Gasbuggy 1973 production testing
Description:
The 1973 Gasbuggy production tests were designed to determine what, if any, changes have occurred in the producing characteristics of the Gasbuggy chimney over a four-year period. In May 1973, gas production from the GB-ER well was resumed. A rapid drawdown of the chimney pressure from 736 psig to about 250 psig was completed in 23 d. A total of 71.4 M/sup 2/ ft/sup 3/ of gas was produced and flared in this part of the test. Flow rates ranged from 4.9 to 1.8 M/sup 2/ ft/sup 3/d. The test contin…
more
Date:
January 1, 1973
Creator:
Chew, Eddie W. & Randolph, Philip L.
Partner:
UNT Libraries Government Documents Department