176 Matching Results

Search Results

Advanced search parameters have been applied.

Light Water Reactor Sustainability Program FY13 Status Update for EPRI - RISMC Collaboration

Description: The purpose of the Risk Informed Safety Margin Characterization (RISMC) Pathway research and development (R&D) is to support plant decisions for risk-informed margins management with the aim to improve economics, reliability, and sustain safety of current NPPs. Goals of the RISMC Pathway are twofold: (1) Develop and demonstrate a risk-assessment method coupled to safety margin quantification that can be used by NPP decision makers as part of their margin recovery strategies. (2) Create an advanced "RISMC toolkit" that enables more accurate representation of NPP safety margin. In order to carry out the R&D needed for the Pathway, the Idaho National Laboratory (INL) is collaborating with the Electric Power Research Institute (EPRI) in order to focus on applications of interest to the U.S. nuclear power industry. This report documents the collaboration activities performed between INL and EPRI during FY2013.
Date: September 1, 2013
Creator: Smith, Curtis
Partner: UNT Libraries Government Documents Department

Assessing I-Grid(TM) web-based monitoring for power quality and reliability benchmarking

Description: This paper presents preliminary findings from DOEs pilot program. The results show how a web-based monitoring system can form the basis for aggregation of data and correlation and benchmarking across broad geographical lines. A longer report describes additional findings from the pilot, including impacts of power quality and reliability on customers operations [Divan, Brumsickle, Eto 2003].
Date: April 30, 2003
Creator: Divan, Deepak; Brumsickle, William & Eto, Joseph
Partner: UNT Libraries Government Documents Department

Assessment of U.S. Energy Wave Resources: Cooperative Research and Development Final Report, CRADA Number CRD-09-328

Description: In terms of extractable wave energy resource for our preliminary assessment, the EPRI/National Renewable Energy Laboratory (NREL) assumed that 15% of the available resource could be extracted based on societal constraints of a 30% coverage of the coastline with a 50% efficient wave energy absorbing device. EPRI recognizes that much work needs to be done to better define the extractable resource and we have outlined a comprehensive approach to doing this in our proposed scope of work, along with specific steps for refining our estimate of the available wave energy resources.
Date: June 1, 2012
Creator: Scott, G.
Partner: UNT Libraries Government Documents Department

NOx Control Options and Integration for US Coal Fired Boilers

Description: This is the seventeenth Quarterly Technical Report for DOE Cooperative Agreement No: DEFC26-00NT40753. The goal of the project is to develop cost effective analysis tools and techniques for demonstrating and evaluating low NOx control strategies and their possible impact on boiler performance for boilers firing US coals. The Electric Power Research Institute (EPRI) is providing co-funding for this program. The SCR slipstream reactor was assembled and installed at Plant Gadsden this quarter. Safety equipment for ammonia had not been installed at the end of the quarter, but will be installed at the beginning of next quarter. The reactor will be started up next quarter. Four ECN corrosion probes were reinstalled at Gavin and collected corrosion data for approximately one month. Two additional probes were installed and removed after about 30 hours for future profilometry analysis. Preliminary analysis of the ECN probes, the KEMA coupons and the CFD modeling results all agree with the ultrasonic tube test measurements gathered by AEP personnel.
Date: September 30, 2004
Creator: Bockelie, Mike; Davis, Kevin; Shino, Connie Senior Darren; Swenson, Dave; Baxter, Larry; Bartholomew, Calvin et al.
Partner: UNT Libraries Government Documents Department

NOx Control Options and Integration for US Coal Fired Boilers

Description: This is the nineteenth Quarterly Technical Report for DOE Cooperative Agreement No: DEFC26-00NT40753. The goal of the project is to develop cost effective analysis tools and techniques for demonstrating and evaluating low NO{sub x} control strategies and their possible impact on boiler performance for boilers firing US coals. The Electric Power Research Institute (EPRI) is providing co-funding for this program. Refurbished corrosion probes were installed at Plant Gavin and operated for approximately 1,300 hours. This quarterly report includes further results from the BYU catalyst characterization lab and the in-situ lab, and includes the first results from a model suitable for comprehensive simulation codes for describing catalyst performance. The SCR slipstream reactor at Plant Gadsden operated for approximately 100 hours during the quarter because of ash blockage in the inlet probe.
Date: March 31, 2005
Creator: Bockelie, Mike; Davis, Kevin; Senior, Connie; Shino, Darren; Swenson, Dave; Baxter, Larry et al.
Partner: UNT Libraries Government Documents Department

NOx Control Options and Integration for US Coal Fired Boilers

Description: This is the eighteenth Quarterly Technical Report for DOE Cooperative Agreement No: DEFC26-00NT40753. The goal of the project is to develop cost effective analysis tools and techniques for demonstrating and evaluating low NOx control strategies and their possible impact on boiler performance for boilers firing US coals. The Electric Power Research Institute (EPRI) is providing co-funding for this program. Safety equipment for ammonia for the SCR slipstream reactor at Plant Gadsden was installed. The slipstream reactor was started and operated for about 1400 hours during the last performance period. Laboratory analysis of exposed catalyst and investigations of the sulfation of fresh catalyst continued at BYU. Thicker end-caps for the ECN probes were designed and fabricated to prevent the warpage and failure that occurred at Gavin with the previous design. A refurbished ECN probe was successfully tested at the University of Utah combustion laboratory. Improvements were implemented to the software that controls the flow of cooling air to the ECN probes.
Date: December 31, 2004
Creator: Bockelie, Mike; Davis, Kevin; Senior, Connie; Shino, Darren; Swenson, Dave; Baxter, Larry et al.
Partner: UNT Libraries Government Documents Department

NOx Control Options and Integration for US Coal Fired Boilers

Description: This is the thirteenth Quarterly Technical Report for DOE Cooperative Agreement No: DEFC26-00NT40753. The goal of the project is to develop cost effective analysis tools and techniques for demonstrating and evaluating low NO{sub x} control strategies and their possible impact on boiler performance for boilers firing US coals. The Electric Power Research Institute (EPRI) is providing co-funding for this program. This program contains multiple tasks and good progress is being made on all fronts. The corrosion probe task is proceeding: Two plant visits were made to prepare for field testing and shakedown tests for the probes were conducted at the University of Utah''s L1500 furnace. Corrosion probes will be installed at the Gavin Plant site in the next quarter. Laboratory studies of SCR catalyst continued this quarter. FTIR studies of catalyst sulfation and of adsorption of NH3 and NO were continued at BYU. NO activities have been measured for a number of samples of BYU catalyst and insights have been gained from the results. Plans are being detailed to test monolith and plate catalysts exposed in the field. In this quarter, the catalysts in the slipstream reactor at AEP's Rockport plant were exposed to the dusty flue gas for 1695 hours. Thus the cumulative catalyst exposure to flue gas rose from 980 hours last quarter to 2677 hours in this quarter. Loss of catalyst activity was noted between April (when the catalysts were fresh) and August. Further analysis of activity data will be needed.
Date: September 30, 2003
Creator: Bockelie, Mike; Davis, Kevin; Linjewile, Temi; Senior, Connie; Eddings, Eric; Whitty, Kevin et al.
Partner: UNT Libraries Government Documents Department

Computer Simulation of Scale Formation

Description: This paper summarizes results of recent analyses performed by Battelle-Northwest in EPRI project RP 653-3: Computer Simulation of Scaling in Geothermal Systems. The results reported here are drawn primarily from case evaluations performed over the 12 months since the preceding EPRI Geothermal Symposium held in Monterey in June 1979. The present project is a continuation of a previous project designated RP 653-1. The ultimate objective of research performed in this project is to develop analytical tools (computer codes) and the supporting thermophysical and chemical data base that can be used to predict scaling and corrosion in geothermal power generating systems.
Date: December 1, 1980
Creator: Lessor, D.L. & Kreid, D.K.
Partner: UNT Libraries Government Documents Department

Arundo Donax Analysis Report

Description: This is a summary report of preliminary analysis conducted on Arundo Donax. Arundo Donax was received from Greenwood Resources via Portland General Electric. PGE plans to transition a coal-fired boiler to 100% biomass by 2020, and has partnered with EPRI and INL to conduct the necessary testing and development to understand what needs to take place to make this transition. Arundo Donax is a promising energy crop for biopower, and is as yet relatively untested and uncharacterized. The INL has begun initial characterization of this material, and this summary report presents the initial findings.
Date: January 1, 2012
Creator: Corrie I. Nichol, Ph.D. & Tyler L. Westover, Ph.D.
Partner: UNT Libraries Government Documents Department

A REVIEW OF ASSUMPTIONS AND ANALYSIS IN EPRI EA-3409,"HOUSEHOLD APPLIANCE CHOICE: REVISION OF REEPS BEHAVIORAL MODELS"

Description: This paper revises and extends EPRI report EA-3409, ''Household Appliance Choice: Revision of REEPS Behavioral Models.'' That paper reported the results of an econometric study of major appliance choice in new residential construction. Errors appeared in two tables of that report. We offer revised versions of those tables, and a brief analysis of the consequences and significance of the errors. The present paper also proposes several possible extensions and re-specifications of the models examined by EPRI. Some of these are judged to be highly successful; they both satisfy economic intuition more completely than the original specification and produce a better quality fit to the dependent variable. We feel that inclusion of these modifications produces a more useful set of coefficients for economic modeling than the original specification. This paper focuses on EPRI's models of residential space heating technology choice. That choice was modeled as a nested logit structure, with consumers choosing whether to have central air conditioning or not, and, given that choice, what kind of space heating system to have. The model included five space heating alternatives with central cooling (gas, oil, and electric forced-air; heat pumps; and electric baseboard) and eight alternatives without it (gas, oil, and electric forced-air; gas and oil boilers and non-central systems; and electric baseboard heat). The structure of the nested logit model is shown in Figure 1.
Date: May 1, 1989
Creator: Wood, D.J.; Ruderman, H. & McMahon, J. E.
Partner: UNT Libraries Government Documents Department

Upgraded Coal Interest Group

Description: The Upgraded Coal Interest Group (UCIG) is an EPRI 'users group' that focuses on clean, low-cost options for coal-based power generation. The UCIG covers topics that involve (1) pre-combustion processes, (2) co-firing systems and fuels, and (3) reburn using coal-derived or biomass-derived fuels. The UCIG mission is to preserve and expand the economic use of coal for energy. By reducing the fuel costs and environmental impacts of coal-fired power generation, existing units become more cost effective and thus new units utilizing advanced combustion technologies are more likely to be coal-fired.
Date: January 8, 2009
Creator: Hughes, Evan
Partner: UNT Libraries Government Documents Department

Electric Power Research Institute Environmental Control Technology Center Report to the Steering Committee

Description: Operations and maintenance continued this month at the Electric Power Research Institute's (EPRI�s) Environmental Control Technology Center (ECTC). Testing for the month involved the Dry Sorbent Injection (DSI) test block with the Carbon Injection System. Also, several installation activities were initiated this month for the testing of a new EPRI/ADA Technologies sorbent sampling system in December. The 1.0 MW Cold-Side Selective Catalytic Reduction (SCR) unit, the 0.4 MW Mini Pilot Wet Scrubber, and the 4.0 MW Pilot Wet Scrubber remained idle this month in a cold-standby mode and were inspected regularly. These units remain available for testing as future work is identified.
Date: November 1, 1997
Partner: UNT Libraries Government Documents Department

Electric Power Research Institute Environmental Control Technology Center Report to the Steering Committee

Description: Operations and maintenance continued this month at the Electric Power Research Institute's (EPRI�s) Environmental Control Technology Center (ECTC). Testing for the month involved the Dry Sorbent Injection (DSI) test block with the Carbon Injection System. The 1.0 MW Cold-Side Selective Catalytic Reduction (SCR) unit, the 0.4 MW Mini-Pilot Wet Scrubber, and the 4.0 MW Pilot Wet Scrubber remained idle this month in a cold-standby mode and were inspected regularly. These units remain available for testing as future project work is identified.
Date: January 12, 1998
Partner: UNT Libraries Government Documents Department

Electric Power Research Institute: Environmental Control Technology Center

Description: Operations and maintenance continued this month at the Electric Power Research Institute`s (EPRI`s) Environmental Control Technology Center (ECTC). Testing for the month continued with the DOE/PRDA Phase I investigation of the Clear Liquor Scrubbing Process with Anhydrite Production. The DOE/PRDA Phase I testing of the B&W/Condensing Heat Exchanger (CH) was completed this month. This one-year tube wear analysis investigation was completed on 3/10/97, and a final inspection of the unit was made on 3/21/97. The CH unit and its related equipment are currently being removed from the ECTC test configuration, disassembled, and returned to B&W and CH Corp. for additional analyses. The 1.0 MW Cold-Side Selective Catalytic Reduction (SCR) unit and the Carbon Injection System (the Pulse-jet Fabric Filter) remained idle this month in a cold-standby mode and were inspected regularly.
Date: March 1, 1997
Partner: UNT Libraries Government Documents Department

CLEAR LIQUOR SCRUBBING WITH ANHYDRITE PRODUCTION

Description: This project is funded by the US Department of Energy's Federal Energy Technology Center (DOE/FETC) under a cost-sharing PRDA with Radian International. The Electric Power Research Institute (EPRI) is providing co-funding and technical oversight. The project is part of FETC's Advanced Power Systems Program, whose mission is to accelerate the commercialization of affordable, high-efficiency, low emission, coal-fueled electric generating technologies. This project was submitted in response to Area 4 of DOE's Mega-PRDA: Advanced High-Performance SO{sub 2} Control Concepts. The goals of this research area are to develop advanced flue gas desulfurization (FGD) processes that achieve greater than 99% SO{sub 2} removal efficiency, are 25% cheaper than commercial FGD systems, and provide a valuable byproduct that will be recycled rather than disposed. Area 4 also included the development of a byproduct process that could be added to FGD systems to produce high value byproducts for reuse rather than disposal.
Date: August 1, 1998
Creator: SKARUPA, R.C. & CAREY, T.R.
Partner: UNT Libraries Government Documents Department

Electric Power Research Institute: Environmental Control Technology Center

Description: Operations and maintenance continued this month at the Electric Power Research Institute`s (EPRI`s) Environmental Control Technology Center (ECTC). Testing for the month continued with the Phase I DOE/PRDA investigation of the Clear Liquor Scrubbing Process with Anhydrite Production and Chloride Control. The Phase I DOE/PRDA testing of the B&W/Condensing Heat Exchanger (CHE) also continued this month as the inlet particulate control system (installed September 1996) is maintaining the inlet particulate mass loading to the unit at an average value of 0.2 lb./MMBTU. The one-year tube wear analysis project conducted across this unit will be completed in the early part of March. At the completion of testing, a final inspection will be conducted before the unit is cleaned, disassembled, and returned to B&W and CH Corp. for additional analysis. Once the unit is removed from the ECTC, the 0.4 MW Mini-Pilot Wet Scrubber unit will be assembled and configured back into the flue gas path for future testing. The 1.0 MW Cold-Side Selective Catalytic Reduction (SCR) unit and the Carbon Injection System (the Pulse-jet Fabric Filter configuration) remained idle this month in a cold-standby mode and were inspected regularly. In February 1997, the Clear Liquor Scrubbing with Anhydrite Production test block continued. This PRDA project is being jointly funded by the Electric Power Research Institute and the Department of Energy and is part of the DOE`s Advanced Power Systems Program, whose mission is to accelerate the commercialization of affordable, high-efficiency, low-emission, coal-fueled electric generating technologies. The pilot portion of the CLS/Anhydrite project is being conducted on the 4.0 MW wet FGD pilot unit at EPRI`s Environmental Control Technology Center (ECTC). The project is designed to develop an advanced FGD process incorporating chloride control, clear liquor scrubbing, and anhydrite (anhydrous calcium sulfate) production. While the three areas of the integrated process can ...
Date: February 1, 1997
Partner: UNT Libraries Government Documents Department

Electrical Power Research Institute Environmental Control Technology Center Report to the Steering Committee

Description: Operations and maintenance continued this month at the Electric Power Research Institute's (EPRI�s) Environmental Control Technology Center (ECTC). Testing for the month involved the EPRI/ADA Technologies dry sorbent sampling unit and the testing of Hg catalysts/sorbents in this low-flow, temperature controlled system. The 1.0 MW Cold-Side Selective Catalytic Reduction (SCR) unit, the 0.4 MW Mini Pilot Wet Scrubber, and the 4.0 MW Pilot Wet Scrubber remained idle this month in a cold-standby mode and were inspected regularly. These units remain available for testing as future work is identified.
Date: February 18, 1998
Partner: UNT Libraries Government Documents Department

Electric Power Research Institute Environmental Control Technology Center Report to the Steering Committee

Description: Operations and maintenance continued this month at the Electric Power Research Institute's (EPRI�s) Environmental Control Technology Center (ECTC). Testing for the month involved the Dry Sorbent Injection (DSI) test block with the Carbon Injection System. The 1.0 MW Cold-Side Selective Catalytic Reduction (SCR) unit, the 0.4 MW Mini Pilot Wet Scrubber, and the 4.0 MW Pilot Wet Scrubber remained idle this month in a cold-standby mode and were inspected regularly. These units remain available for testing as future work is identified.
Date: October 1, 1997
Partner: UNT Libraries Government Documents Department

COMPUTATIONAL FLUID DYNAMICS BASED INVESTIGATION OF SENSITIVITY OF FURNACE OPERATIONAL CONDITIONS TO BURNER FLOW CONTROLS

Description: This is the extended second Semiannual Technical Report for DOE Cooperative Agreement No: DE-FC26-02NT41580. The goal of this project is to systematically assess the sensitivity of furnace operational conditions to burner air and fuel flows in coal fired utility boilers. Our approach is to utilize existing baseline furnace models that have been constructed using Reaction Engineering International's (REI) computational fluid dynamics (CFD) software. Using CFD analyses provides the ability to carry out a carefully controlled virtual experiment to characterize the sensitivity of NOx emissions, unburned carbon (UBC), furnace exit CO (FECO), furnace exit temperature (FEGT), and waterwall deposition to burner flow controls. The Electric Power Research Institute (EPRI) is providing co-funding for this program, and instrument and controls experts from EPRI's Instrument and Controls (I&C) Center are active participants in this project. This program contains multiple tasks and good progress is being made on all fronts.
Date: June 1, 2004
Creator: Cremer, Marc; Chen, Zumao; Wang, Dave & Wolff, Paul
Partner: UNT Libraries Government Documents Department

Sensor for Individual Burner Control of Firing Rate, Fuel-Air Ratio, and Coal Fineness Correlation

Description: To minimize program cost, additional testing is planned to be performed in concert with EPRI-funded testing at the Coal Flow Test Facility in late July. This will be followed by field testing to be performed by EPRI in August. The minimal effort put into the analysis during this reporting period revealed surprising variation in the trends of the dynamic signatures over time. It is unclear whether these temporal trends are related to noise or to the actual dynamics. Further data analysis and fine-tuning of the algorithm will be done upon arrival of the data to be collected in the near future.
Date: July 1, 2005
Creator: Hill, Wayne & Demler, Roger
Partner: UNT Libraries Government Documents Department

Sensor for Individual Burner Control of Firing Rate, Fuel-Air Ratio, and Coal Fineness Correlation, Quarterly Report: April-June 2004

Description: The project's overall objective is to develop a commercially viable sensing system to infer the flow rate and fineness of pulverized coal flows using the dynamic signature from a pipe-mounted accelerometer. The preliminary calibration data for this effort will be obtained using a Coal Flow Test Facility built and operated by our subcontractor, Airflow Sciences Corporation, in support of an EPRI program. Airflow Sciences encountered significant difficulty getting the system up and running, with the final hurdles related to the system controls. These problems were resolved in this reporting period, so that the facility is ready for testing. Shakedown testing with our instrumentation package began late in the reporting period. Preliminary analysis of the resulting data indicates that there are problems with the instrumentation and/or test rig. Even with no flow passing through the test section, a power spectrum of the data shows strong frequency ''lines''. The data should be free of such behaviors, so the instrumentation must be recording behaviors that are unrelated to the flow. This issue must be resolved before calibration data are collected. A preliminary effort to debug the problem through long-distance consultation between Foster-Miller and Airflow Sciences personnel at the end of the reporting period did not discover the source of the problem. Consequently, a Foster-Miller engineer will visit the test facility early in the next reporting period. Assuming this effort is successful, preliminary testing and analysis should be completed in the next reporting period. Because of slack in the program schedule, there should be no net effect on the program scope, cost, or schedule.
Date: October 2004
Creator: Hill, Wayne
Partner: UNT Libraries Government Documents Department

Next Generation Geothermal Power Plants (NGGPP) process data for binary cycle plants

Description: The Next Generation Geothermal Power Plants (NGGPP) study provides the firm estimates - in the public domain - of the cost and performance of U.S. geothermal systems and their main components in the early 1990s. The study was funded by the U.S. Department of Energy Geothermal Research Program, managed for DOE by Evan Hughes of the Electric Power Research Institute, Palo Alto, CA, and conducted by John Brugman and others of the CE Holt Consulting Firm, Pasadena, CA. The printed NGGPP reports contain detailed data on the cost and performance for the flash steam cycles that were characterized, but not for the binary cycles. The nine Tables in this document are the detailed data sheets on cost and performance for the air cooled binary systems that were studied in the NGGPP.
Date: October 2, 1996
Partner: UNT Libraries Government Documents Department

Solar-Assisted Electric Vehicle Charging Station Interim Report

Description: Oak Ridge National Laboratory (ORNL) has been awarded $6.8 million in the Department of Energy (DOE) American Recovery and Reinvestment Act (ARRA) funds as part of an overall $114.8 million ECOtality grant with matching funds from regional partners to install 125 solar-assisted Electric Vehicle (EV) charging stations across Knoxville, Nashville, Chattanooga, and Memphis. Significant progress has been made toward completing the scope with the installation of 25 solar-assisted charging stations at ORNL; six stations at Electric Power Research Institute (EPRI); and 27 stations at Nissan's Smyrna and Franklin sites, with three more stations under construction at Nissan's new lithium-ion battery plant. Additionally, the procurement process for contracting the installation of 34 stations at Knoxville, the University of Tennessee Knoxville (UTK), and Nashville sites is underway with completion of installation scheduled for early 2012. Progress is also being made on finalizing sites and beginning installations of 30 stations in Nashville, Chattanooga, and Memphis by EPRI and Tennessee Valley Authority (TVA). The solar-assisted EV charging station project has made great strides in fiscal year 2011. A total of 58 solar-assisted EV parking spaces have been commissioned in East and Middle Tennessee, and progress on installing the remaining 67 spaces is well underway. The contract for the 34 stations planned for Knoxville, UTK, and Nashville should be underway in October with completion scheduled for the end of March 2012; the remaining three Nissan stations are under construction and scheduled to be complete in November; and the EPRI/TVA stations for Chattanooga, Vanderbilt, and Memphis are underway and should be complete by the end of March 2012. As additional Nissan LEAFs are being delivered, usage of the charging stations has increased substantially. The project is on course to complete all 125 solar-assisted EV charging stations in time to collect meaningful data by the end of ...
Date: September 1, 2011
Creator: Lapsa, Melissa Voss; Durfee, Norman; Maxey, L Curt & Overbey, Randall M
Partner: UNT Libraries Government Documents Department