Comparison of Optimum Natural Uranium Nuclear Power Plant and Optimum Enriched Uranium Nuclear Power Plant

Description: Report that "compares the designs of an optimum natural uranium power plant and an optimum partially enriched uranium power plant, both using CO2 as a coolant" (p. 1). Includes a description of each plant's design, construction, and economic considerations.
Date: August 1958
Creator: Kaiser Engineers
Partner: UNT Libraries Government Documents Department

Appendix to Preliminary Design 30,000 KW Prototype Partially Enriched Uranium, Gas Cooled, Graphite Moderated Nuclear Power Plant (Prototype for an Optimum Plant) for United States Atomic Energy Commission Idaho Operations Office Contract No. AT(10-1)-925

Description: Report containing outlines of operating procedures, costs, construction, safety analysis, studies, and design specifications of a 30,000 kilowatt prototype partially enriched uranium nuclear power plant.
Date: March 1959
Creator: Kaiser Engineers
Partner: UNT Libraries Government Documents Department

Preliminary Design 30,000 KW Prototype Partially Enriched Uranium, Gas Cooled, Graphite Moderated Nuclear Power Plant (Prototype of an Optimum Plant) for United States Atomic Energy Commission, Idaho Operations Office contract no. AT(10-1)-925

Description: Report containing the preliminary design for a nuclear reactor plant and its facilities. Includes a description of systems, safety procedures, costs, and a glossary.
Date: March 1959
Creator: Kaiser Engineers
Partner: UNT Libraries Government Documents Department

Source Strength Information for Shielding and Stack Effluent Calculations: a Standard Practices Guide

Description: Report presenting the curves and methods used "for determining gross fission product gamma energy in Mev/sec-watt, gross fission product beta decay in curies/sec-watt, delayed uranium fission neutrons in neutrons/sec-watt and N16 and N17 decay in photons/sec-cc of water" (p. 1).
Date: October 3, 1958
Creator: Jones, L. H.
Partner: UNT Libraries Government Documents Department

Standard Practices Guide for Writing Experimental Operating Manuals

Description: This is a sample operating manual designed to aid experimenters in writing operating manuals for MTR and ETR experiments. It contains what is felt to be the necessary information for operating a particular experiment. One of the main functions of an operating manual is to provide quick reference to material needed in an emergency. It is believed this type of manual provides the required information without an excessive amount of bulky, surplus material.
Date: December 15, 1958
Creator: Ford, J. D.
Partner: UNT Libraries Government Documents Department

ICPP Waste Calcining Facility : Safety Analysis Report

Description: Report documenting a study "made of the radiological hazards associated with operation of the ICPP Waste Calcination Facility" and contains "[d]etails of the safety analysis and extensive information on the process, equipment, and operation procedures" (p. iii). Each section has its own pagination.
Date: December 1, 1963
Creator: Lakey, L. T. & Bower, J. R.
Partner: UNT Libraries Government Documents Department

Feasibility Study, Optimum Natural Uranium, Gas Cooled, Graphite Moderated Nuclear Power Plant for United States Atomic Energy Commission, Idaho Operations Office

Description: Report containing "a discussion of the feasibility design and cost estimates for a gas cooled, natural uranium, graphite moderated power plant optimized for minimum power cost" (p. 3).
Date: April 1, 1958
Creator: ACF Industries Incorporated. Nuclear Products - ERCO Division.
Partner: UNT Libraries Government Documents Department

Supplement to Standard Practices for Design of MTR and ETR Safety Circuits

Description: Report that offers updated information from the Materials Testing Reactor (MTR) and Engineering Test Reactor (ETR) "experiment safety circuit manual by providing ETR power reduction curves and other information on ETR not yet available at the time the manual was issued, September 15, 1957" (p. 1).
Date: November 21, 1958
Creator: Jones, L. H.
Partner: UNT Libraries Government Documents Department

Pilot Plant Development Studies of a Continuous Process for Recovering Uranium from Nichrome Fuels

Description: Report documenting a process for recovering uranium from nichrome fuels (HTRE). This is accomplished by dissipating the fuel into a mixture of HCl-HNO3, stripping away chlorine ions with HN03, and recovering the uranium via tributyl phosphate solvent extraction.
Date: June 20, 1962
Creator: Chamberlain, H. V.
Partner: UNT Libraries Government Documents Department