1,757 Matching Results

Search Results

Advanced search parameters have been applied.

A method of calibrating airspeed installations on airplanes at transonic and supersonic speeds by the use of accelerometer and attitude-angle measurements

Description: A method is described for calibrating airspeed installation on airplanes at transonic and supersonic speeds in vertical-plane maneuvers in which use is made of measurements of normal and longitudinal accelerations and attitude angle. In this method all the required instrumentation is carried within the airplane. An analytical study of the effects of various sources of error on the accuracy of an airspeed calibration by the accelerometer method indicated that the required measurements can be made accurately enough to insure a satisfactory calibration.
Date: December 5, 1952
Creator: Zalovick, John A.; Lina, Lindsay J. & Trant, James P., Jr.
Partner: UNT Libraries Government Documents Department

Monte Carlo Simulation Tool Installation and Operation Guide

Description: This document provides information on software and procedures for Monte Carlo simulations based on the Geant4 toolkit, the ROOT data analysis software and the CRY cosmic ray library. These tools have been chosen for its application to shield design and activation studies as part of the simulation task for the Majorana Collaboration. This document includes instructions for installation, operation and modification of the simulation code in a high cyber-security computing environment, such as the Pacific Northwest National Laboratory network. It is intended as a living document, and will be periodically updated. It is a starting point for information collection by an experimenter, and is not the definitive source. Users should consult with one of the authors for guidance on how to find the most current information for their needs.
Date: September 2, 2013
Creator: Aguayo Navarrete, Estanislao; Ankney, Austin S.; Berguson, Timothy J.; Kouzes, Richard T.; Orrell, John L.; Troy, Meredith D. et al.
Partner: UNT Libraries Government Documents Department

Installation and Manufacturing of Photovoltaics: an Assessment Using California and New York

Description: Renewable energy studies are becoming increasingly important as world energy demand rises and current energy sources are increasingly questioned. Solar photovoltaics (PV) are the focus of this study as a renewable industry still in its infancy. This research examines the geography of solar panel installation and manufacturing from 2007 to 2010 in California and New York. California is the larger of the two markets and has implemented more policy support; programs that appear to have increased the pace of installations, reduce the size of the subsidy, and help lower total costs. Similar trends are observable in New York. US based companies are still making solar panels, but foreign competitors, most notably from China and Mexico, are capturing an increasing share of the market.
Date: August 2012
Creator: Dohanich, Elizabeth
Partner: UNT Libraries

Synopsis of Cathode #4 Activation

Description: The purpose of this report is to describe the activation of the fourth cathode installed in the DARHT-II Injector. Appendices have been used so that an extensive amount of data could be included without danger of obscuring important information contained in the body of the report. The cathode was a 612 M type cathode purchased from Spectra-Mat. Section II describes the handling and installation of the cathode. Section III is a narrative of the activation based on information located in the Control Room Log Book supplemented with time plots of pertinent operating parameters. Activation of the cathode was performed in accordance with the procedure listed in Appendix A. The following sections provide more details on the total pressure and constituent partial pressures in the vacuum vessel, cathode heater power/filament current, and cathode temperature.
Date: May 26, 2006
Creator: Kwan, Joe; Ekdahl, C.; Harrison, J.; Kwan, J.; Leitner, M.; McCruistian, T. et al.
Partner: UNT Libraries Government Documents Department

AVERT Main Module Quick Start Guide

Description: This document is the installation steps for installing the Environmental Protection Agency's AVoided Emissions and geneRation Tool (AVERT) software.
Date: unknown
Creator: United States. Environmental Protection Agency.
Partner: UNT Libraries Government Documents Department

The New 1999 National Electrical Code Coupled with New Standards Clarify Requirements for Installations of Photovoltaic Systems in the U.S.

Description: The National Electrical Code@ (NEC@) focuses primarily on electrical system installation requirements in the U.S. The NEC addresses both fire and personnel safety. This paper will describe recent efforts of the PV industry in the U.S. and the resulting requirements in the 1999 National Electrical Code-- Article 690 --Solar Photovoltaic Systems. The Article 690 requirements spell out the PV-unique requirements for safe installations of PV systems in the U.S.A. This paper provides an overview of the most significant changes that appear in Article 690 of the 1999 edition of the NEC. The related and coordinated efforts of the other standards- making groups will also be briefly reviewed.
Date: January 8, 1999
Creator: Bower, W.
Partner: UNT Libraries Government Documents Department

Fiscal Year 1998 Well Installation, Plugging and Abandonment, and Redevelopment summary report Y-12 Plant, Oak Ridge, Tennessee

Description: This report summarizes the well installation, plugging and abandonment, and redevelopment activities conducted during the federal fiscal year (FY) 1998 at the Y-12 Plant, Oak Ridge, Tennessee. Five new groundwater monitoring wells were installed at the Y-12 Plant under the FY 1998 drilling program. Two of the wells are located in west Bear Creek Valley, one is in the eastern Y-12 Plant area near Lake Reality, and two are located near the Oil Landfarm Waste Management Area, which were installed by Bechtel Jacobs Company LLC (Bechtel Jacobs) as part of a site characterization activity for the Oak Ridge Reservation (ORR) Disposal Cell. Also, two existing wells were upgraded and nine temporary piezometers were installed to characterize hydrogeologic conditions at the Disposal Cell site. In addition, 40 temporary piezometers were installed in the Boneyard/Bumyard area of Bear Creek Valley by Bechtel Jacobs as part of the accelerated remedial actions conducted by the Environmental Restoration Program. Ten monitoring wells at the Y-12 Plant were decommissioned in FY 1998. Two existing monitoring wells were redeveloped during FY 1998 (of these, GW-732 was redeveloped tsvice). All well installation and development (including redevelopment) was conducted following industry-standard methods and approved procedures from the Environmental Surveillance Procedures Quality Control Program (Energy Systems 1988); the Resource Conservation and Recovery Act (RCRA) Groundwater Monitoring Technical Enforcement Guidance Document (EPA 1992); and the Monitoring Well Installation Plan for the Department of Energy Y-12 Plant, Oak Ridge, Tennessee (Energy Systems 1997a). Well installation and development of the non-Y-12 Plant GWPP oversight installation projects were conducted using procedures/guidance defined in the following documents: Work Plan for Support to Upper East Fork Poplar Creek East End Volatile Organic Compound Plumes Well Installation Project, Oak Ridge Y-12 Plant, Oak Ridge, Tennessee (SAIC 1998a); Sampling and Analysis Plan for the Oil Landfarm Soils Containment ...
Date: December 1, 1998
Partner: UNT Libraries Government Documents Department

Strain gauge installation tool

Description: A tool and a method for attaching a strain gauge to a test specimen by maintaining alignment of, and applying pressure to, the strain gauge during the bonding of the gauge to the specimen. The tool comprises rigid and compliant pads attached to a spring-loaded clamp. The pads are shaped to conform to the specimen surface to which the gauge is to be bonded. The shape of the pads permits the tool to align itself to the specimen and to maintain alignment of the gauge to the specimen during the bond curing process. A simplified method of attaching a strain gauge is provided by use of the tool.
Date: December 1, 1997
Creator: Conard, Lisa Marie
Partner: UNT Libraries Government Documents Department

PVUSA construction and safety: Experience, lessons learned and costs

Description: This report is the first of a series of PVUSA reports on PVUSA experiences and lessons learned at the demonstration sites in Davis and Kerman, California. During the course of approximately 6 years (1988--1993), nine PV systems have been installed ranging from 20 kW to 500 kW. Five 20-kW emerging module technology arrays were installed on universal project-provided structures, and four utility-scale systems (200 to 500 kW) were installed as turnkey (vendor designed and integrated) systems. The report emphasizes PVUSA construction and safety experience from the installation of these systems and is intended for use by utility personnel engaged in the construction of a photovoltaic (PV) power plant (e.g., engineers, construction supervisors, etc.).
Date: September 1, 1994
Creator: Shipman, D.
Partner: UNT Libraries Government Documents Department