Sandia National Laboratories approach to emergency preparedness

Description: Sandia National Laboratories is located on Kirtland AFB on Albuquerque, NM. The Air Force Base proper covers about 74 square miles in which SNL maintains 5 technical areas and the Coyote Test Field. These SNL areas add up to about 18,000 acres. However, SNL has other locations where we conduct corporate emergency planning: Kauai Test Facility (at Pacific Missile Range Facility in Kauai, Hawaii), and the Tonopah Test Range (Nevada). SNL/California located in Livermore has an independent emergency preparedness organization for their emergency planning activities.
Date: December 31, 1997
Creator: Galegar, F. H.; Yourick, P. D. & Ross, S. A.
Partner: UNT Libraries Government Documents Department

HAMMER FY 1997 multi-year work plan WBS 8.2

Description: The Hazardous Materials Management and Emergency Response (HAMMER) Program is a Congressionally funded National Program line item which is managed by the U.S. Department of Energy to develop and demonstrate new approaches to health and safety training and to use occupational health medical surveillance and risk analysis information to enhance the HAMMER training programs. Hanford is the pilot for this program with the HAMMER user facility as the major component.
Date: September 23, 1996
Creator: Mcginnis, K.A.
Partner: UNT Libraries Government Documents Department

Evaluator/controller practicum for US Department of Energy emergency exercises

Description: Argonne National Laboratory has designed a practicum to help ensure that exercises at Department of Energy (DOE) facilities provide results that will be useful in maintaining or improving emergency preparedness while ensuring the safety of the public and the exercise participants. Participants in the first two offerings of the practicum came from DOE facilities nationwide. The practicum augments the usual forms of controller and evaluator training with actual practice in carrying out controller and evaluator roles. Feedback from participants indicated substantial benefit from the training. Many of the participants expressed a desire to present such training to others at their home facilities.
Date: December 31, 1996
Creator: Lacher, L.; Converse, R.; Gasper, W. & Mitrani, J.
Partner: UNT Libraries Government Documents Department

Projectizing the development and/or maintenance process for emergency response/contingency plans

Description: The attainment of established goals and objects is essential and paramount for all successful projects in business and industry, including the development and/or maintenance of emergency response/contingency plans. The need for effective project management is an ongoing effort. As with any aspect of business, better ways of managing projects have been and are being developed. Those organizations that take the lead in implementing these capabilities consistently perform their projects better, and in the case of emergency management, provide better protection to employees, property, and the environment.
Date: July 1, 2000
Creator: Francis, A. A.
Partner: UNT Libraries Government Documents Department

283-E and 283-W Hazards Assessment

Description: This document establishes the technical basis in support of Emergency Planning Activites for the 283-E and 283-W Facilities on the Hanford Site. Through this document, the technical basis for the development of facility specific Emergency Action Levels and the Emergency Planning Zone is demonstrated.
Date: September 8, 1995
Creator: Sutton, L.N.
Partner: UNT Libraries Government Documents Department

Summary report of incineration plenum fire: Building 771, July 2, 1980

Description: At about 1100 on July 2, 1980, a temperature rise above normal was recorded on charts monitoring operation of the incinerator in Room 149, Building 771. The plenum overheat alarm sounded at 1215, emergency actions initiated, and the fire was extinguished and mop-up began at about 1300. Investigation determined that the fire in the plenum was caused by a heat rise in the system, a deteriorated bypass valve on the No. 3 heat exchanger (KOH scrubber), nitration of the urethane seal on the HEPA filter media to the filter frame, and accumulation of metallic fines on the filter media. It was concluded that the management system responded properly, except for the ring- down system to activate the Emergency Operations Center.
Date: May 31, 1995
Creator: Fretthold, J.K.
Partner: UNT Libraries Government Documents Department

FRMAC Interactions During a Radiological or Nuclear Event

Description: During a radiological or nuclear event of national significance the Federal Radiological Emergency Monitoring and Assessment Center (FRMAC) assists federal, state, tribal, and local authorities by providing timely, high-quality predictions, measurements, analyses and assessments to promote efficient and effective emergency response for protection of the public and the environment from the consequences of such an event.
Date: January 27, 2011
Creator: Wong, C T
Partner: UNT Libraries Government Documents Department

Development of a Rapidly Deployed Department of Energy Emergency Response Element

Description: The Federal Radiological Emergency Response Plan (FRERP) directs the Department of Energy (DOE) to maintain a viable, timely, and fully documented response option capable of supporting the responsible Lead Federal Agency in the event of a radiological emergency impacting any state or US territory (e.g., CONUS). In addition, the DOE maintains a response option to support radiological emergencies outside the continental US (OCONUS). While the OCUNUS mission is not governed by the FREP, this response is operationally similar to that assigned to the DOE by the FREP. The DOE is prepared to alert, activate, and deploy radiological response teams to augment the Radiological Assistance Program and/or local responders. The Radiological Monitoring and Assessment Center (RMAC) is a phased response that integrates with the Federal Radiological Monitoring and Assessment Center (FRMAC) in CONUS environments and represents a stand-alone DOE response for OCONUS environments. The FRMAC/RMAC Phase I was formally ''stood up'' as an operational element in April 1999. The FRMAC/RMAC Phase II proposed ''stand-up'' date is midyear 2000.
Date: October 1, 1999
Creator: Riland, C.A.; Hopkins, R.C. & Tighe, R.J.
Partner: UNT Libraries Government Documents Department

RCRA corrective action determination of no further action

Description: On July 27, 1990, the U.S. Environmental Protection Agency (EPA) proposed a regulatory framework (55 FR 30798) for responding to releases of hazardous waste and hazardous constituents from solid waste management units (SWMUs) at facilities seeking permits or permitted under the Resource Conservation and Recovery Act (RCRA). The proposed rule, `Corrective Action for Solid Waste Management Units at Hazardous Waste Facilities`, would create a new Subpart S under the 40 CFR 264 regulations, and outlines requirements for conducting RCRA Facility Investigations, evaluating potential remedies, and selecting and implementing remedies (i.e., corrective measures) at RCRA facilities. EPA anticipates instances where releases or suspected releases of hazardous wastes or constituents from SWMUs identified in a RCRA Facility Assessment, and subsequently addressed as part of required RCRA Facility Investigations, will be found to be non-existent or non-threatening to human health or the environment. Such releases may require no further action. For such situations, EPA proposed a mechanism for making a determination that no further corrective action is needed. This mechanism is known as a Determination of No Further Action (DNFA) (55 FR 30875). This information Brief describes what a DNFA is and discusses the mechanism for making a DNFA. This is one of a series of Information Briefs on RCRA corrective action.
Date: June 1, 1996
Partner: UNT Libraries Government Documents Department

Meteorological forecasting for emergency preparedness and response at the Kennedy Space Center of Florida

Description: The NORAPS model has been used to simulate the motion of Hurricane Erin over Florida. A triplynested grid was used to capture the meteorological features which span from regional to local scales with the highest resolution nest centered at the Kennedy Space Center area. The simulated storm track agreed remarkably well with the observed path of the hurricane. There was also good qualitative agreement between the computed surface precipitation pattern and observations based on radar signatures. Although the validity of the Kuo- type cumulus parameterization scheme used in the model was marginal and even questionable on the finest resolution (4 km) nest, the simulated results were nevertheless qualitatively reasonable. The results generated by NORAPS from the simulation of such a numerical challenging meteorological event were very encouraging. Our next step is to use the meteorological information from the model to provide wind fields for dispersion model simulations of potential atmospheric releases.
Date: October 13, 1995
Creator: Lee, R.L.; Albritton, J.R.; Ermak, D.L.; Hodur, R. & Liou, C.S.
Partner: UNT Libraries Government Documents Department

Vitalinks

Description: The objectives of the VITALINKS tabletop exercise are to: Raise awareness of infrastructure interdependency issues; Identify and focus on the most important vulnerabilities and restoration priorities resulting from infrastructure disruptions; Examine the resources (people and equipment) required to sustain systems under emergency conditions; Identify and highlight roles, responsibilities, and authorities (including trans-border issues); and Continue to foster a more effective interface among public and private sector service providers and public officials in developing and implementing critical infrastructure protection, mitigation, response, and recovery options.
Date: March 11, 2002
Creator: Baldwin, T. B.
Partner: UNT Libraries Government Documents Department

PFP Emergency Lighting Study

Description: NFPA 101, section 5-9 mandates that, where required by building classification, all designated emergency egress routes be provided with adequate emergency lighting in the event of a normal lighting outage. Emergency lighting is to be arranged so that egress routes are illuminated to an average of 1.0 footcandle with a minimum at any point of 0.1 footcandle, as measured at floor level. These levels are permitted to drop to 60% of their original value over the required 90 minute emergency lighting duration after a power outage. The Plutonium Finishing Plant (PFP) has two designations for battery powered egress lights ''Emergency Lights'' are those battery powered lights required by NFPA 101 to provide lighting along officially designated egress routes in those buildings meeting the correct occupancy requirements. Emergency Lights are maintained on a monthly basis by procedure ZSR-12N-001. ''Backup Lights'' are battery powered lights not required by NFPA, but installed in areas where additional light may be needed. The Backup Light locations were identified by PFP Safety and Engineering based on several factors. (1) General occupancy and type of work in the area. Areas occupied briefly during a shiftly surveillance do not require backup lighting while a room occupied fairly frequently or for significant lengths of time will need one or two Backup lights to provide general illumination of the egress points. (2) Complexity of the egress routes. Office spaces with a standard hallway/room configuration will not require Backup Lights while a large room with several subdivisions or irregularly placed rooms, doors, and equipment will require Backup Lights to make egress safer. (3) Reasonable balance between the safety benefits of additional lighting and the man-hours/exposure required for periodic light maintenance. In some plant areas such as building 236-Z, the additional maintenance time and risk of contamination do not warrant having Backup ...
Date: February 2, 2000
Creator: Busch, M. S.
Partner: UNT Libraries Government Documents Department

ATR-Hanford site emergency alerting system -- 400 Area (F1-F2) and 600 Area (S6-S10)

Description: This document provides the results of the acceptance test procedure performed under document number: HNF-2501, Rev 0. This Acceptance Test Procedure has been prepared to demonstrate the Hanford Site Emergency Alerting System functions as required by Specification WHC-S0454, Rev. 1 and project criteria.
Date: May 28, 1998
Creator: Whattam, J.W.
Partner: UNT Libraries Government Documents Department

Hanford Site Emergency Alerting System siren testing report

Description: The purpose of the test was to determine the effective coverage of the proposed upgrades to the existing Hanford Site Emergency Alerting System (HSEAS). The upgrades are to enhance the existing HSEAS along the Columbia River from the Vernita Bridge to the White Bluffs Boat Launch as well as install a new alerting system in the 400 Area on the Hanford Site. Five siren sites along the Columbia River and two sites in the 400 Area were tested to determine the site locations that will provide the desired coverage.
Date: August 13, 1997
Creator: Weidner, L.B.
Partner: UNT Libraries Government Documents Department

Sandia Lightning Simulation Facility Building 888. Hazards assessment document

Description: The Department of Energy Order 5500.3A requires facility-specific hazards assessments be prepared, maintained, and used for emergency planning purposes. This hazards assessment document describes the chemical and radiological hazards associated with the Sandia Lightning Simulation Facility, Building 888. The entire inventory was screened according to the potential airborne impact to onsite and offsite individuals. The air dispersion model, ALOHA, estimated pollutant concentrations downwind from the source of a release, taking into consideration the toxicological and physical characteristics of the release site, the atmospheric conditions, and the circumstances of the release. The greatest distance at which a postulated facility event will produce consequences exceeding the Early Severe Health Effects threshold is 23 meters. The highest emergency classification is a Site Area Emergency. The Emergency Planning Zone is 65 meters.
Date: October 1, 1994
Creator: Banda, Z. & Barnett, B.
Partner: UNT Libraries Government Documents Department

Enforcement handbook: Enforcement of DOE nuclear safety requirements

Description: This Handbook provides detailed guidance and procedures to implement the General Statement of DOE Enforcement Policy (Enforcement Policy or Policy). A copy of this Enforcement Policy is included for ready reference in Appendix D. The guidance provided in this Handbook is qualified, however, by the admonishment to exercise discretion in determining the proper disposition of each potential enforcement action. As discussed in subsequent chapters, the Enforcement and Investigation Staff will apply a number of factors in assessing each potential enforcement situation. Enforcement sanctions are imposed in accordance with the Enforcement Policy for the purpose of promoting public and worker health and safety in the performance of activities at DOE facilities by DOE contractors (and their subcontractors and suppliers) who are indemnified under the Price-Anderson Amendments Act. These indemnified contractors, and their suppliers and subcontractors, will be referred to in this Handbook collectively as DOE contractors. It should be remembered that the purpose of the Department`s enforcement policy is to improve nuclear safety for the workers and the public, and this goal should be the prime consideration in exercising enforcement discretion.
Date: June 1, 1995
Partner: UNT Libraries Government Documents Department

Emergency Planning and Community Right-To-Know Act, Section 311

Description: The following information reflects changes in the lists of hazardous chemicals present at this facility in amounts equal to or greater than 10,000 pounds and extremely hazardous substances present in amounts equal to or greater than 500 pounds or its Threshold Planning Quantity, whichever was lowest. These lists represent the following: list of materials last reported in February 1995; materials to be deleted from list; materials to be added to list; and revised list of materials. The revised list of materials is a composite of the Y-12 Plant Emergency Planing and Community Right-to-Know Act Section 312 report prepared and submitted for calendar year 1995.
Date: March 1, 1996
Creator: Evans, R.A. & Martin, K.J.
Partner: UNT Libraries Government Documents Department

Management of meteorological data at a former nuclear weapons facility

Description: The purposes of the Climatological Data Management and Meteorological Monitoring programs at the Rocky Flats Environmental Technology Site (Site), are to support Emergency Response (ER) programs at the Site for use in assessing the transport, diffusion, and deposition of effluents actually or potentially released into the atmosphere by Site operations, to provide information for on-site and off-site projects concerned with the design of environmental monitoring networks for impact assessments, environmental surveillance activities, and remediation activities. Also, maintenance of a meteorological monitoring network, which includes measuring, archiving, analyzing, interpreting, and summarizing resulting data is required for successfully generating monthly and annual environmental monitoring reports and for providing assistance for on-site and off-site projects. Finally, the Meteorological Monitoring Program provides information for site-specific weather forecasting, which supports Site operations, employee safety, and Emergency Response operations.
Date: March 1, 1995
Creator: Dickerman, C.L. & Maxwell, D.R.
Partner: UNT Libraries Government Documents Department

Training and qualification of health and safety technicians at a national laboratory

Description: Over the last 30 years, Lawrence Livermore National Laboratory (LLNL) has successfully implemented the concept of a multi-disciplined technician. LLNL Health and Safety Technicians have responsibilities in industrial hygiene, industrial safety, health physics, as well as fire, explosive, and criticality safety. One of the major benefits to this approach is the cost-effective use of workers who display an ownership of health and safety issues which is sometimes lacking when responsibilities are divided. Although LLNL has always promoted the concept of a multi-discipline technician, this concept is gaining interest within the Department of Energy (DOE) community. In November 1992, individuals from Oak Ridge Institute of Science and Education (ORISE) and RUST Geotech, joined by LLNL established a committee to address the issues of Health and Safety Technicians. In 1993, the DOE Office of Environmental, Safety and Health, in response to the Defense Nuclear Facility Safety Board Recommendation 91-6, stated DOE projects, particularly environmental restoration, typically present hazards other than radiation such as chemicals, explosives, complex construction activities, etc., which require additional expertise by Radiological Control Technicians. They followed with a commitment that a training guide would be issued. The trend in the last two decades has been toward greater specialization in the areas of health and safety. In contrast, the LLNL has moved toward a generalist approach integrating the once separate functions of the industrial hygiene and health physics technician into one function.
Date: October 1, 1994
Creator: Egbert, W.F. & Trinoskey, P.A.
Partner: UNT Libraries Government Documents Department

The development of seismic guidelines for the Stanford Linear Accelerator Center

Description: This paper describes the development of Seismic Guidelines for the Stanford Linear Accelerator Center (SLAC). Although structures have always been built conservatively, SLAC management decided to review and update their seismic guidelines. SLAC is about mid-way between the epicenters of the 8.3 Richter magnitude 1906 San Francisco and the 7.2 Loma Prieta Earthquakes. The west end of the two mile long electron/positron particle accelerator lies a half mile from the large San Andreas Fault. Suggestions for seismic planning processes were solicited from local computer manufacturing firms, universities, and federal laboratories. A Committee of the various stakeholders in SLAC`s seismic planning retained an internationally known Seismic Planning Consultant and reviewed relevant standards and drafted Guidelines. A panel of seismic experts was convened to help define the hazard, site response spectra, probabilistic analysis of shaking, and near field effects. The Facility`s structures were assigned to seismic classes of importance, and an initial assessment of a sample of a dozen buildings conducted. This assessment resulted in emergency repairs to one structure, and provided a {open_quotes}reality basis{close_quotes} for establishing the final Guidelines and Administrative Procedures, and a program to evaluate remaining buildings, shielding walls, tunnels, and other special structures.
Date: August 1, 1996
Creator: Huggins, R.
Partner: UNT Libraries Government Documents Department

Developing a model lifeline protection program for DOE facilities

Description: A National Lifeline Standard Development Program is currently being conducted by FEMA and NIST. The Department of Energy is following these developments and supplementing them to meet Life-Safety and mission requirements for all DOE facilities as part of the Natural Phenomena Hazards Mitigation Plan. The task will be overseen by a DOE management team with technical guidance provided by a Steering Group of management and operating contractor representatives. The DOE will participate in the federal program by conducting a workshop on lifeline protection issues, developing an overall plan, organizing a Steering Group, and conducting a pilot study at a DOE facility.
Date: November 1, 1996
Creator: Lowing, A.N.
Partner: UNT Libraries Government Documents Department

Project plan for resolution of the organic waste tank safety issues at the Hanford Site

Description: A multi-year project plan for the Organic Safety Project has been developed with the objective of resolving the organic safety issues associated with the High Level Waste (HLW) in Hanford`s single-shell tanks (SSTS) and double-shell tanks (DSTs). The objective of the Organic Safety Project is to ensure safe interim storage until retrieval for pretreatment and disposal operations begins, and to resolve the organic safety issues by September 2001. Since the initial identification of organics as a tank waste safety issue, progress has been made in understanding the specific aspects of organic waste combustibility, and in developing and implementing activities to resolve the organic safety issues.
Date: October 3, 1996
Creator: Meacham, J.E.
Partner: UNT Libraries Government Documents Department