USDOE/EPRI BIOMASS COFIRING COOPERATIVE AGREEMENT

Description: During the period of October 1, 1998 through December 31, 1998, significant work was done in direct preparation for several cofiring tests. Major progress was made on several projects including cofiring at Seward (GPU Genco), Allen (TVA), and Bailly (NIPSCO). Most of the work was focused on construction activities at the Seward and Bailly Generating Stations. The conceptual design and feasibility study for gasification-based cofiring at the Allen Fossil Plant was completed. The feasibility study for cofiring at the Pirkey and Northeastern Generating Stations of Central and South West Utilities (C&SW) also was completed. This report summarizes the activities during the fourth calendar quarter in 1998--of the USDOE/EPRI Biomass Cofiring Cooperative Agreement. It focuses upon reporting the results of construction activities and related events.
Date: January 1, 1999
Creator: Tillman, D. & Hughes, E.
Partner: UNT Libraries Government Documents Department

FETC/EPRI BIOMASS COFIRING COOPERATIVE AGREEMENT

Description: This quarter much progress was made in promoting cofiring through the many FETC/EPRI backed projects. During January 1, 1998 to March 31st, 1998 significant contractual agreements were arranged for future testing and analyses of previous testing were conducted. Most notable was the analysis done on the testing run at the Tennessee Valley Authority�s Colbert Fossil Plant that showed no significant impacts to the plant boiler due to cofiring. Northern Indiana Public Service Company also identified Bailly #7 as the site of the next series of tests using their plants. Other work done on these projects primarily focused on continued cofiring development. This report summarizes the activities during the first quarter in 1998 of the FETC/EPRI Biomass Cofiring Cooperative Agreement. It focuses upon reporting the results of testing in order to highlight the progress at utilities.
Date: August 1, 1998
Creator: TILLMAN, D. & HUGHES, E.
Partner: UNT Libraries Government Documents Department

FETC/EPRI BIOMASS COFIRING COOPERATIVE AGREEMENT

Description: During April 1 st , 1998 to June 31 st , 1998, significant work was done in preparation for a series of test involving cofiring at power plants. A biomass material handling system was designed for the Seward testing, a gasification system was designed for the Allen Fossil Plant, and a test program plan was developed for testing at NIPSCO�s Bailly Station. Also completed this quarter was a cyclone combustion model that provides a color visual representation of estimated temperatures within a plant. This report summarizes the activities during the second quarter in 1998 of the FETC/EPRI Biomass Cofiring Cooperative Agreement. It focuses upon reporting the results of testing in order to highlight the progress at utilities.
Date: August 1, 1998
Creator: TILLMAN, D. & HUGHES, E.
Partner: UNT Libraries Government Documents Department

DESIGNING AN OPPORTUNITY FUEL WITH BIOMASS AND TIRE-DERIVED FUEL FOR COFIRING AT WILLOW ISLAND GENERATING STATION

Description: During the period October 1, 2000 - December 31, 2000, Allegheny Energy Supply Co., LLC (Allegheny) executed a Cooperative Agreement with the National Energy Technology Laboratory to implement a major cofiring demonstration at the Willow Island Generating Station Boiler No.2. Willow Island Boiler No.2 is a cyclone boiler. Allegheny also will demonstrate separate injection cofiring at the Albright Generating Station Boiler No.3, a tangentially fired boiler. The Allegheny team includes Foster Wheeler as its primary subcontractor. Additional subcontractors are Cofiring Alternatives and N.S. Harding and Associates. This report summarizes the activities associated with the Designer Opportunity Fuel program, and demonstrations at Willow Island and Albright Generating Stations. The second quarter of the project involved completing the designs for each location. Further, geotechnical investigations proceeded at each site. Preparations were made to perform demolition on two small buildings at the Willow Island site. Fuels strategies were initiated for each site. Test planning commenced for each site. A groundbreaking ceremony was held at the Willow Island site on October 18, with Governor C. Underwood being the featured speaker.
Date: January 1, 2001
Creator: Payette, K. & Tillman, D.
Partner: UNT Libraries Government Documents Department

USDOE/EPRI BIOMASS COFIRING COOPERATIVE AGREEMENT

Description: During the period of July 1, 2000 through September 30, 2000, alternatives for relocating the Seward Generating Station cofiring project were investigated. Allegheny Energy Supply Company LLC will accept the separate injection demonstration at its Albright Generating Station. During this period, also, efforts were made at program outreach. Papers were given at the Pittsburgh Coal Conference. This report summarizes the activities during the second calendar quarter in 2000 of the USDOE/EPRI Biomass Cofiring Cooperative Agreement. It focuses upon reporting the results of the relocation of Seward, and on the outreach efforts.
Date: October 1, 2000
Creator: Hughes, E. & Tillman, D.
Partner: UNT Libraries Government Documents Department

USDOE/EPRI BIOMASS COFIRING COOPERATIVE AGREEMENT

Description: During the period of April 1, 1999 through June 30, 1999, wood cofiring testing at both Seward Generating Station of GPU Genco and Bailly Generating Station of Northern Indiana Public Service Company provided the focus for all activities. In both cases, the testing was directed at the impacts of cofiring on efficiency, operability, and NO{sub x} emissions. This report summarizes the activities during the second calendar quarter in 1999 of the USDOE/EPRI Biomass Cofiring Cooperative Agreement. It focuses upon reporting the results of testing activities at both generating stations.
Date: July 1, 1999
Creator: Tillman, D. & Hughes, E.
Partner: UNT Libraries Government Documents Department

USDOE/EPRI BIOMASS COFIRING COOPERATIVE AGREEMENT

Description: During the period of April 1, 2000 through June 30, 2000, alternatives for relocating the Seward Generating Station cofiring project were investigated. A test was conducted at Bailly Generating Station of Northern Indiana Public Service Co., firing a blend of Black Thunder (Powder River Basin) coal and Illinois basin coal, in cyclone boiler designed for Illinois basin coal. This test at Bailly was designed to determine the technical feasibility of cofiring at that station using PRB coals. This report summarizes the activities during the second calendar quarter in 2000 of the USDOE/EPRI Biomass Cofiring Cooperative Agreement. It focuses upon reporting the results of construction and testing activities at these generating stations.
Date: July 1, 2000
Creator: Hughes, E. & Tillman, D.
Partner: UNT Libraries Government Documents Department

COFIRING OF BIOMASS AT THE UNIVERSITY OF NORTH DAKOTA

Description: Project kickoff meetings were held this period. One meeting was held at the University of North Dakota (UND) for team members, and a second meeting was held at National Energy Technology Laboratory (NETL) as part of a kickoff for the Cofiring Program under the Department of Energy (DOE) Energy Efficiency and Renewable Energy (EERE) Office. The project is currently involved in the resource assessment task and is finding some promising fuels.
Date: November 1, 2000
Creator: Schmidt, Darren D.
Partner: UNT Libraries Government Documents Department

Biomass power for rural development. Technical progress report, April 1, 1997--June 30, 1997

Description: Detailed task progress reports and schedules are provided for the DOE/USDA sponsored Biomass Power for Rural Development project. The focus of the project is on developing commercial energy crops for power generation by the year 2000. The New York based Salix Consortium project is a multi-partner endeavor, implemented in three stages. Phase-I, Final Design and Project Development, will conclude with the preparation of construction and/or operating permits, feedstock production plans, and contracts ready for signature. Field trials of willow (Salix) have been initiated at several locations in New York (Tully, Lockport, King Ferry, La Fayette, Massena, and Himrod) and co-firing tests are underway at Greenidge Station (NYSEG) and Dunkirk Station (NMPC). Phase-H of the project will focus on scale-up of willow crop acreage, construction of co-firing facilities at Dunkirk Station (NMPC), and final modifications for Greenidge Station. Cofiring willow is also under consideration for GPU`s Seward Station where testing is under way. There will be an evaluation of the energy crop as part of the gasification trials occurring at BED`s McNeill power station. Phase-III will represent fullscale commercialization of the energy crop and power generation on a sustainable basis.
Date: August 1, 1997
Creator: Neuhauser, E.
Partner: UNT Libraries Government Documents Department

Biomass power for rural development. Technical progress report, January 1, 1997--March 31, 1997

Description: Detailed task progress reports and schedules are provided for the DOE/USDA sponsored Biomass Power for Rural Development project. The focus of the project is on developing commercial energy crops for power generation by the year 2000. The New York based Salix Consortium project is a multi-partner endeavor, implemented in three stages. Phase-1, Final Design and Project Development, will conclude with the preparation of construction and/or operating permits, feedstock production plans, and contracts ready for signature. Field trials of willow (Salix) have been initiated at several locations in New York (Tully, Lockport, King Ferry, La Fayette, Massena, and Himrod) and co-firing tests are underway at Greenidge Station (NYSEG) and Dunkirk Station (NMPC). Phase-II of the project will focus on scale-up of willow crop acreage, construction of co-firing facilities at Dunkirk Station (NMPC), and final modifications for Greenidge Station. Cofiring willow is also under consideration for GPU`s Seward Station where testing is under way. There will be an evaluation of the energy crop as part of the gasification trials occurring at BED`s McNeill power station. Phase-III will represent fullscale commercialization of the energy crop and power generation on a sustainable basis.
Date: August 1, 1997
Creator: Neuhauser, E.
Partner: UNT Libraries Government Documents Department

Co-firing High Sulfur Coal with Refuse Derived Fuels. Technical Progress Report {number_sign}11

Description: The objective of this quarter of study was to prepare fuel pellets containing PVC, newspaper and plastics to be co-fired with coal in the AFBC combustor. The Western Kentucky University atmospheric fluidized bed combustion system requires the fuel to fall from a bunker into a lock-hopper, and from there into a mixing box where the fuel is auger-fed under pressure into the bottom of the fluidized bed. The fuel must flow freely out of the bunker and through the lock- hopper for proper feeding into the combustor. In order for the fuel to continuously fall through these units and into the mixing box during combustion, the density of the fuel and the size of the particles must meet certain requirements. The particles must be no larger than 3/8 inches in diameter and must have a density approaching that of coal. Loose materials such as sawdust, shredded paper products and most shredded plastics do not feed properly in the WKU AFBC system. Bridging and blockage of feed chutes result, even with constant vibration of parts of the feed mechanism. It is not possible to run the AFBC system powered solely by these loose materials.
Date: May 31, 1997
Creator: Pan, Wei-Ping; Riley, John T. & Lloyd, William G.
Partner: UNT Libraries Government Documents Department

AFBC co-firing of coal and hospital waste. Fourth quarterly report, 1997

Description: The project objective is to design, construct, install, provide operator training and start-up a circulating fluidized bed combustion system at the Lebanon Pennsylvania Veteran`s Affairs Medical Center. This unit will co-fire coal and hospital waste providing lower cost steam for heating and possibly cooling (absorption chiller) and operation of a steam turbine-generator for limited power generation while providing efficient destruction of both general and infectious hospital waste. The steam generated is as follows: Steam =20,000 lb/hr; Temperature = 353 F (saturated); Pressure= 125 psig; Steam quality = 98.5%
Date: July 1, 1997
Partner: UNT Libraries Government Documents Department

AFBC co-firing of coal and hospital waste. Quarterly progress report, August 1--October 31, 1996

Description: The project objective is to design, construct, install, provide operator training and start-up a circulating fluidized bed combustion system at the Lebanon Pennsylvania Veteran`s Affairs Medical Center. This unit will co-fire coal and hospital waste providing lower cost steam for heating and possibly cooling (absorption chiller) and operation of a steam turbine-generator for limited power generation while providing efficient destruction of both general and infectious hospital waste. The steam generated as follows: (1) Steam = 20,000 lb/hr, (2) Temperature = 353 F (saturated), (3) Pressure = 125 psig, and (4) Steam quality = {approximately}98.5%.
Date: June 1, 1997
Partner: UNT Libraries Government Documents Department

BARRIER ISSUES TO THE UTILIZATION OF BIOMASS

Description: The Energy & Environmental Research Center (EERC) has completed a project to examine fundamental issues that could limit the use of biomass in small industrial steam/power systems in order to increase the future use of this valuable domestic resource. Specifically, the EERC attempted to elucidate the ash-related problems--grate clinkering and heat exchange surface fouling--associated with cofiring coal and biomass in grate-fired systems. Utilization of biomass in stoker boilers designed for coal can be a cause of concern for boiler operators. Boilers that were designed for low-volatile fuels with lower reactivities can experience problematic fouling when switched to higher-volatile and more reactive coal-biomass blends. Higher heat release rates at the grate can cause increased clinkering or slagging at the grate due to higher temperatures. Combustion and loss of volatile matter can start much earlier for biomass fuels compared to design fuel, vaporizing alkali and chlorides which then condense on rear walls and heat exchange tube banks in the convective pass of the stoker, causing noticeable increases in fouling. In addition, stoker-fired boilers that switch to biomass blends may encounter new chemical species such as potassium sulfates, various chlorides, and phosphates. These species in combination with different flue gas temperatures, because of changes in fuel heating value, can adversely affect ash deposition behavior. The goal of this project was to identify the primary ash mechanisms related to grate clinkering and heat exchange surface fouling associated with cofiring coal and biomass--specifically wood and agricultural residuals--in grate-fired systems, leading to future mitigation of these problems. The specific technical objectives of the project were: (1) Modification of an existing pilot-scale combustion system to simulate a grate-fired system. (2) Verification testing of the simulator. (3) Laboratory-scale testing and fuel characterization to determine ash formation and potential fouling mechanisms and to optimize activities in the modified pilot-scale ...
Date: September 1, 2002
Creator: Folkedahl, Bruce C.; Gunderson, Jay R.; Schmidt, Darren D.; Weber, Greg F. & Zygarlicke, Christopher J.
Partner: UNT Libraries Government Documents Department

DESIGNING AN OPPORTUNITY FUEL WITH BIOMASS AND TIRE-DERIVED FUEL FOR COFIRING AT WILLOW ISLAND GENERATING STATION AND COFIRING SAWDUST WITH COAL AT ALBRIGHT GENERATING STATION

Description: During the period April 1, 2003--June 30, 2003, Allegheny Energy Supply Co., LLC (Allegheny) proceeded with demonstration operations at the Willow Island Generating Station and improvements to the Albright Generating Station cofiring systems. The demonstration operations at Willow Island were designed to document integration of biomass cofiring into commercial operations. The Albright improvements were designed to increase the resource base for the projects, and to address issues that came up during the first year of operations. This report summarizes the activities associated with the Designer Opportunity Fuel program, and demonstrations at Willow Island and Albright Generating Stations.
Date: July 1, 2003
Creator: Payette, K. & Tillman, D.
Partner: UNT Libraries Government Documents Department

DESIGNING AN OPPORTUNITY FUEL WITH BIOMASS AND TIRE-DERIVED FUEL FOR COFIRING AT WILLOW ISLAND GENERATING STATION AND COFIRING SAWDUST WITH COAL AT ALBRIGHT GENERATING STATION

Description: During the period July 1, 2003-September 30, 2003, Allegheny Energy Supply Co., LLC (Allegheny) proceeded with demonstration operations at the Willow Island Generating Station and improvements to the Albright Generating Station cofiring systems. The demonstration operations at Willow Island were designed to document integration of bio mass cofiring into commercial operations, including evaluating new sources of biomass supply. The Albright improvements were designed to increase the resource base for the projects, and to address issues that came up during the first year of operations. During this period, a major presentation summarizing the program was presented at the Pittsburgh Coal Conference. This report summarizes the activities associated with the Designer Opportunity Fuel program, and demonstrations at Willow Island and Albright Generating Stations.
Date: October 1, 2003
Creator: Payette, K. & Tillman, D.
Partner: UNT Libraries Government Documents Department

DESIGNING AN OPPORTUNITY FUEL WITH BIOMASS AND TIRE-DERIVED FUEL FOR COFIRING AT WILLOW ISLAND GENERATING STATION AND COFIRING SAWDUST WITH COAL AT ALBRIGHT GENERATING STATION

Description: During the period January 1, 2003--March 31, 2003, Allegheny Energy Supply Co., LLC (Allegheny) proceeded with improvements to both the Willow Island and Albright Generating Station cofiring systems. These improvements were designed to increase the resource base for the projects, and to address issues that came up during the first year of operations. This report summarizes the activities associated with the Designer Opportunity Fuel program, and demonstrations at Willow Island and Albright Generating Stations.
Date: April 30, 2003
Creator: Payette, K. & Tillman, D.
Partner: UNT Libraries Government Documents Department

DESIGNING AN OPPORTUNITY FUEL WITH BIOMASS AND TIRE-DERIVED FUEL FOR COFIRING AT WILLOW ISLAND GENERATING STATION AND COFIRING SAWDUST WITH COAL AT ALBRIGHT GENERATING STATION

Description: During the period October 1, 2002--December 31, 2002, Allegheny Energy Supply Co., LLC (Allegheny) completed the first year of testing at the Willow Island cofiring project. This included data acquisition and analysis associated with certain operating parameters and environmental results. Over 2000 hours of cofiring operation were logged at Willow Island, and about 4,000 tons of sawdust were burned along with slightly more tire-derived fuel (TDF). The results were generally favorable. During this period, also, a new grinder was ordered for the Albright Generating Station to handle oversized material rejected by the disc screen. This report summarizes the activities associated with the Designer Opportunity Fuel program, and demonstrations at Willow Island and Albright Generating Stations. It details the test results at Willow Island and summarizes the grinder program at Albright.
Date: January 1, 2003
Creator: Payette, K. & Tillman, D.
Partner: UNT Libraries Government Documents Department

DESIGNING AN OPPORTUNITY FUEL WITH BIOMASS AND TIRE-DERIVED FUEL FOR COFIRING AT WILLOW ISLAND GENERATING STATION AND COFIRING SAWDUST WITH COAL AT ALBRIGHT GENERATING STATION

Description: During the period October 1, 2003-December 31, 2003, Allegheny Energy Supply Co., LLC (Allegheny) continued with demonstration operations at the Willow Island Generating Station and improvements to the Albright Generating Station cofiring systems. The demonstration operations at Willow Island were designed to document integration of biomass cofiring into commercial operations, including evaluating new sources of biomass supply. The Albright improvements were designed to increase the resource base for the projects, and to address issues that came up during the first year of operations. This report summarizes the activities associated with the Designer Opportunity Fuel program, and demonstrations at Willow Island and Albright Generating Stations.
Date: January 1, 2004
Creator: Payette, K. & Tillman, D.
Partner: UNT Libraries Government Documents Department

ENGINEERED PARTICULATES FOR CO-FIRING OF DIVERSE FEEDSTOCKS

Description: The goal of this project is to develop a novel methodology for the formation of engineered particulates of energy-relevant material. Specifically, we aim to control interparticle cohesion in such a way as to generate macro-particles or agglomerates of several differing types of primary particles in specific proportions such that they would be of utility for co-firing applications. In Phase I of this project, we used a combination of experimentation and simulation to validate theoretically derived mixing/segregation rules for cohesive granular materials in static systems, flowing systems, and gas-solid systems.
Date: March 1, 2004
Creator: McCarthy, Joseph J.; Jain, Kunal; Li, Hongming & Shi, Deliang
Partner: UNT Libraries Government Documents Department

Producing usable fuel from municipal solid waste

Description: Refuse disposal is a matter of increasing concern for municipalities and state governments. As existing land-fills become filled to capacity, and new landfills become more costly to site, it has become critical to develop alternative disposal methods. Some of the refuse that is presently being landfilled has the potential to provide considerable quantities of energy and thereby replace conventional fossil fuels. Another environmental concern is the problem of the emissions associated with combustion of traditional fossil fuels. The Clean Air Act Amendments of 1990 significantly restrict the level of sulfur dioxide (SO{sub 2}) and nitrogen oxides (NO{sub x}) emissions permissible as effluent from combustion facilities. To address both of these concerns, Argonne National Laboratory, under sponsorship of the U.S. Department of Energy (DOE), has developed a means of producing fuel from municipal solid waste that can be co-fired with coal to supplement coal supplies and reduce problematic emissions.
Date: March 1, 1995
Creator: Ohlsson, O.O.
Partner: UNT Libraries Government Documents Department

New Technology for America`s Electric Power Industry. Emissions reduction in gas turbines

Description: Argonne National Laboratory is examining alternatives to straight natural gas firing. Research has shown that the addition of certain catalytic agents, such as in hydrogen co-firing, shows promise. When hydrogen co-firing is used in tandem with steam injection, a decrease in both CO and NO{sub x} emissions has been observed. In-process hydrogen production and premixing with the natural gas fuel are also being explored.
Date: April 1, 1995
Partner: UNT Libraries Government Documents Department

CALLA ENERGY BIOMASS COFIRING PROJECT

Description: The Calla Energy Biomass Project, to be located in Estill County, Kentucky is to be conducted in two phases. The objective of Phase I is to evaluate the technical and economic feasibility of cofiring biomass-based gasification fuel-gas in a power generation boiler. Waste coal fines are to be evaluated as the cofired fuel. The project is based on the use of commercially available technology for feeding and gas cleanup that would be suitable for deployment in municipal, large industrial and utility applications. Define a combustion system for the biomass gasification-based fuel-gas capable of stable, low-NOx combustion over the full range of gaseous fuel mixtures, with low carbon monoxide emissions and turndown capabilities suitable for large-scale power generation applications. The objective for Phase II is to design, install and demonstrate the combined gasification and combustion system in a large-scale, long-term cofiring operation to promote acceptance and utilization of indirect biomass cofiring technology for large-scale power generation applications. During this Performance Period work efforts proceeded, and Carbona completed the gasifier island design package. Nexant has completed the balance of plant support systems design and the design for the biomass feed system. Work on the Technoeconomic Study is proceeding. Approximately 75% of the specified hardware quotations have been received at the end of the reporting period. A meeting is scheduled for July 23 rd and 24 th to review the preliminary cost estimates. GTI presented a status review update of the project at the DOE/NETL contractor's review meeting in Pittsburgh on June 21st.
Date: July 1, 2001
Partner: UNT Libraries Government Documents Department