Advanced reactors transition FY 1997 multi-year work plan WBS 7.3

Description: This document describes in detail the work to be accomplised in FY 1997 and the out-years for the Advanced Reactors Transition (WBS 7.3) under the management of the Babcock & Wilcox Hanford Company. This document also includes specific milestones and funding profiles. Based upon the Fiscal Year 1997 Multi-Year Work Plan, the Department of Energy will provide authorization to perform the work described.
Date: September 27, 1996
Creator: Hulvey, R.K.
Partner: UNT Libraries Government Documents Department

Potential role of the Fast Flux Test Facility and the advanced test reactor in the U.S. tritium production system

Description: The Deparunent of Energy is currently engaged in a dual-track strategy to develop an accelerator and a conunercial light water reactor (CLWR) as potential sources of tritium supply. New analysis of the production capabilities of the Fast Flux Test Facility (FFTF) at the Hanford Site argues for considering its inclusion in the tritium supply,system. The use of the FFTF (alone or together with the Advanced Test Reactor [ATR] at the Idaho National Engineering Laboratory) as an integral part of,a tritium production system would help (1) ensure supply by 2005, (2) provide additional time to resolve institutional and technical issues associated with the- dual-track strategy, and (3) reduce discounted total life-cycle`costs and near-tenn annual expenditures for accelerator-based systems. The FFRF would also provide a way to get an early start.on dispositioning surplus weapons-usable plutonium as well as provide a source of medical isotopes. Challenges Associated With the Dual-Track Strategy The Departinent`s purchase of either a commercial reactor or reactor irradiation services faces challenging institutional issues associated with converting civilian reactors to defense uses. In addition, while the technical capabilities of the individual components of the accelerator have been proven, the entire system needs to be demonstrated and scaled upward to ensure that the components work toge ther 1548 as a complete production system. These challenges create uncertainty over the ability of the du2a-track strategy to provide an assured tritium supply source by 2005. Because the earliest the accelerator could come on line is 2007, it would have to operate at maximum capacity for the first few years to regenerate the reserves lost through radioactive decay aftei 2005.
Date: October 1, 1996
Creator: Dautel, W. A.
Partner: UNT Libraries Government Documents Department

FFTF Plant transition function analysis report

Description: The document contains the functions, function definitions, function interfaces, function interface definitions, Input Computer Automated Manufacturing Definition (IDEFO) diagrams, and function hierarchy charts that describe what needs to be performed to deactivate FFTF.
Date: September 1, 1995
Creator: Lund, D.P. & Group, FFTF Working
Partner: UNT Libraries Government Documents Department

Sodium-to-gas leak-detection testing for FFTF: Letter 7754921

Description: The current status of the program is as follows: Work is in progress on Evaluation of Sodium Aerosol Generation Versus Leak Rate. Testing on Demonstration of Contact Leak Detector Performance in FFTF Reactor Inlet Guard Pipe has been completed and the final report is in preparation. Testing of Sodium Ionization Detector Response to Extraneous Materials is delayed until a current design Sodium Ionization Detector is available.
Date: November 11, 1977
Partner: UNT Libraries Government Documents Department

Maintenance implementation plan for the Fast Flux Test Facility

Description: This plan implements the U.S. Department of Energy (DOE) 4330.4B, Maintenance Management Program (1994), at the Fast Flux Test Facility (FFTF). The FFTF is a research and test reactor located near Richland, Washington, and is operated under contract for the DOE by the B&W Hanford Company (BWHC). The intent of this Maintenance Implementation Plan (MIP) is to describe the manner in which the activities of the maintenance function are executed and controlled at the FFTF and how this compares to the requirements of DOE 4330.4B. The MIP ii a living document that is updated through a Facility Maintenance Self- Assessment Program. During the continuing self-assessment program, any discrepancies found are resolved to meet DOE 4330.4B requirements and existing practices. The philosophy of maintenance management at the FFTF is also describe within this MIP. This MIP has been developed based on information obtained from various sources including the following: * A continuing self-assessment against the requirements of the Conduct of Maintenance Order * In-depth reviews conducted by the members of the task team that assembled this MIP * Inputs from routine audits and appraisals conducted at the facility The information from these sources is used to identify those areas in which improvements could be made in the manner in which the facility conducts maintenance activities. The action items identified in Rev. 1 of the MIP have been completed. The MIP is arranged in six sections. Section I is this Executive Summary. Section 2 describes the facility and its 0683 history. Section 3 describes the philosophy of the graded approach and how it is applied at FFTF. Section 3 also discusses the strategy and the basis for the prioritizing resources. Section 4 contains the detailed discussion of `the elements of DOE 4330.4B and their state of implementation. Section 5 is for waivers ...
Date: January 30, 1997
Creator: Boyd, J.A.
Partner: UNT Libraries Government Documents Department

FFTF Plant transition mission analysis report

Description: FFTF (Fast Flux Test Facility) is a 400-MW(t) sodium-cooled, fast flux test reactor at Hanford, designed to test fuels and materials for advanced nuclear power plants; it has no capability for generating electric power. Since a long-term mission could not be found for FFTF, it was placed in standby, and a recommendation was made that it be shut down. Purpose of the FFTF Transition Project is to prepare it for Decontamination and Decommissioning; this will be accomplished by establishing a passively safe and environmentally secure configuration, that can be preserved for several decades. This report presents the results of the mission analysis, which is required by Hanford systems engineering procedures.
Date: May 25, 1995
Creator: Lund, D.P.
Partner: UNT Libraries Government Documents Department

FFTF Authorization Agreement

Description: The purpose of the Authorization Agreement is to serve as a mechanism whereby the U.S. Department of Energy, Richland Operations Office (RL) and Fluor Hanford (FH) jointly clarify and agree to key conditions for conducting work safely and efficiently.
Date: February 25, 2000
Creator: DAUTEL, W.A.
Partner: UNT Libraries Government Documents Department

CLOSURE OF THE FAST FLUX TEST FACILITY (FFTF) HISTORY & STATUS & FUTURE PLANS

Description: In 1993, the US Department of Energy (DOE) decided to shut down the Fast Flux Test Facility (FFTF) due to lack of national missions that justified the annual operating budget of approximately $88M/year. The initial vision was to ''deactive'' the facility to an industrially and radiologically safe condition to allow long-term, minimal surveillance storage until approximately 2045. This approach would minimize near term cash flow and allow the radioactive decay of activated components. The final decontamination and decommissioning (D and D) would then be performed using then-current methodology in a safe and efficient manner. the philosophy has now changed to close coupling the initial deactivation with final D and D. This paper presents the status of the facility and focuses on the future challenge of sodium removal.
Date: February 24, 2006
Creator: FARABEE, O.A.
Partner: UNT Libraries Government Documents Department

FFTF (FAST FLUX TEST FACILITY) REACTOR CHARACTERIZATION PROGRAM ABSOLUTE FISSION RATE MEASUREMENTS

Description: Absolute fission rate measurements using modified National Bureau of Standards fission chambers were performed in the Fast Flux Test Facility at two core locations for isotopic deposits of {sup 232}Th, {sup 233}U, {sup 235}U, {sup 238}U, {sup 237}Np, {sup 239}Pu, {sup 240}Pu, and {sup 241}Pu. Monitor chamber results at a third location were analyzed to support other experiments involving passive dosimeter fission rate determinations.
Date: May 1, 1981
Creator: JL, FULLER; DM, GILLIAM; JA, GRUNDL; JA, RAWLINS & JW, DAUGHTRY