This system will be undergoing maintenance April 18th between 9:00AM and 12:00PM CDT.

Search Results

Advanced search parameters have been applied.
open access

Billings Shipping Corporation: Freight Distribution Facility, Billings, Montana. Final technical report

Description: The office portion of the building is 4900 ft/sup 2/. The active hydronic space heating system uses 1890 ft/sup 2/ of flat plate air-to-water solar collectors and has 2500 gallons of storage capacity. Included here are the acceptance test plan, operation and maintenance, operating mode table, pictures, and system performance data. (MHR)
Date: December 22, 1978
Partner: UNT Libraries Government Documents Department
Back to Top of Screen