Injection of FGD Grout to Abate Acid Mine Drainage in Underground Coal Mines

Description: Acid Mine Drainage (AMD) from abandoned underground coal mines in Ohio is a concern for both residents and regulatory agencies. Effluent from these mines is typically characterized by low pH and high iron and sulfate concentrations and may contaminate local drinking-water supplies and streams. The objective of this project is to demonstrate the technical feasibility of injecting cementitious alkaline materials, such as Flue Gas Desulfurization (FGD) material to mitigate current adverse environmental impacts associated with AMD in a small, abandoned deep mine in Coshocton County Ohio. The Flue Gas Desulfurization material will be provided from American Electric Power`s (AEP) Conesville Plant. It will be injected as a grout mix that will use Fixated Flue Gas Desulfurization material and water. The subject site for this study is located on the border of Coshocton and Muskingum Counties, Ohio, approximately 1.5 miles south-southwest of the town of Wills Creek. The study will be performed at an underground mine designated as Mm-127 in the Ohio Department of Natural Resources register, also known as the Roberts-Dawson Mine. The mine operated in the mid-1950s, during which approximately 2 million cubic feet of coal was removed. Effluent discharging from the abandoned mine entrances has low pH in the range of 2.8-3.0 that drains directly into Wills Creek Lake. The mine covers approximately 14.6 acres. It is estimated that 26,000 tons of FGD material will be provided from AEP`s Conesville Power Plant located approximately 3 miles northwest of the subject site.
Date: July 1, 1997
Creator: Mafi, S.; Damian, M.T.; Senita, R.E.; Jewitt, W.C.; Bair, S.; Chin, Y.C. et al.
Partner: UNT Libraries Government Documents Department

In situ changes in the moisture content of heated, welded tuff based on thermal neutron measurements

Description: Thermal neutron logs were collected to monitor changes in moisture content within a welded tuff rock mass heated from a borehole containing an electrical heater which remained energized for 195 days. Thermal neutron measurements were made in sampling boreholes before, during and after heating. The results generally corroborated our conceptual understanding of hydrothermal flow as well as most of the numerical modeling conducting for this study. Conceptual models have been developed in conjunction with the numerical model calculations to explain differences in the drying and re-wetting behavior above and below the heater. Numerical modeling indicated that the re-wetting of the dried-out zone was dominated by the binary diffusion of water vapor through fractures. Saturation gradients in the rock matrix resulted in relative humidity gradients which drove water vapor (primarily along fractures) back to the dried-out zone where it condensed along the fracture walls and was imbibed by the matrix. 4 refs., 28 figs.
Date: July 1, 1991
Creator: Ramirez, A.L.; Carlson, R.C. & Buscheck, T.A.
Partner: UNT Libraries Government Documents Department

International technology catalogue: Foreign technologies to support the environmental restoration and waste management needs of the DOE complex

Description: This document represents a summary of 27 foreign-based environmental restoration and waste management technologies that have been screened and technically evaluated for application to the cleanup problems of the Department of Energy (DOE) nuclear weapons complex. The evaluation of these technologies was initiated in 1992 and completed in 1995 under the DOE`s International Technology Coordination Program of the Office of Technology Development. A methodology was developed for conducting a country-by-country survey of several regions of the world where specific environmental technology capabilities and market potential were investigated. The countries that were selected from a rank-ordering process for the survey included: then West Germany, the Netherlands, France, Japan, Taiwan, the Czech and Slovak Republics, and the Former Soviet Union. The notably innovative foreign technologies included in this document were screened initially from a list of several hundred, and then evaluated based on criteria that examined for level of maturity, suitability to the DOE needs, and for potential cost effective application at a DOE site. Each of the selected foreign technologies that were evaluated in this effort for DOE application were subsequently matched with site-specific environmental problem units across the DOE complex using the Technology Needs Assessment CROSSWALK Report. For ease of tracking these technologies to site problem units, and to facilitate their input into the DOE EnviroTRADE Information System, they were categorized into the following three areas: (1) characterization, monitoring and sensors, (2) waste treatment and separations, and (3) waste containment. Technical data profiles regarding these technologies include title and description, performance information, development status, key regulatory considerations, intellectual property rights, institute and contact personnel, and references.
Date: July 1, 1995
Creator: Matalucci, R.V.; Jimenez, R.D. & Esparza-Baca, C.
Partner: UNT Libraries Government Documents Department

Extrapolation of creep behavior of high-density polyethylene liner in the Catch Basin of grout vaults

Description: Testing was performed to determine if gravel particles will creep into and puncture the high-density polyethylene (HDPE) liner in the catch basin of a grout vault over a nominal 30-year period. Testing was performed to support a design without a protective geotextile cover after the geotextile was removed from the design. Recently, a protective geotextile cover over the liner was put back into the design. The data indicate that the geotextile has an insignificant effect on the creep of gravel into the liner. However, the geotextile may help to protect the liner during construction. Two types of tests were performed to evaluate the potential for creep-related puncture. In the first type of test, a very sensitive instrument measured the rate at which a probe crept into HDPE over a 20-minute period at temperatures of 176{degrees}F to 212{degrees}F (80{degrees}C to 100{degrees}C). The second type of test consisted of placing the liner between gravel and mortar at 194{degrees}F (90{degrees}C) and 45.1 psi overburden pressure for periods up to 1 year. By combining data from the two tests, the long-term behavior of the creep was extrapolated to 30 years of service. After 30 years of service, the liner will be in a nearly steady condition and further creep will be extremely small. The results indicate that the creep of gravel into the liner will not create a puncture during service at 194{degrees}F (90{degrees}C). The estimated creep over 30 years is expected to be less than 25 mils out of the total initial thickness of 60 mils. The test temperature of 194{degrees}F (90{degrees}C) corresponds to the design basis temperature of the vault. Lower temperatures are expected at the liner, which makes the test conservative. Only the potential for failure of the liner resulting from creep of gravel is addressed in this report.
Date: July 1, 1995
Creator: Whyatt, G.A.
Partner: UNT Libraries Government Documents Department

Chemical Grouting Lost-Circulation Zones with Polyurethane Foam

Description: Sandia National Laboratories is developing polyurethane foam as a chemical grout for lost circulation zones. In past work polyurethane foam was tried with limited success in laboratory tests and GDO sponsored field tests. Goals were that the foam expanded significantly and harden to a chillable firmness quickly. Since that earlier work there have been improvements in polyurethane chemistry and the causes of the failures of previous tests have been identified. Recent success in applying pure solution grouts (proper classification of polyurethane--Naudts) in boreholes encourages reevaluating its use to control lost circulation. These successes include conformance control in the oil patch (e.g. Ng) and darn remediation projects (Bruce et al.). In civil engineering, polyurethane is becoming the material of choice for sealing boreholes with large voids and high inflows, conditions associated with the worst lost circulation problems. Demonstration of a delivery mechanism is yet to be done in a geothermal borehole.
Date: July 12, 1999
Creator: Mansure, A.J. & Westmoreland, J.J.
Partner: UNT Libraries Government Documents Department

Description of the grout system dynamic simulation

Description: The grout system dynamic computer simulation was created to allow investigation of the ability of the grouting system to meet established milestones, for various assumed system configurations and parameters. The simulation simulates the movement of tank waste through the system versus time, from initial storage tanks, through feed tanks and the grout plant, then finally to a grout vault. The simulation properly accounts for the following (1) time required to perform various actions or processes, (2) delays involved in gaining regulatory approval, (3) random system component failures, (4) limitations on equipment capacities, (5) available parallel components, and (6) different possible strategies for vault filling. The user is allowed to set a variety of system parameters for each simulation run. Currently, the output of a run primarily consists of a plot of projected grouting campaigns completed versus time, for comparison with milestones. Other outputs involving any model component can also be quickly created or deleted as desired. In particular, sensitivity runs where the effect of varying a model parameter (flow rates, delay times, number of feed tanks available, etc.) on the ability of the system to meet milestones can be made easily. The grout system simulation was implemented using the ITHINK* simulation language for Macintosh** computers.
Date: July 1, 1993
Creator: Zimmerman, B. D.
Partner: UNT Libraries Government Documents Department

Concepts for operational period panel seal design at the Waste Isolation Pilot Plant

Description: Concepts for underground panel or drift seals at the Waste Isolation Pilot Plant are developed to satisfy sealing requirements of the operational period. The concepts are divided into two groups. In the ``NOW`` group, design concepts are considered in which a sleeve structure is installed in the panel access immediately after excavation and before waste is emplaced. In the ``LATER`` group, no special measures are taken during excavation or before waste emplacement; the seal is installed at a later date, perhaps up to 35 years after the drift is excavated. Three concepts are presented in both the NOW and LATER groups. A rigid sleeve, a yielding sleeve, and steel rings with inflatable tubes are proposed as NOW concepts. One steel ring concept and two concrete monoliths are proposed for seals emplaced in older drifts. Advantages and disadvantages are listed for each concept. Based on the available information, it appears most feasible to recommend a LATER concept using a concrete monolith as a preferred seal for the operational period. Each concept includes the potential of remedial grout and/or construction of a chamber that could be used for monitoring leakage from a closed panel during the operational period. Supporting in situ demonstrations of elements of the concepts are recommended.
Date: July 1, 1993
Creator: Hansen, F. D.; Lin, M. S. & Van Sambeek, L. L.
Partner: UNT Libraries Government Documents Department

In-situ grouting of the low-level radioactive waste disposal silos at ORNL`s Solid Waste Storage Area Six

Description: At Oak Ridge National Laboratory (ORNL), one method of solid low-level radioactive waste disposal has been disposed of in below-grade cylindrical concrete silos. Located in Solid Waste Storage Area 6 (SWSA 6), each silo measures 8 ft in diameter and 20 ft deep. Present day operations involve loading the silos with low-level radioactive waste and grouting the remaining void space with a particulate grout of low viscosity. Initial operations involving the disposal of wastes into the below-grade silos did not include the grouting process. Grouting was stated as a standard practice (in late 1988) after discovering that {approximately}75% of the silos accumulated water in the bottom of the silos in the {approximately}2 years after capping. Silo water (leachate) contained a wide range of types and concentrations of radionuclides. The migration of contaminated leachate out of the silo into adjoining soil and groundwater was considered to be a serious environmental concern. This report describes how a specially designed particulate-base grout was used to grout 54 silos previously filled with low-level radioactive waste. Grouting involved three steps: (1) silo preparation, (2) formulation and preparation of the grout mixture, and (3) injection of the grout into the silos. Thirty-five of the 54 silos grouted were equipped with a 3-in.-diam Polyvinyl Chloride (PVC) pipe used to monitor water levels in the silos. A method for rupturing the bottom section of these PVC wells was developed so that grout could be pumped to the bottom of those silos. Holes (2-in. diam) were drilled through the {approximately}18 in. thick concrete to fill the remaining 19 wells without the PVC monitoring wells. The formulation of grout injected into the silos was based on a Portland Type I cement, flyash, sand, and silica fume admixture. Compressive strength of grout delivered to SWSA6 during grouting operations averaged 1,808 lb/in{sup ...
Date: July 1, 1993
Creator: Francis, C. W.; Farmer, C. D. & Stansfield, R. G.
Partner: UNT Libraries Government Documents Department

Grout to meet physical and chemical requirements for closure at Hanford grout vaults. Final report

Description: The US Army Engineer Waterways Experiment Station (WES) developed a grout based on portland cement, Class F fly ash, and bentonite clay, for the Hanford Grout Vault Program. The purpose of this grout was to fill the void between a wasteform containing 106-AN waste and the vault cover blocks. Following a successful grout development program, heat output, volume change, and compressive strength were monitored with time in simulated repository conditions and in full-depth physical models. This research indicated that the cold-cap grout could achieve and maintain adequate volume stability and other required physical properties in the internal environment of a sealed vault. To determine if contact with 106-AN liquid waste would cause chemical deterioration of the cold-cap grout, cured specimens were immersed in simulated waste. Over a period of 21 days at 150 F, specimens increased in mass without significant changes in volume. X-ray diffraction of reacted specimens revealed crystallization of sodium aluminum silicate hydrate. Scanning electron microscopy used with X-ray fluorescence showed that clusters if this phase had formed in grout pores, increasing grout density and decreasing its effective porosity. Physical and chemical tests collectively indicate a sealing component. However, the Hanford Grout Vault Program was cancelled before completion of this research. This report summarizes close-out Waterways Experiment Station when the Program was cancelled.
Date: July 21, 1994
Partner: UNT Libraries Government Documents Department