11 Matching Results

Search Results

Advanced search parameters have been applied.

PHYSICAL, CHEMICAL AND STRUCTURAL EVOLUTIION OF ZEOLITE-CONTAINING WASTE FORMS PRODUCED FROM METAKAOLINITE AND CALCINED SODUIM BEARING WASTE (HLW AND/OR LLW)

Description: Zeolites can adsorb liquids and gases, take part in catalytic reactions and serve as cation exchange media. They are commercially available as finely divided powders. Using zeolites to manage radioactive waste is not new, but a process by which zeolites can be made to act both as a host phase and a cementing agent is. It is notable that zeolites occur in nature as well consolidated/cemented deposits. The Romans used blocks of Neapolitan zeolitized tuff as a building material and some of these buildings are still standing. Zeolites are easy to synthesize from a wide range of both natural and man-made precursor materials. The method of making a ''hydroceramic'' is derived from a process in which metakaolinite (thermally dehydroxylated kaolinite) is slurried with a dilute sodium hydroxide (NaOH) solution and then reacted for hours to days at mildly elevated temperatures (60-200 C). The zeolites that form in solution are finely divided powders containing micrometer sized crystals. However, if the process is changed and only enough concentrated sodium hydroxide solution (e.g. 12 M) is added to the metakaolinite to give the mixture a putty-like consistency and the mixture is then cured under similar conditions, the mixture becomes a very hard ceramic-like material containing distinct tectosilicate crystallites (zeolites and feldspathoids) imbedded in an X-ray amorphous sodium aluminosilicate hydrate matrix. Due to the material's vitreous character, the composite has been called a hydroceramic. Similar to zeolite/feldspathoid powders, a hydroceramic is able to sequester cations and a wide range of salt molecules (e.g., nitrate, nitrite and sulfate) in lattice positions and within structural channels and voids thus rendering them ''insoluble'' and making them an ideal contingency waste form for solidifying radioactive waste. The obvious similarities between a hydroceramic waste form and a waste form based on solidified Portland-cement grout are superficial because their chemistries ...
Date: June 15, 2003
Creator: Grutzeck, Michael W.
Partner: UNT Libraries Government Documents Department

Grout Placement and Property Evaluation for Closing Hanford High-Level Waste Tanks - Scale-Up Testing

Description: Hanford has 149 single-shell high level waste (HLW) tanks that were constructed between 1943 and 1964. Many of these tanks have leaked or are suspected of leaking HLW into the soil above the ground water. Consequently, a major effort is ongoing to transfer the liquid portion of the waste to the 28 newer, double-shell tanks. Savannah River National Laboratory (SRNL) was tasked to develop grout formulations for the three-layer closure concept selected by CH2M HILL for closing Tank C-106. These grout formulations were also evaluated for use as fill materials in the next six tanks scheduled to be closed. The overall scope consisted of both bench-scale testing to confirm mix designs and scale-up testing to confirm placement properties. This report provides results of the scale-up testing for the three-phase tank closure strategy. It also contains information on grouts for equipment and riser filling. The three-phase fill strategy is summarized as follows: Phase I fill encapsulates and minimizes dispersion of the residual waste in the tank. This fill is referred to as the Stabilization Layer and consists of the Stabilization Grout. The Phase II fill provides structural stability to the tank system and prevents subsidence. It is referred to as the Structural Layer and consists of the Structural Grout. A final Phase III fill consists of a grout designed to provide protection against intrusion and is referred to as the Capping Layer or Capping Grout.
Date: December 15, 2003
Creator: LANGTON, CHRISTINE
Partner: UNT Libraries Government Documents Department

Hanford tank initiative cone penetrometer stand alone grouting module

Description: The HTI subsurface characterization task will use the Hanford Cone Penetrometer platform (CPP) to deploy contaminant sensor and soil sampling probes into the vadose zone surrounding SST 241-AX-104. Closure of the resulting penetration holes may be stipulated by WAC requirements. A stand alone grouting capability deployable by the CPP has been developed. This qualification test plan defines testing of this capability to be performed at the Immobilized Low Activity Waste Disposal Complex.
Date: October 15, 1998
Creator: CALLAWAY, W.S.
Partner: UNT Libraries Government Documents Department

CEMENTITIOUS BARRIERS PARTNERSHIP ACCOMPLISHMENTS AND RELEVANCE TO THE DOE COMPLEX

Description: The Cementitious Barriers Partnership (CBP) was initiated to reduce risk and uncertainties in the performance assessments that directly impact U.S. Department of Energy (DOE) environmental cleanup and closure programs. The CBP is supported by the DOE Office of Environmental Management (DOE-EM) and has been specifically addressing the following critical EM program needs: (i) the long-term performance of cementitious barriers and materials in nuclear waste disposal facilities and (ii) increased understanding of contaminant transport behavior within cementitious barrier systems to support the development and deployment of adequate closure technologies. To accomplish this, the CBP has two initiatives: (1) an experimental initiative to increase understanding of changes in cementitious materials over long times (> 1000 years) over changing conditions and (2) a modeling initiative to enhance and integrate a set of computational tools validated by laboratory and field experimental data to improve understanding and prediction of the long-term performance of cementitious barriers and waste forms used in nuclear applications. In FY10, the CBP developed the initial phase of an integrated modeling tool that would serve as a screening tool which could help in making decisions concerning disposal and tank closure. The CBP experimental programs are underway to validate this tool and provide increased understanding of how CM changes over time and under changing conditions. These initial CBP products that will eventually be enhanced are anticipated to reduce the uncertainties of current methodologies for assessing cementitious barrier performance and increase the consistency and transparency of the DOE assessment process. These tools have application to low activity waste forms, high level waste tank closure, D&D and entombment of major nuclear facilities, landfill waste acceptance criteria, and in-situ grouting and immobilization of vadose zone contamination. This paper summarizes the recent work provided by the CBP to support DOE operations and regulatory compliance and the accomplishments ...
Date: November 15, 2010
Creator: Burns, H.; Langton, C.; Flach, G. & Kosson, D.
Partner: UNT Libraries Government Documents Department

HIGH LEVEL WASTE MECHANCIAL SLUDGE REMOVAL AT THE SAVANNAH RIVER SITE F TANK FARM CLOSURE PROJECT

Description: The Savannah River Site F-Tank Farm Closure project has successfully performed Mechanical Sludge Removal (MSR) using the Waste on Wheels (WOW) system for the first time within one of its storage tanks. The WOW system is designed to be relatively mobile with the ability for many components to be redeployed to multiple waste tanks. It is primarily comprised of Submersible Mixer Pumps (SMPs), Submersible Transfer Pumps (STPs), and a mobile control room with a control panel and variable speed drives. In addition, the project is currently preparing another waste tank for MSR utilizing lessons learned from this previous operational activity. These tanks, designated as Tank 6 and Tank 5 respectively, are Type I waste tanks located in F-Tank Farm (FTF) with a capacity of 2,840 cubic meters (750,000 gallons) each. The construction of these tanks was completed in 1953, and they were placed into waste storage service in 1959. The tank's primary shell is 23 meters (75 feet) in diameter, and 7.5 meters (24.5 feet) in height. Type I tanks have 34 vertically oriented cooling coils and two horizontal cooling coil circuits along the tank floor. Both Tank 5 and Tank 6 received and stored F-PUREX waste during their operating service time before sludge removal was performed. DOE intends to remove from service and operationally close (fill with grout) Tank 5 and Tank 6 and other HLW tanks that do not meet current containment standards. Mechanical Sludge Removal, the first step in the tank closure process, will be followed by chemical cleaning. After obtaining regulatory approval, the tanks will be isolated and filled with grout for long-term stabilization. Mechanical Sludge Removal operations within Tank 6 removed approximately 75% of the original 95,000 liters (25,000 gallons). This sludge material was transferred in batches to an interim storage tank to prepare for ...
Date: January 15, 2008
Creator: Jolly, R & Bruce Martin, B
Partner: UNT Libraries Government Documents Department

Diffusion of Iodine and Rhenium in Category 3 Waste Encasement Concrete and Soil Fill Material

Description: Assessing long-term performance of Category 3 waste cement grouts for radionuclide encasement requires knowledge of the radionuclide-cement interactions and mechanisms of retention (i.e. sorption or precipitation). This understanding will enable accurate prediction of radionuclide fate when the waste forms come in contact with groundwater. A set of diffusion experiments using carbonated and non-carbonated concrete-soil half cells was conducted under unsaturated conditions (4% and 7% by wt moisture content). Spiked concrete half-cell specimens were prepared with and without colloidal metallic iron addition and were carbonated using supercritical carbon dioxide. Spikes of I and Re were added to achieve measurable diffusion profile in the soil part of the half-cell. In addition, properties of concrete materials likely to influence radionuclide migration such as carbonation were evaluated in an effort to correlate these properties with the release of iodine and rhenium.
Date: December 15, 2006
Creator: Wellman, Dawn M.; Mattigod, Shas V.; Whyatt, Greg A.; Powers, Laura; Parker, Kent E. & Wood, Marcus I.
Partner: UNT Libraries Government Documents Department

TANKS 18 AND 19-F EQUIPMENT GROUT FILL MATERIAL EVALUATION AND RECOMMENDATIONS

Description: The United States Department of Energy (US DOE) intends to remove Tanks 18-F and 19-F at the Savannah River Site (SRS) from service. The high-level waste (HLW) tanks have been isolated from the F-area Tank Farm (FTF) facilities and will be filled with cementitious grout for the purpose of: (1) physically stabilizing the empty volumes in the tanks, (2) limiting/eliminating vertical pathways from the surface to residual waste on the bottom of the tanks, (3) providing an intruder barrier, and (4) providing an alkaline, chemical reducing environment within the closure boundary to limit solubility of residual radionuclides. Bulk waste and heel waste removal equipment will remain in Tanks 18-F and 19-F when the tanks are closed. This equipment includes: mixer pumps, transfer pumps, transfer jets, equipment support masts, sampling masts and dip tube assemblies. The current Tank 18-F and 19-F closure strategy is to grout the internal void spaces in this equipment to eliminate fast vertical pathways and slow water infiltration to the residual material on the tank floor. This report documents the results of laboratory testing performed to identify a grout formulation for filling the abandoned equipment in Tanks 18-F and 19-F. The objective of this work was to formulate a flowable grout for filling internal voids of equipment that will remain in Tanks 18-F and 19-F during the final closures. This work was requested by V. A. Chander, Tank Farm Closure Engineering, in HLW-TTR-2011-008. The scope for this task is provided in the Task Technical and Quality Assurance Plan (TTQAP), SRNL-RP-2011-00587. The specific objectives of this task were to: (1) Prepare and evaluate the SRR cooling coil grout identified in WSRC-STI-2008-00298 per the TTR for this work. The cooling coil grout is a mixture of BASF MasterFlow{reg_sign} 816 cable grout (67.67 wt. %), Grade 100 ground granulated blast ...
Date: December 15, 2011
Creator: Stefanko, D. & Langton, C.
Partner: UNT Libraries Government Documents Department

OPERATIONAL AND COMPOSITIONAL FACTORS THAT AFFECT THE PERFORMANCE PROPERTIES OF ARP/MCU SALTSTONE GROUT

Description: The Saltstone Production Facility (SPF) receives low level waste (LLW) salt solution from Tank 50H for treatment and disposal. Tank 50H receives transfers from the Effluent Treatment Project (ETP), the H-Canyon General Purpose Evaporator, and the Actinide Removal Process/Modular Caustic Side Solvent Extraction Unit (ARP/MCU) Decontaminated Salt Solution Hold Tank (DSS-HT). At the SPF, the LLW is mixed with premix (a cementitious mixture of portland cement (PC), blast furnace slag (BFS) and Class F fly ash (FA)) in a Readco mixer to produce fresh (uncured) saltstone that is transferred to the Saltstone Disposal Facility (SDF) vaults. The saltstone formulation (mix design) must produce a grout waste form that meets both placement and performance properties. In previous simulated saltstone studies, multiple compositional factors were identified that drive the performance properties of saltstone made from the projected ARP/MCU salt solution. This composition was selected as salt solution simulant since ARP/MCU is the primary influent into Tank 50H. The primary performance property investigated was hydraulic conductivity since it is a variable input property to the saltstone Performance Assessment (PA) transport model. In addition, the porosity, also referred to as void structure, is another variable that impacts the PA response. In addition, Young's modulus and cured density are other performance properties analyzed in this report; however they are indicators of the performance of saltstone and not direct inputs into the PA. The data from previous studies showed that the largest impact on the performance properties of saltstone was due to curing temperature, followed by aluminate concentration in the salt solution, water to premix ratio and premix composition. However, due to the scope of the previous studies, only a few mixes were cured and analyzed at higher temperatures. The samples cured at 60 C had an increased hydraulic conductivity of approximately 600 times that of ...
Date: February 15, 2012
Creator: Reigel, M.; Edwards, T. & Pickenheim, B.
Partner: UNT Libraries Government Documents Department

Task technical and QA plan: Thermal effects study: To evaluate saltstone properties associated with performance criteria as a function of extended exposure to temperatures typical of adiabatic curing

Description: The task to evaluate saltstone properties associated with performance criteria as a function of extended exposure to temperatures typical of adiabatic curing is described in this document and involves extension of previous qualification studies for DWPF Saltstone formulations.
Date: June 15, 1990
Creator: Orebaugh, E. G.
Partner: UNT Libraries Government Documents Department

Leak repair of the 107-D effluent retention basin

Description: This document discusses the leak repair of the 107-D retention basin. Leakage of effluent water from the 107-D Basin had increased from 6000 gallons per minute in November of 1959 to the peak of 8000 gallons per minute in April of 1963. Washout of fines had apparently created large voids beneath the north and west walls and endangered the integrity of the structure by settling the wall 2 in. at one place. The leakage was arrested in March of 1963 by filling the voids with concrete and grout and sealing the repairs with a newly developed sealant. Present total leakage is 3750 gallons per minute.
Date: May 15, 1963
Creator: Ryan, J.D.
Partner: UNT Libraries Government Documents Department

Task technical and QA plan: Thermal effects study: To evaluate saltstone properties associated with performance criteria as a function of extended exposure to temperatures typical of adiabatic curing

Description: The task to evaluate saltstone properties associated with performance criteria as a function of extended exposure to temperatures typical of adiabatic curing is described in this document and involves extension of previous qualification studies for DWPF Saltstone formulations.
Date: June 15, 1990
Creator: Orebaugh, E.G.