department
open access

Renewable Resources: a national catalog of model projects. Volume 1. Northeast Solar Energy Center Region

Description: This compilation of diverse conservation and renewable energy projects across the United States was prepared through the enthusiastic participation of solar and alternate energy groups from every state and region. Compiled and edited by the Center for Renewable Resources, these projects reflect many levels of innovation and technical expertise. In many cases, a critique analysis is presented of how projects performed and of the institutional conditions associated with their success or failure. … more
Date: July 1, 1980
Partner: UNT Libraries Government Documents Department
open access

Fundamental economic issues in the development of small scale hydro

Description: Some basic economic issues involved in the development of small-scale hydroelectric power are addressed. The discussion represents an economist's view of the investment process in this resource. Very little investment has been made in small-scale hydro development and an attempt is made to show that the reason for this may not be that the expected present worth of the returns of the project do not exceed the construction cost by a sufficient amount. Rather, a set of factors in combination impos… more
Date: May 1, 1980
Partner: UNT Libraries Government Documents Department
open access

Renewable Resources: a national catalog of model projects. Volume 4. Western Solar Utilization Network Region

Description: This compilation of diverse conservation and renewable energy projects across the United States was prepared through the enthusiastic participation of solar and alternate energy groups from every state and region. Compiled and edited by the Center for Renewable Resources, these projects reflect many levels of innovation and technical expertise. In many cases, a critique analysis is presented of how projects performed and of the institutional conditions associated with their success or failure. … more
Date: July 1, 1980
Partner: UNT Libraries Government Documents Department
open access

Analysis of environmental issues related to small scale hydroelectric development. II. Design considerations for passing fish upstream around dams. Environmental Sciences Division Publication No. 1567

Description: The possible requirement of facilities to move migrating fish upstream around dams may be a factor in determining the feasibility of retrofitting small dams for hydroelectric generation. Basic design considerations are reported that should be evaluated on a site-specific basis if upstream fish passage facilities are being considered for a small scale hydroelectric project (defined as an existing dam that can be retrofitted to generate 25 MW or less). Information on general life history and geog… more
Date: August 1, 1980
Creator: Hildebrand, S.G. (ed.)
Partner: UNT Libraries Government Documents Department
open access

Generating technology assessment. Phase I work plan, Task 1 report

Description: A plan of work outlining information to assess electric generating technologies is presented. Projections are made of realistic and understandable engineering and cost assessments of nonnuclear electrical generating technologies. A computer-based method of producing such engineering and cost estimates for use by EIA's Coal and Electric Power Analysis Division is to be developed and implemented. Technologies and processes to be assessed are: all nonnuclear conventional and nonconventional (coal … more
Date: October 15, 1979
Partner: UNT Libraries Government Documents Department
open access

Shawmut hydroelectric redevelopment project. Final technical and construction cost report

Description: This report describes the major steps undertaken by the Central Maine Power Company to redevelop an old existing lowhead (19 to 23 ft) hydroelectric station and, at the same time, demonstrate the commercial viability of such a venture. The report addresses the process of site selection, preliminary conceptual design for determining economic viability, licensing and the regulatory process, final design, and project construction with the objective of presenting to the reader a technical and econo… more
Date: August 1, 1982
Partner: UNT Libraries Government Documents Department
open access

Preliminary analysis of legal obstacles and incentives to the development of low-head hydroelectric power in the northeastern United States

Description: A preliminary analysis of the legal obstacles and incentives to the development of the low-head hydroelectric potential of the 19 northeastern US (Maine, New Hampshire, Vermont, Massachusetts, Rhode Island, Connecticut, New York, New Jersey, Pennsylvania, Ohio, Indiana, Michigan, Illinois, Wisconsin, Kentucky, Maryland, Delaware, Virginia, and West Virginia) is presented. The statutes and case laws of the 19 states and the Federal government which affect developers of small dams are stressed. T… more
Date: May 1, 1980
Partner: UNT Libraries Government Documents Department
open access

Summary of the New England conference on legal and institutional incentives to small-scale hydroelectric development (Boston Massachusetts, January 30-31, 1979)

Description: The New England Conference on Legal and Institutional Incentives to Small Scale Hydroelectric Development examined the legal and institutional problems confronting small-scale hydroelectric potential of the northeast. Representatives from DOE, FERC, state legislatures, state public service commissions, private developers, and environmental groups attempted to evaluate the state of hydroelectric development in New England. The meeting began with an introductory panel followed by workshops addres… more
Date: May 1, 1980
Partner: UNT Libraries Government Documents Department
open access

Renewable Resources: a national catalog of model projects. Volume 3. Southern Solar Energy Center Region

Description: This compilation of diverse conservation and renewable energy projects across the United States was prepared through the enthusiastic participation of solar and alternate energy groups from every state and region. Compiled and edited by the Center for Renewable Resources, these projects reflect many levels of innovation and technical expertise. In many cases, a critique analysis is presented of how projects performed and of the institutional conditions associated with their success or failure. … more
Date: July 1, 1980
Partner: UNT Libraries Government Documents Department
open access

Hydroelectric feasibility study: Chubb River Sites, Village of Lake Placid, New York

Description: This study was performed to determine if the re-installation and re-activation of hydroelectric generating facilities at the Mill Pond and Power Pond dams in the Village of Lake Placid, N.Y. would be technically, environmentally, and economically feasible. The study includes a description and evaluation of the conditions of the existing facilities, an estimate of the potential generation at the two sites, a review of regulatory requirements, an economic analysis, and an implementation schedule … more
Date: January 1, 1979
Partner: UNT Libraries Government Documents Department
open access

User's guide to SERICPAC: A computer program for calculating electric-utility avoided costs rates

Description: SERICPAC is a computer program developed to calculate average avoided cost rates for decentralized power producers and cogenerators that sell electricity to electric utilities. SERICPAC works in tandem with SERICOST, a program to calculate avoided costs, and determines the appropriate rates for buying and selling of electricity from electric utilities to qualifying facilities (QF) as stipulated under Section 210 of PURA. SERICPAC contains simulation models for eight technologies including wind,… more
Date: May 1, 1982
Creator: Wirtshafter, R.; Abrash, M.; Koved, M. & Feldman, S.
Partner: UNT Libraries Government Documents Department
open access

Study of capital requirements for solar energy. Final report, Volume 1. Analysis of the macroeconomic effects of increased solar energy market penetration

Description: This report defines the analytical framework for, and presents the results of, a study to determine the macroeconomic effects of increased market penetration of solar energy technologies over the 1977-2000 time period. For the purposes of this document, solar technologies are defined as wind, photovoltaics, ocean thermal electric (OTEC), small-scale (non-utility) hydroelectric and all solar active and passive thermal technologies. This research has been undertaken in support of the National Pla… more
Date: July 19, 1979
Creator: Pleatsikas, C.J.; Hudson, E.A.; O'Connor, D.C. & Funkhouser, D.H.
Partner: UNT Libraries Government Documents Department
open access

Tuttle Creek Hydroelectric Project feasibility assessment report

Description: The results are presented of a feasibility assessment study to determine if hydroelectric generation could be developed economically at the Corps of Engineers' Tuttle Creek Dam, an existing flood control structure on the Big Blue River near Manhattan, Kansas. The studies and investigations included site reconnaissance, system load characteristics, site hydrology, conceptual project arrangements and layouts, power studies, estimates of construction costs, development of capital costs, econo… more
Date: March 1, 1979
Partner: UNT Libraries Government Documents Department
open access

Joint irrigation districts hydropower assessment study. Final feasibility assessment report. Volume I

Description: In August 1978, the United States Department of Energy and the Turlock Irrigation District entered into a cooperative agreement for a Joint District's Low-Head Hydropower Assessment Study. The purpose of the agreement was to carry out a study of the hydropower potential at sites within the borders of the Turlock, Merced, South San Joaquin, and Oakdale Irrigation Districts in California. The required data were gathered and analyzed. The results of this study indicate the total potential sma… more
Date: February 1, 1979
Partner: UNT Libraries Government Documents Department
open access

City of Redding: Lake Redding Power Project, feasibility assessment report

Description: The feasibility of constructing a low-head hydroelectric power generating facility on the Sacramento River in California was investigated considering technical, economic, legal, and environmental factors. It was concluded that the proposed plant is feasible and, with 5 generating units operating on a gross head of 14 ft, 79 GWh could be generated annually. The cost of the project with a 1984 completion date is estimated at $44.3 million. (LCL)
Date: March 1, 1979
Partner: UNT Libraries Government Documents Department
open access

Feasibility determination of low-head hydroelectric power development at existing sites. Final report

Description: This report contains the feasibility study, economic analysis, and information relevant to reactivation of the dam in Bethelehem, NH. It outlines a plan of development which calls for sale of the power to a local utility for the first few years of the project and then predominately on-site use of the power in an innovative plan for controlled-environment agriculture. The economic analyses indicate that reactivation of the dam would be a successful venture based on the present market value of 4.… more
Date: January 1, 1979
Creator: Polonsky, R.
Partner: UNT Libraries Government Documents Department
open access

Normanskill Hydroelectric Facility Feasibility Assessment

Description: A study was conducted to determine the feasibility of installing a hydroelectric generating facility at an existing dam of the Normanskill Reservoir in NY. Evaluation of the hydrologic, technical, economic, legal, instrumental and environmental factors led to the conclusion that the project is feasible and advantageous. The proposed project has a present worth net cost of $3,099,800. The benefit cost ratio is 2.36. It is estimated that the proposed hydroelectric generating facility at the Frenc… more
Date: January 1, 1979
Creator: Besha, J.A.
Partner: UNT Libraries Government Documents Department
open access

Vermont Marble Company, Proctor, Vermont: Otter Creek hydroelectric feasibility report

Description: Vermont Marble Company (VMCO) owns and operates four hydroelectric projects in a 50-mile reach of Otter Creek in west central Vermont. This study concerns three of the installations - Center Rutland, Beldens, and Huntington Falls. The fourth site is known as Proctor and will be studied separately. All four plants operate as run-of-river stations, and the limited reservoir storage capacity places severe limitations on any other type of operation. The plants are presently operating at much lower … more
Date: February 1, 1979
Partner: UNT Libraries Government Documents Department
open access

Cataract hydroelectric development expansion study

Description: The Cataract hydroelectric power plant and dam was constructed in 1937-1938 and has been operated continually since that date. This unit is a vertical shaft Kaplan type machine with a rated output of 6650 kW at a design head of 44 ft. Maximum output is 8000 kW. The feasibility of expanding this existing plant was studied. The results indicate the following: the available head and unused flow at the Cataract Project will support an additional 6250 kW of generating capacity; the estimated gross p… more
Date: January 1, 1979
Partner: UNT Libraries Government Documents Department
open access

Potential hydroelectric power. Vertical turbine: spillway combine Broadwater Dam. Final report

Description: A feasibility study was made of the hydroelectric power potential at Broadwater Dam in western Montana. Two alternative configurations for the potential project were evaluated and the economics of four possible sources of project funding were assessed. The configurations analyzed were an apron-mounted configuration, in which the turbine-generator units are located on the downstream apron of the existing dam, and a conventional configuration, in which the units are located in a new powerhouse ad… more
Date: April 23, 1979
Creator: Willer, D. C.
Partner: UNT Libraries Government Documents Department
open access

Feasibility study for a low-head hydroelectric installation at Archusa Creek Dam. Final report to the Pat Harrison Waterway District

Description: The rising cost, uncertain future supply, and environmental problems associated with energy sources have resulted in serious investigation of energy sources that have not previously been considered economically and technically feasible. One such source involves low-head hydroelectric generation. The Department of Energy has funded several feasibility studies for the installation of hydroelectric generators at existing low-head dams. Such a feasibility study for the Archusa Creek Dam near Quitma… more
Date: February 26, 1979
Creator: Carlson, K. W. & Herring, J. W. Jr.
Partner: UNT Libraries Government Documents Department
open access

Maxwell Hydroelectric Project Feasibility Assessment Report

Description: The results of a feasibility assessment study to determine if it is economical to develop hydroelectric generation at the existing Maxwell Locks and Dam in Pennsylvania on the Monongahela River are summarized. The investigations included site reconnaissance, system loads, growth rate, site hydrology, conceptual project arrangements and layouts, power output, estimates of construction costs and annual costs, economic analyses, development of a design and construction schedule, and a preliminary … more
Date: March 1, 1979
Partner: UNT Libraries Government Documents Department
Back to Top of Screen