252 Matching Results

Search Results

Advanced search parameters have been applied.

Time Deployment Study for Annulus Pumping

Description: Radioactive wastes from processing irradiated uranium fuels have been stored as alkaline slurries in underground tanks at the Hanford Site. Single-shell tanks (SST) and double-shell tanks (DST) of various sizes were used for waste storage. Of the total 177 tanks, there are 28 DSTs. DSTs are located in AN, AP, AW, AY, AZ, and SY tank farms in the 200 East (200E) and 200-West (200W) Areas. The storage capacities of the DSTs vary from 980,000 to 1,140,000 gal. DSTs are designed and constructed as an integral steel structure, i.e., an inner shell within an outer shell, so that any leak from the inner shell is confined within the annulus without impacting the environment. The inner shell provides primary containment for the wastes and the outer shell provides secondary containment in the form of an annulus. The annulus of a DST is equipped with a pump pit, leak detection probes, and other accessories. The existing annulus pumps in the DSTs need to be revamped with a new system to reduce operating costs and reduce the time to deploy a pumping system. The new pumping system will minimize the likelihood of a release of waste into the environment; improve capability of waste removal to the maximum extent possible to comply with Washington Administrative Code (WAC) 173-303-640 and Code of Federal Regulations (CFR) 40 CFR 265.193. This study addresses the time required to deploy an annulus pumping system designed to fit any DST after detection of a leak in the inner shell of the DST.
Date: February 16, 2000
Creator: REBERGER, D.W.
Partner: UNT Libraries Government Documents Department

Waste Feed Delivery Transfer System Analysis

Description: This document provides a documented basis for the required design pressure rating and pump pressure capacity of the Hanford Site waste-transfer system in support of the waste feed delivery to the privatization contractor for vitrification. The scope of the analysis includes the 200 East Area double-shell tank waste transfer pipeline system and the associated transfer system pumps for a11 Phase 1B and Phase 2 waste transfers from AN, AP, AW, AY, and A2 Tank Farms.
Date: May 5, 2000
Creator: JULYK, L.J.
Partner: UNT Libraries Government Documents Department

Tank Bump Accident Potential and Consequences During Waste Retrieval

Description: This report provides an evaluation of Hanford tank bump accident potential and consequences during waste retrieval operations. The purpose of this report is to consider the best available new information to support recommendations for safety controls. A new tank bump accident analysis for safe storage (Epstein et al. 2000) is extended for this purpose. A tank bump is a postulated event in which gases, consisting mostly of water vapor, are suddenly emitted from the waste and cause tank headspace pressurization. Tank bump scenarios, physical models, and frequency and consequence methods are fully described in Epstein et al. (2000). The analysis scope is waste retrieval from double-shell tanks (DSTs) including operation of equipment such as mixer pumps and air lift circulators. The analysis considers physical mechanisms for tank bump to formulate criteria for bump potential during retrieval, application of the criteria to the DSTs, evaluation of bump frequency, and consequence analysis of a bump. The result of the consequence analysis is the mass of waste released from tanks; radiological dose is calculated using standard methods (Cowley et al. 2000).
Date: September 27, 2000
Creator: BRATZEL, D.R.
Partner: UNT Libraries Government Documents Department

Single Shell Tank (SST) Interim Stabilization Project Plan

Description: This project plan establishes the management framework for the conduct of the CHG Single-Shell Tank Interim Stabilization completion program. Specifically, this plan defines the mission needs and requirements; technical objectives and approach; organization structure, roles, responsibilities, and interfaces; and operational methods. This plan serves as the project executional baseline.
Date: May 22, 2000
Creator: VLADIMIROFF, D.T. & BOYLES, V.C.
Partner: UNT Libraries Government Documents Department

Project Execution Plan for Project W-211 Initial Tank Retrieval Systems (ITRS)

Description: This Project Execution Plan documents the methodology for managing Project W-211. Project W-211, Initial Tank Retrieval Systems (ITRS), is a fiscal year 1994 Major Systems Acquisition that will provide systems for retrieval of radioactive wastes from selected double-shell tanks (DST). The contents of these tanks are a combination of supernatant liquids and settled solids. To retrieve waste from the tanks, it is first necessary to mix the liquid and solids prior to transferring the slurry to alternative storage or treatment facilities. The ITRS will provide systems to mobilize the settled solids and transfer the wastes out of the tanks. In so doing, ITRS provides feed for the future waste treatment plant, allows for consolidation of tank solids to manage space within existing DST storage capacity, and supports continued safe storage of tank waste. The ITRS scope has been revised to include waste retrieval systems for tanks AP-102, AP-104, AN-102, AN-103, AN-104, AN-105, AY-102, AZ-102, and SY-102. This current tank selection and sequence provides retrieval systems supporting the River Protection Project (RF'P) Waste Treatment Facility and sustains the ability to provide final remediation of several watch list DSTs via treatment. The ITRS is configured to support changing program needs, as constrained by available budget, by maintaining the flexibility for exchanging tanks requiring mixer pump-based retrieval systems and shifting the retrieval sequence. Preliminary design was configured such that an adequate basis exists for initiating Title II design of a mixer pump-based retrieval system for any DST. This Project Execution Plan (PEP), derived from the predecessor Project Management Plan, documents the methodology for managing the ITRS, formalizes organizational responsibilities and interfaces, and identifies project requirements such as change control, design verification, systems engineering, and human factors engineering.
Date: April 19, 2000
Creator: Van Beek, J. E.
Partner: UNT Libraries Government Documents Department

Business System Planning Project System Requirements Specification

Description: The purpose of the Business Systems Planning Project System Requirements Specification (SRS) is to provide the outline and contents of the requirements for the CH2M HILL Hanford Group, Inc. (CHG) integrated business and technical information systems. The SRS will translate proposed objectives into the statement of the functions that are to be performed and data and information flows that they require. The requirements gathering methodology will use (1) facilitated group requirement sessions; (2) individual interviews; (3) surveys; and (4) document reviews. The requirements will be verified and validated through coordination of the technical requirement team and CHG Managers. The SRS document used the content and format specified in Lockheed Martin Services, Inc. Organization Standard Software Practices in conjunction with the Institute of Electrical and Electronics Engineers Standard 8340-1984 for Systems Requirements Documents.
Date: September 8, 2000
Creator: NELSON, R.E.
Partner: UNT Libraries Government Documents Department

Long Length Contaminated Equipment Retrieval System Receiver Trailer and Transport Trailer Operations and Maintenance Manual

Description: A system to accommodate the removal of long-length contaminated equipment (LLCE) from Hanford underground radioactive waste storage tanks was designed, procured, and demonstrated, via a project activity during the 1990s. The system is the Long Length Contaminated Equipment Removal System (LLCERS). LLCERS will be maintained and operated by Tank Farms Engineering and Operations organizations and other varied projects having a need for the system. The responsibility for the operation and maintenance of the LLCERS Receiver Trailer (RT) and Transport Trailer (TT) resides with the RPP Characterization Project Operations organization. The purpose of this document is to provide vendor supplied operating and maintenance (O & M) information for the RT and TT in a readily retrievable form. This information is provided this way instead of in a vendor information (VI) file to maintain configuration control of the operations baseline as described in RPP-6085, ''Configuration Management Plan for Long Length Contaminated Equipment Receiver and Transport Trailers''. Additional Operations Baseline documents are identified in RPP-6085.
Date: May 1, 2000
Creator: DALE, R.N.
Partner: UNT Libraries Government Documents Department

Operational Test Report (OTR) for U-103 Pumping and Instrumentation and Control (PIC) Skid

Description: Attached is the completed Operation Test Procedure (OTP-200-004, Rev. A-16). OTP includes a print out of the Programmable Logic Controller (PLC) Ladder Diagram. Ladder Diagram was designed for installation in the PLC used to monitor and control pumping activity for Tank Farm 241-U-103. The completed OTP and OTR are referenced in the 25 PIC Skid Configuration Drawing (H-2-829998).
Date: February 28, 2000
Creator: Koch, M. R.
Partner: UNT Libraries Government Documents Department

Lessons Learned and Present Day Challenges of Addressing 20th Century Radiation Legacies of Russia and the United States

Description: The decommissioning of nuclear submarines, disposal of highly-enriched uranium and weapons-grade plutonium, and processing of high-level radioactive wastes represent the most challenging issues facing the cleanup of 20th century radiation legacy wastes and facilities. The US and Russia are the two primary countries dealing with these challenges, because most of the world's fissile inventory is being processed and stored at multiple industrial sites and nuclear weapons production facilities in these countries.
Date: October 26, 2000
Creator: KRISTOFZSKI, J.G.
Partner: UNT Libraries Government Documents Department

Melter Disposal Strategic Planning Document

Description: This document describes the proposed strategy for disposal of spent and failed melters from the tank waste treatment plant to be built by the Office of River Protection at the Hanford site in Washington. It describes program management activities, disposal and transportation systems, leachate management, permitting, and safety authorization basis approvals needed to execute the strategy.
Date: September 25, 2000
Creator: BURBANK, D.A.
Partner: UNT Libraries Government Documents Department

Single Shell Tank (SST) Retrieval Sequence FY 2000 Update

Description: This document describes the baseline single-shell tank (SST) waste retrieval sequence for the River Protection Project (RPP) updated for Fiscal Year 2000. The SST retrieval sequence identifies the proposed retrieval order (sequence), the tank selection and prioritization rationale, and planned retrieval dates for Hanford SSTs. In addition, the tank selection criteria and reference retrieval method for this sequence are discussed.
Date: September 27, 2000
Creator: Garfield, J. S.
Partner: UNT Libraries Government Documents Department

Annual Progress Report on the Development of Waste Tank Leak Monitoring and Detection and Mitigation Activities in Support of M-45-08

Description: Milestone M-45-09E of the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement or TPA) [TPA 1996] requires submittal of an annual progress report on the development of waste tank leak detection, monitoring, and mitigation (LDMM) activities associated with the retrieval of waste from single-shell tanks (SSTs). This report details progress for fiscal year 2000, building on the current LDMM strategy and including discussion of technologies, applications, cost, schedule, and technical data. The report also includes discussion of demonstrations conducted and recommendations for additional testing. Tri-Party Agreement Milestones M-45-08A and M-45-08B required design and demonstration of LDMM systems for initial retrieval of SST waste. These specific milestones have recently been deleted as part of the M-45-00A change package. Future LDMM development work has been incorporated into specific technology demonstration milestones and SST waste retrieval milestones in the M-45-03 and M-45-05 milestone series.
Date: September 25, 2000
Creator: DEFIGH PRICE, C.
Partner: UNT Libraries Government Documents Department

Results of Vapor Space Monitoring of Flammable Gas Watch List Tanks

Description: This report documents the measurement of headspace gas concentrations and monitoring results from the Hanford tanks that have continuous flammable gas monitoring. The systems used to monitor the tanks are Standard Hydrogen Monitoring Systems. Further characterization of the tank off-gases was done with Gas Characterization systems and vapor grab samples. The background concentrations of all tanks are below the action level of 6250 ppm. Other information which can be derived from the measurements (such as generation rate, released rate, and ventilation rate) is also discussed.
Date: September 27, 2000
Creator: MCCAIN, D.J.
Partner: UNT Libraries Government Documents Department

Data Packages for the Hanford Immobilized Low Activity Tank Waste Performance Assessment 2001 Version [SEC 1 THRU 5]

Description: Data package supporting the 2001 Immobilized Low-Activity Waste Performance Analysis. Geology, hydrology, geochemistry, facility, waste form, and dosimetry data based on recent investigation are provided. Verification and benchmarking packages for selected software codes are provided.
Date: March 2, 2000
Creator: MANN, F.M.
Partner: UNT Libraries Government Documents Department