Search Results

Primary view of The 0.22 Percent Across-the-Board Cut in FY2001 Appropriations
Keith, Robert
May 31, 2001
Primary view of 1 mil gold bond wire study.
Huff, Johnathon; McLean, Michael B.; Jenkins, Mark W. & Rutherford, Brian Milne
May 1, 2013
Primary view of The 3.8% Medicare Contribution Tax on Unearned Income, Including Real Estate Transactions
Keightley, Mark P.
May 18, 2012
Primary view of 3-D Ray-tracing and 2-D Fokker-Planck Simulations of Radiofrequency Application to Tokamak Plasmas
Cardinali, A.; Paoletti, F. & Bernabei, S.
May 1, 1999
Primary view of 7-GeV advanced photon source beamline initiative: Conceptual design report
unknown creator
May 1, 1993
Primary view of 7-GeV Advanced Photon Source Beamline Initiative. Conceptual Design Report
Argonne National Laboratory
May 1993
Primary view of LES 8/9 vibration test on a multihundred watt FSA
Anderson, C.G. & Brewer, C.O.
May 1, 1974
Primary view of 10 CFR 830 Major Modification Determination for Advanced Test Reactor LEU Fuel Conversion
Christensen, Boyd D.; Lehto, Michael A. & Duckwitz, Noel R.
May 1, 2012
Primary view of 10 CFR 830 Major Modification Determination for Advanced Test Reactor RDAS and LPCIS Replacement
Korns, David E.
May 1, 2012
Primary view of 10 CFR 830 Major Modification Determination for Emergency Firewater Injection System Replacement
Duckwitz, Noel
May 1, 2011
Primary view of 10 CFR 830 Major Modification Determination for Replacement of ATR Primary Coolant Pumps and Motors
Duckwitz, Noel
May 1, 2011
Primary view of 10 CFR 830 Major Modification Determination for the ATR Diesel Bus (E-3) and Switchgear Replacement
Duckwtiz, Noel
May 1, 2011
Primary view of 20% Wind Energy - Diversifying Our Energy Portfolio and Addressing Climate Change (Brochure)
unknown creator
May 1, 2008
Primary view of 25 Can Verification Report for the LLNL Plutonium Packaging System (PuPS)
Riley, D C & Dodson, K E
May 7, 2001
Primary view of 25 content of initial lots of Hanford UO{sub 3}
Work, J. B.
May 28, 1952
Primary view of The 25-Inch Liquid Hydrogen Bubble Chamber
Barrera, F.; Byrns, R. A.; Eckman, G. J.; Hernandez, H. P.; Norgren, D. U.; Shand, A. J. et al.
May 25, 1964
Primary view of 25 Process Assistance. For Period of May 2, 1955 to May 13, 1955
Culler, F L
May 23, 1955
Primary view of 26 - LMFBR flexible pipe joint development
Anderson, R.V.
May 1, 1978
Primary view of 30 Megawatt Heat Exchanger and Steam Generator for Sodium Cooled Reactor System: Volume 4, Operation and Maintenance Procedures
Alco Products (Firm)
May 15, 1962
Primary view of 35 Years of Water Policy: The 1973 National Water Commission and Present Challenges
Cody, Betsy A. & Carter, Nicole T.
May 11, 2009
Primary view of 40-Mw(e) Prototype High-Temperature Gas-Cooled Reactor Postconstruction Research and Development Program. Quarterly Progress Report for the Period Ending April 30, 1965
unknown creator
May 31, 1965
Primary view of 45-day safety screen results and final report for Tank 241-C-203, Auger samples 95 AUG-020 and 95-AUG-021
Conner, J.M.
May 18, 1995
Primary view of 45-Day safety screen results for Tank 241-B-112, auger samples 95-AUG-014 and 95-AUG-015
Conner, J.M.
May 1, 1995
Primary view of 45-Day safety screen results for Tank 241-C-101, auger sample 95-AUG-019
Sasaki, L.M.
May 11, 1995
Back to Top of Screen