Search Results

Advanced search parameters have been applied.
open access

Advanced Indirect Cycle Water Reactor Studies for Maritime Applications: Part 1. Cost Analysis and Future Development

Description: First part of the "final report of a study directed toward the evolution, design, and demonstration of the principle design features of interim indirect cycle water cooled and moderated nuclear power plants which will be useful in early cooperative programs between the Atomic Energy Commission and the United States maritime industry" (p. I-ii).
Date: April 1962
Creator: Combustion Engineering, inc. Nuclear Division.
Partner: UNT Libraries Government Documents Department
open access

Advanced Indirect Cycle Water Reactor Studies for Maritime Applications: Part 2. Plant Conceptual Studies

Description: Second part of the "final report of a study directed toward the evolution, design, and demonstration of the principle design features of interim indirect cycle water cooled and moderated nuclear power plants which will be useful in early cooperative programs between the Atomic Energy Commission and the United States maritime industry" (p. II-i).
Date: March 1962
Creator: Combustion Engineering, inc. Nuclear Division.
Partner: UNT Libraries Government Documents Department
open access

Advanced Indirect Cycle Water Reactor Studies for Maritime Applications: Part 3. Analog Simulation of Reactor Plant Transients

Description: Third part of the "final report of a study directed toward the evolution, design, and demonstration of the principle design features of interim indirect cycle water cooled and moderated nuclear power plants which will be useful in early cooperative programs between the Atomic Energy Commission and the United States maritime industry" (p. i).
Date: October 23, 1961
Creator: Combustion Engineering, inc. Nuclear Division.
Partner: UNT Libraries Government Documents Department
open access

Advanced Indirect Cycle Water Reactor Studies for Maritime Applications: Part 4. Steam Driven Coolant Pumps

Description: Fourth part of the "final report of a study directed toward the evolution, design, and demonstration of the principle design features of interim indirect cycle water cooled and moderated nuclear power plants which will be useful in early cooperative programs between the Atomic Energy Commission and the United States maritime industry" (p. i).
Date: October 23, 1961
Creator: Combustion Engineering, inc. Nuclear Division.
Partner: UNT Libraries Government Documents Department
open access

Advanced Indirect Cycle Water Reactor Studies for Maritime Applications: Part 5. Spiked Core Concept

Description: Fifth part of the "final report of a study directed toward the evolution, design, and demonstration of the principle design features of interim indirect cycle water cooled and moderated nuclear power plants which will be useful in early cooperative programs between the Atomic Energy Commission and the United States maritime industry" (p. i).
Date: October 23, 1961
Creator: Combustion Engineering, inc. Nuclear Division.
Partner: UNT Libraries Government Documents Department
open access

Liquid Metal Fast Breeder Reactor Design Study

Description: From introduction: "The primary objective of the present study was to develop a conceptual design of a large sodium cooled fast breeder reactor of a nominal electrical rating of 1000 Mw operating on the uranium-plutonium cycle."
Date: January 1964
Partner: UNT Libraries Government Documents Department
open access

The Development and Testing of UO2 Fuel Systems for Water Reactor Applications: Summary Report, July 1, 1961 - June 15, 1962

Description: From introduction: "The work described in this report represents the Joint United States - European Atomic Energy Community effort which is in keeping with the spirit of cooperation in contributing to the common good by the sharing of scientific and technical information and minimizing the duplication of effort by the limited pool of technical talent available in Western Europe and the United States."
Date: June 1962
Creator: Murtha, B. E. & Chernock, W. P.
Partner: UNT Libraries Government Documents Department
open access

Engineering Feasibility and Economics of CO2 Sequestration/Use on an Existing Coal-Fired Power Plant: A Literature Review

Description: The overall objective of this study is to evaluate the technical feasibility and the economics of alternate CO{sub 2} capture and sequestration/use technologies for retrofitting an existing pulverized coal-fired power plant. To accomplish this objective three alternative CO{sub 2} capture and sequestration systems will be evaluated to identify their impact on an existing boiler, associated boiler auxiliary components, overall plant operation and performance and power plant cost, including the c… more
Date: January 31, 2000
Creator: Bozzuto, Carl R. & Nsakala, Nsakala ya
Partner: UNT Libraries Government Documents Department
open access

American Electric Power's Conesville Power Plant Unit No. 5 CO2 Capture Retrofit Study

Description: ALSTOM Power Inc.'s Power Plant Laboratories (ALSTOM) has teamed with American Electric Power (AEP), ABB Lummus Global Inc. (ABB), the US Department of Energy National Energy Technology Laboratory (DOE NETL), and the Ohio Coal Development Office (OCDO) to conduct a comprehensive study evaluating the technical feasibility and economics of alternate CO{sub 2} capture and sequestration technologies applied to an existing US coal-fired electric generation power plant. The motivation for this study … more
Date: June 30, 2001
Creator: Bozzuto, Carl R.; Nsakala, Nsakala ya; Liljedahl, Gregory N.; Palkes, Mark & Marion, John L.
Partner: UNT Libraries Government Documents Department
open access

CE IGCC repowering project hot gas clean up system

Description: With sponsorship from the Department of Energy (DOE), and the state of Illinois, Combustion Engineering, Inc. is currently developing a design for a 60 Mw IGCC (Integrated Coal Gasification Combined Cycle) for City Water, Light & Power (CWL&P) in Springfield, Illinois. In addition, to DOE and the state of Illinois, Combustion Engineering, Inc. and CWL&P are contributing to the project. In order to obtain a high thermal efficiency, a hot gas cleanup system has been incorporated for product gas c… more
Date: September 1993
Partner: UNT Libraries Government Documents Department
open access

CE IGCC repowering project preliminary hazard analysis. Topical report, November 1, 1990--May 31, 1993

Description: A preliminary hazard analysis was conducted on the CE IGCC unit by representatives from ABB Lummus Crest Process Systems, Lummus Technical Division, Combustion Engineering, and Lummus Initial Operations. As a basis for the review, available technical data and documentation was used. Two areas of the unit were reviewed, the coal yard delivery system and the gasifier island. The coal yard consists of the coal delivery and handling systems, both of these systems are conventional. The gasifier isla… more
Date: June 1993
Creator: Peletz, L. J.
Partner: UNT Libraries Government Documents Department
open access

IGCC repowering project clean coal II project public design report. Annual report, October 1992--September 1993

Description: Combustion Engineering, Inc. (CE) is participating in a $270 million coal gasification combined cycle repowering project that was designed to provide a nominal 60 MW of electricity to City, Water, Light and Power (CWL&P) in Springfield, Illinois. The Integrated Gasification Combined Cycle (IGCC) system consists of CE`s air-blown entrained flow two-stage gasifier; an advanced hot gas cleanup system; a combustion turbine adapted to use low-BTU gas; and all necessary coal handling equipment, The p… more
Date: October 1993
Partner: UNT Libraries Government Documents Department
open access

CE IGCC repowering project: Materials for coal gasification environment. Topical report, June 1993

Description: A task to develop material requirements and a materials testing strategy was established with the Materials and Water Chemistry Department of the ABB Power plant Laboratories. This involved examining the requirements for each system under ABB CE scope. The basis for the material recommendations was largely based on in-house test programs under DOE contract and ABB CE experience. Consultants were utilized in a parallel task to assist in the design and material specification for the solids handli… more
Date: October 1993
Creator: Gibbons, T. B.; O`Neill, J. K.; Plumley, A. L.; Thibeault, P. R. & Waryasz, R. W.
Partner: UNT Libraries Government Documents Department
open access

CE IGCC repowering project: Bins and lockhoppers. Topical report, 1 January, 1992--28 February, 1993

Description: CE is participating in a coal gasification combined cycle repowering project that will provide a nominal 65 MW of electricity to City, Water, Light and Power (CWL and P) in Springfield, Illinois. The IGCC system will consist of CE`s air-blown pressurized entrained flow two-stage gasifier; an advanced hot gas cleanup system; a combustion turbine adapted to use low-btu gas; and all necessary coal handling equipment. The coal feed system will utilize a unique high pressure lockhopper system to all… more
Date: October 1993
Partner: UNT Libraries Government Documents Department
open access

CE IGCC repowering project: Controls & instrumentation. Topical report, June 1993

Description: The IGCC Control System is used to provide operator interface and controls for manual and auto operation of the IGCC Repowering Project Located at Springfield, Illinois. A Distributed Control System (DCS) is provided for analog (process control) loop functions and to provide the operator interface. A Data Acquisition System (DAS) is provided for gathering performance data and optimization. Programmable Logic Controllers will be provided for the following digital control systems: (a) GSSS (Gasif… more
Date: December 1993
Partner: UNT Libraries Government Documents Department
open access

CE IGCC repowering project: Clean Coal II Project. Annual report, 1 January, 1992--31 December, 1992

Description: CE is participating in a $270 million coal gasification combined cycle repowering project that will provide a nominal 60 MW of electricity to City, Water, light and Power (CWL and P) in Springfield, Illinois. The IGCC system will consist of CE`s air-blown entrained flow two-stage gasifier; an advanced hot gas cleanup system; a combustion turbine adapted to use low-Btu gas: and all necessary coal handling equipment. The project is currently in the second budget period of five. The major activiti… more
Date: December 1993
Partner: UNT Libraries Government Documents Department
open access

CE IGCC Repowering plant sulfuric acid plant. Topical report, June 1993

Description: A goal of the CE IGCC Repowering project is to demonstrate a hot gas clean-up system (HGCU), for the removal of sulfur from the product gas stream exiting the gasifier island. Combustion Engineering, Inc. (ABB CE) intends to use a HGCU developed by General Electric Environmental Services (GEESI). The original design of this system called for the installation of the HGCU, with a conventional cold gas clean-up system included as a full-load operational back-up. Each of these systems removes sulfu… more
Date: December 1993
Creator: Chester, A. M.
Partner: UNT Libraries Government Documents Department
open access

Combustion characterization of beneficiated coal-based fuels. Quarterly report No. 13, April--June 1992

Description: The Pittsburgh Energy Technology Center of the US Department of Energy has contracted with Combustion Engineering, Inc. (CE) to perform a five-year project on ``Combustion Characterization of Beneficiated Coal-Based Fuels.`` The beneficiated coals are produced by other contractors under the DOE Coal Preparation Program. Several contractor-developed advanced coal cleaning processes are run at pilot-scale cleaning facilities to produce 20-ton batches of fuels for shipment to CE`s laboratory in Wi… more
Date: September 1992
Creator: Chow, O. K. & Nsakala, N. Y.
Partner: UNT Libraries Government Documents Department
Back to Top of Screen