COMPARISON OF BULK SHIELDING REACTOR CENTERLINE MEASUREMENTS IN WATER WITH PREDICTIONS

Description: Measurements of fast neutron and gamma ray dose rates in water along the centerline of the Bulk Shielding Reactor (BSR) are compared with predictions made by use of three available computer programs. It is found that the predictions are very dependent on the assumptions made concerning power distribution and that the more accurate descriptions of the source lead to predictions that agree with measurements to within 20% throughout thickness ranges as great as 100 centimeters of water. (auth)
Date: November 1, 1958
Creator: Casper, A.W.
Partner: UNT Libraries Government Documents Department
open access

Removal site evaluation report on the bulk shielding facility at Oak Ridge National Laboratory, Oak Ridge, Tennessee

Description: This removal site evaluation report on the Bulk Shielding Facility (BSF) at Oak Ridge National Laboratory was prepared to provide the Environmental Restoration Program with information necessary to evaluate whether hazardous and/or radiological contaminants in and around BSF buildings pose a substantial risk to human health or the environment (i.e., a high probability of adverse effects) and whether remedial site evaluations or removal actions are, therefore, required. A removal site evaluation… more
Date: September 1, 1996
Partner: UNT Libraries Government Documents Department
open access

Work plan for the High Ranking Facilities Deactivation Project at Oak Ridge National Laboratory, Oak Ridge, Tennessee

Description: The High Ranking Facilities Deactivation Project (HRFDP), commissioned by the US Department of Energy Nuclear Materials and Facility Stabilization Program, is to place four primary high-risk surplus facilities with 28 associated ancillary facilities at Oak Ridge National Laboratory in a safe, stable, and environmentally sound condition as rapidly and economically as possible. The facilities will be deactivated and left in a condition suitable for an extended period of minimized surveillance and… more
Date: March 1, 1996
Partner: UNT Libraries Government Documents Department
open access

ALUMINUM DETERMINATION IN REACTOR COOLING WATER

Description: ABS>A method for determination of submicrogram quantities of Al in reactor cooling water by neutron activation analysis is described. Data obtained in analyses of samples from the OKR and the Bulk Shielding Reactor are included. (J.R.0.)
Date: September 1, 1958
Creator: Emery, J.F. & Leddicotte, G.W.
Partner: UNT Libraries Government Documents Department
open access

Recent Developments in Magnet Design and Fabrication Procedures (BSR Type Magnets)

Description: The techniques of design and fabrication of red magnets for the Bulk Shielding Reactor II are presented. An experimental model, designed to eliminate the can and its associated air gap, is described. Data on magnet performance are included. (C.J.G.)
Date: July 1, 1960
Creator: Tallackson, J. R. & Santoro, R. T.
Partner: UNT Libraries Government Documents Department
open access

Bulk shielding facility quarterly report, April, May, and June of 1975

Description: The BSR operated at an average power level of 1,722 kw for 37.10 percent of the time during April, May, and June. Water-quality control in both the reactor primary and secondary cooling systems was satisfactory. The BSR was operated at low and variable power during this quarter for 91.566 hours as part of the training programs for nuclear engineering students from the University of Tennessee and Mississippi State University. The PCA was also used in the above- mentioned training programs and wa… more
Date: January 1, 1976
Creator: Hurt, S. S., III; Lance, E. D. & Thomas, J. R.
Partner: UNT Libraries Government Documents Department
open access

Bulk shielding facility quarterly report, January-March 1979

Description: The BSR was operated at an average power of 1,815 kW for 77.64% of the time this quarter. Water quality control in both the primary and secondary cooling systems was satisfactory. The PCA was operated 182.80 hours for the usual training activities involving university students and TVA personnel.
Date: September 1, 1979
Creator: Hurt, S.S.; Lance, E.D. & Howard, K.E.
Partner: UNT Libraries Government Documents Department
open access

Neutronics model of the bulk shielding reactor (BSR): validation by comparison of calculations with the experimental measurements

Description: A neutronics model for the Oak Ridge National Laboratory Bulk Shielding Reactor (ORNL-SAR) was developed and verified by experimental measurements. A cross-section library was generated from the 218 group Master Library using the AMPX Block Code system. A series of one-, two-, and three-dimensional neutronics calculations were performed utilizing both transport and diffusion theory. Spectral comparison was made with /sup 58/Ni(n,p) reaction. The results of the comparison between the calculation… more
Date: May 1, 1981
Creator: Johnson, J. O.; Miller, L. F. & Kam, F. B. K.
Partner: UNT Libraries Government Documents Department
open access

Bulk shielding facility quarterly report, January, February, and March 1981

Description: The BSR operated at an average power level of 1954 kW for 59.3% of the time during January, February, and March. Water-quality control in both the reactor primary and secondary cooling systems was satisfactory. The PCA was used in training programs and was operated on nine occasions. Nuclear engineering students from the University of Tennessee actively participated in training laboratories. The PCA was also operated on thirteen occasions for the Pressure Vessel Simulator Benchmark experiment.
Date: January 1, 1982
Creator: Hurt, S. S.; Lance, E. D. & Thomas, J. R.
Partner: UNT Libraries Government Documents Department
open access

Bulk shielding facility. Quarterly report, April, May, and June 1979

Description: The BSR operated at an average power level of 1967 kW for 72.58% of the time during April, May, and June. Water-quality control in both the reactor primary and secondary cooling systems was satisfactory. The BSR was operated at low and variable power during this quarter for 27.750 hours as part of the training programs for nuclear engineering students from the University of Tennessee. The PCA was also used in the above-mentioned training programs and was operated on one occasion when Mississipp… more
Date: January 1, 1980
Creator: Hurt, S. S.; Lance, E. D. & Thomas, J. R.
Partner: UNT Libraries Government Documents Department
open access

Bulk shielding facility quarterly report, July, August, and September 1980

Description: The Bulk Shielding Reactor (BSR) operated at an average power level of 1919 kW for 85.74% of the time during July, August, and September. Water-quality control in both the reactor primary and secondary cooling systems was satisfactory. The Pool Critical Assembly (PCA) was operated on three occasions for the Pressure Vessel Simulator Benchmark experiment.
Date: January 1, 1982
Creator: Hurt, S. S.; Lance, E. D. & Thomas, J. R.
Partner: UNT Libraries Government Documents Department
open access

National Low-Temperature Neutron Irradiation Facility (NLTNIF). The status of development

Description: In May 1983, the Department of Energy authorized the establishment of a National Low-Temperature Neutron Irradiation Facility (NLTNIF) at ORNL's Bulk Shielding Reactor (BSR). The NLTNIF, which will be available for qualified experiments at no cost to users, will provide a combination of high radiation intensities and special environmental and testing conditions that have not been previously available in the US. Since the DOE authorization, work has proceeded on the design and construction of th… more
Date: December 1, 1985
Creator: Coltman, R. R., Jr.; Kerchner, H. R.; Klabunde, C. E. & Young, F. W., Jr.
Partner: UNT Libraries Government Documents Department
open access

Bulk Shielding Facility quarterly report, April, May, and June 1981

Description: The BSR operated at an average power level of 1825 kW for 76.75% of the time during April, May, and June. Water-quality control in both the reactor primary and secondary cooling systems was satisfactory. The BSR was operated at low and variable power during this quarter for 45 hours as part of the training programs for nuclear engineering students from Mississippi State University and the University of Tennessee. The PCA was also used in the above mentioned training programs and was operated on… more
Date: January 1, 1982
Creator: Hurt, S. S., III; Lance, E. D. & Thomas, J. R.
Partner: UNT Libraries Government Documents Department
open access

Bulk Shielding Facility quarterly report, April--june 1978

Description: The BSR operated at an average power level of 1771 kW for 64.78 percent of the time during April, May, and June. Water-quality control in both the reactor primary and secondary cooling systems was satisfactory. The BSR was operated at low and variable power during this quarter for 52.684 hours as part of the training programs for nuclear engineering students from the University of Tennessee and Mississippi State University. The PCA was also used in the above-mentioned training programs and was … more
Date: November 1, 1978
Creator: Hurt, S. S., III; Lance, E. D. & Thomas, J. R.
Partner: UNT Libraries Government Documents Department
open access

Critical Experiments With Arrays of Orr and Bsr Fuel Elements

Description: Critical experiments were performed with ORR and BSR fuel elements to determine safe arrays in which the elements could be handled and stored. The data indicate that the optimum spacing for criticality of 168-g ORR elements in water is 0.2 in. between locating bosses annd that an infinite array of vertically placed elements onc element high would probably be subcritical with a 1 1/2-in. spacing between locating bosses. For uniform arrays of adjacent elements in water, variation in thc fuel load… more
Date: October 1, 1958
Creator: Fox, J. K. & Gilley, L. W.
Partner: UNT Libraries Government Documents Department
open access

CALCULATED REACTIVITY CHANGES PRODUCED BY THE OSCILLATION OF AN EPITHERMAL NEUTRON ABSORBER IN THE BULK SHIELDING REACTOR

Description: An attempt is made to ascertain the optimum working conditions of a pile oscillator and to compare this method with the danger coefficient technique from the point of view of minimum amount of resonance absorption which can be detected. The space-time behavior of the absorption properties of the sample is described by means of a delta -function and the reactor kinetic equations are obtained by using a single mode expansion of the flux. The results are applied to a bare reactor model equivalent … more
Date: April 1, 1960
Creator: Perez-Belles, R
Partner: UNT Libraries Government Documents Department
open access

Bulk Shielding Facility quarterly report, July, August, and September of 1976

Description: The BSR operated at an average power level of 1637 kW for 50.05 percent of the time during July, August, and September. Water-quality control in both the reactor primary and secondary cooling systems was satisfactory. The BSR was operated at low and variable power during this quarter for 27.327 hours as part of the training programs for nuclear reactor operator trainees from Memphis State University. The PCA was also used in the above-mentioned training programs and was operated on six occasion… more
Date: June 1, 1977
Creator: Hurt, S. S., III; Lance, E. D. & Thomas, J. R.
Partner: UNT Libraries Government Documents Department
open access

Safety analysis report for the National Low-Temperature Neutron Irradiation Facility (NLTNIF) at the ORNL Bulk Shielding Reactor (BSR)

Description: This report provides information concerning: the experiment facility; experiment assembly; instrumentation and controls; materials; radioactivity; shielding; thermodynamics; estimated or measured reactivity effects; procedures; hazards; and quality assurance. (JDB)
Date: June 1, 1986
Creator: Coltman, R. R., Jr.; Kerchner, H. R.; Klabunde, C. E. & Richardson, S. A.
Partner: UNT Libraries Government Documents Department