Search Results

Primary view of Effects of the Maximum Credible Accident Relevant to the Design of the Containment Shell, Experimental Low-Temperature Process Heat Reactor Project
unknown creator
March 21, 1960
Primary view of An Improved Nuclear Measuring Principle : Quarterly Progress Report No. 3 Covering the Period from December 1, 1959 to March 1, 1960
Burgwald, G. M. & Stone, C. A.
March 28, 1960
Primary view of An Experimental Gamma Irradiator for Hospital Sterilization
Frankfort, J. Harry; Haram, S. & Wallach, S.
March 7, 1960
Primary view of Design Studies on Cesium-137 as a Source for High Level Gamma Irradiators: Quarterly Progress Report Number 3, December 1959 - March 1960
Voyvodic, Louis
March 23, 1960
Primary view of Manual of Radiation Protection Standards
General Electric Company
March 1, 1960
Primary view of Summary of KER-1 operation, February 15, 1958--March 1, 1960
Buckner, C. L.
March 3, 1960
Primary view of Scope report Safety Circuit Trip Identification System
Deichman, J. L.
March 23, 1960
Primary view of Some considerations concerning the accuracy of power level calculations in the context of the control of SS materials
Stewart, K. B.
March 14, 1960
Primary view of Alpha correlation
Cremer, B. R.
March 24, 1960
Primary view of The poison spline system
Smithers, R. M.
March 10, 1960
Primary view of Hydraulic demand curves for standard BDF geometry at low tube powers
Waters, E. D. & Fitzsimmons, D. E.
March 24, 1960
Primary view of Fuels Preparation Department monthly report, February 1960
unknown creator
March 31, 1960
Primary view of Status report - C Reactor process tubes
Miller, N. R.
March 21, 1960
Primary view of Flux distribution problems at C Reactor
Chitwood, R. A.
March 16, 1960
Primary view of Resume of KER Loop irradiation tests for 1957, 1958, and 1959
Kratzer, W. K.
March 28, 1960
Primary view of Piping Changes for Increased Production at B, D, DR, F, C and H Reactors calculations
Bauer, G. H.; Harrison, C. W.; Hill, V. R.; McLenegan, D. W. & Mondt, J. F.
March 24, 1960
Primary view of Automatic alum feed device to produce water of any given clarity
Conley, W. R. & Pitman, R. W.
March 7, 1960
Primary view of Burst testing of irradiated Zircaloy tubing. Revision 1
Kahle, V. E.
March 4, 1960
Primary view of Evaluation of Irradiated OMRE Fuel Elements First Core Loading
Walter, J. H.; Leirich, J. F. & Calkins, G. D.
March 1, 1960
Primary view of An Advanced Sodium-Graphite Reactor Nuclear Power Plant
Churchill, J. R. & Renard, J.
March 15, 1960
Primary view of An assessment of the zirconium tube program -- C Reactor pilot demonstration installation
Amy, G. O.
March 18, 1960
Primary view of Travel to Oak Ridge and Savannah River Plant to Study Processing Plant Containment Philosophy. Trip Report, January 26--29, 1960
Beard, S. J. & Oberg, G. C.
March 9, 1960
Primary view of Hanford Operations Office monthly status and progress report, February 1960. Part 1
Travis, J. E.
March 11, 1960
Primary view of Thermal conductivity studies on various calcined ``cold`` waste: Interim report
DeMier, W. V.
March 11, 1960
Back to Top of Screen