Feasibility study for alternate fuels production: unconventional natural gas from wastewater treatment plants. Volume II, Appendix D. Final report

Description: Data are presented from a study performed to determined the feasibility of recovering methane from sewage at a typical biological secondary wastewater treatment plant. Three tasks are involved: optimization of digester gas; digester gas scrubbing; and application to the East Bay Municipal Utility District water pollution control plant. Results indicate that excess digester gas can be used economically at the wastewater treatment plant and that distribution and scrubbing can be complex and costl… more
Date: December 1, 1981
Creator: Overly, P. & Tawiah, K.
Partner: UNT Libraries Government Documents Department
open access

Solar production of industrial process steam. Quarterly performance report, January 16, 1980-June 30, 1980

Description: A solar process steam system for gauze bleaching/sterilization utilizing 1065 m/sup 2/ Acurex Model 3001 line focusing parabolic trough concentrators is described. The system operates by circulating pressurized water through the collector field and then throttling it into a flash boiler. There the heated, pressurized water flashes to steam and flows into the plant steam main for distribution to various plant processes. Makeup water is supplied by the existing plant boiler feedwater system. The … more
Date: January 1, 1980
Partner: UNT Libraries Government Documents Department
open access

Solar production of industrial process steam. Phase III. Operation and evaluation of the Johnson and Johnson solar facility. Final report, January 1, 1980-March 31, 1981

Description: A solar facility that generates 177/sup 0/C (350/sup 0/F) process steam has been designed and constructed by Acurex Corporation and has operated for 1 yr supplying steam to the Johnson and Johnson manufacturing plant in Sherman, Texas. The facility consists of 1068 m/sup 2/ (11,520 ft/sup 2/) of parabolic trough concentrating collectors, a 18,900 1 (5000 gal) flash boiler, and an 18.6 kW (25 hp) circulating pump. In the first year of operation the system was available 97 percent of the days, an… more
Date: March 1, 1981
Creator: Brink, D. F.; Kendall, J. M. & Youngblood, S. B.
Partner: UNT Libraries Government Documents Department
open access

Solar production of industrial process hot water: operation and evaluation of the Campbell Soup hot water solar facility. Final report, September 1, 1979-December 10, 1980

Description: The operation and evaluation of a solar hot water facility designed by Acurex Corporation and installed (November 1977) at the Campbell Soup Company Sacramento, California canning plant is summarized. The period of evaluation was for 12 months from October 1979 through September 1980. The objective of the work was to obtain additional, long term data on the operation and performance of the facility. Minor modifications to the facility were completed. The system was operated for 15 months, and 1… more
Date: December 1, 1980
Creator: Kull, J. I.; Niemeyer, W. N. & Youngblood, S. B.
Partner: UNT Libraries Government Documents Department
open access

Advanced photovoltaic-trough development

Description: The scope of the work on photvoltaic troughs includes analytical studies, hardware development, and component testing. Various aspects of the system have been optimized and improvements have been realized, particularly in the receiver and reflecting surface designs. An empirical system performance model has been developed that closely agrees with measured system performance. This in-depth study of single-axis reflecting linear focus photovoltaic concentrators will be very beneficial in the deve… more
Date: April 1, 1982
Creator: Spencer, R.; Yasuda, K. & Merson, B.
Partner: UNT Libraries Government Documents Department