Search Results

Advanced search parameters have been applied.
open access

Materials for coal conversion and utilization

Description: The Sixth annual conference on materials for coal conversion and utilization was held October 13-15, 1981 at the National Bureau of Standards Gaithersburg, Maryland. It was sponsored by the US Department of Energy, the Electric Power Research Institute, the Gas Research Institute and the National Bureau of Standards. Fifty-eight papers from the proceedings have been entered individually into EDB and ERA; four papers had been entered previously from other sources. (LTN)
Date: January 1, 1981
Creator: None,
Partner: UNT Libraries Government Documents Department
open access

Operations managers conference: summary of proceedings

Description: The Association for Energy Systems, Operations, and Programming (AESOP) was created to provide Department of Energy (DOE) and DOE-contractor management personnel with a means for acquiring and exchanging information concerning effective management of ADP resources and personnel as well as a variety of computer applications. AESOP serves as a forum for the data processing management of more than 50 DOE offices and private corporations under contract to DOE. AESOP Operations Managers Conferences … more
Date: February 1, 1982
Creator: None,
Partner: UNT Libraries Government Documents Department
open access

Nuclear Regulatory Commission 1989 Information Digest

Description: The Nuclear Regulatory Commission 1989 Information Digest provides summary information regarding the US Nuclear Regulatory Commission, its regulatory responsibilities, and areas licensed by the Commission. This is the first of an annual publication for the general use of the NRC staff and is available to the public. The Digest is divided into two parts: the first presents an overview of the US Nuclear Regulatory Commission and the second provides data on NRC commercial nuclear reactor licensees… more
Date: March 1, 1989
Creator: None,
Partner: UNT Libraries Government Documents Department
open access

WIPP conceptual design report. Addendum L. Mine safety code review for Waste Isolation Pilot Plant (WIPP) conceptual design report

Description: The Federal Mine Safety Code, Part 57 of the Federal Metal and Nonmetallic Mine Safety Act, was studied as to its effects upon the design and operation of that portion of the waste Isolation Pilot Plant pertaining to mining. These standards are discussed on a point by point basis.
Date: June 1, 1977
Creator: None,
Partner: UNT Libraries Government Documents Department
open access

Quarterly progress report, process development, July--September 1975. Volume I

Description: Four of the six lots of continuously precipitated PETN produced last quarter were formulated into LX-13 and evaluated for firing performance and extrudability. Detonability was improved. Three of the lots fired satisfactorily on the DV blocks; however, extrudability was reduced. Three batches of PETN were formulated this quarter to further examine LX-13 extrudability and detonability.
Date: January 1, 1975
Creator: None,
Partner: UNT Libraries Government Documents Department
open access

Annual DOE active solar heating and cooling contractors' review meeting. Premeeting proceedings and project summaries

Description: Ninety-three project summaries are presented which discuss the following aspects of active solar heating and cooling: Rankine solar cooling systems; absorption solar cooling systems; desiccant solar cooling systems; solar heat pump systems; solar hot water systems; special projects (such as the National Solar Data Network, hybrid solar thermal/photovoltaic applications, and heat transfer and water migration in soils); administrative/management support; and solar collector, storage, controls, an… more
Date: September 1, 1981
Creator: None,
Partner: UNT Libraries Government Documents Department
open access

CH Packaging Operations Manual

Description: This document provides the user with instructions for assembling a payload. All the steps in Subsections 1.2, Preparing 55-Gallon Drum Payload Assembly; 1.3, Preparing "Short" 85-Gallon Drum Payload Assembly (TRUPACT-II and HalfPACT); 1.4, Preparing "Tall" 85-Gallon Drum Payload Assembly (HalfPACT only); 1.5, Preparing 100-Gallon Drum Payload Assembly; 1.6, Preparing Shielded Container Payload Assembly; 1.7, Preparing SWB Payload Assembly; and 1.8, Preparing TDOP Payload Assembly, must be comp… more
Date: May 27, 2009
Creator: None, None
Partner: UNT Libraries Government Documents Department
open access

Solar Total Energy System, Large Scale Experiment, Shenandoah, Georgia. Final technical progress report. Volume III. Appendix. [1. 72 MW thermal and 383. 6 kW electric power for 42,000 ft/sup 2/ knitwear plant]

Description: This is the appendix to the Stearns-Roger Engineering Company conceptual design report on ERDA's Large Scale Experiment No. 2 (LSE No. 2). The object of this LSE is to design, construct, test, evaluate and operate a STES for the purpose of obtaining experience with large scale hardware systems and to establish engineering capability for subsequent demonstration projects. This particular LSE is to be located at Shenandoah, Georgia, and will provide power to the Bleyle knitwear factory. Unde… more
Date: October 17, 1977
Creator: None,
Partner: UNT Libraries Government Documents Department
open access

Solar Total Energy System, Large Scale Experiment, Shenandoah, Georgia. Final technical progress report. Volume II, Section 3. Facility concept design. [1. 72 MW thermal and 383. 6 kW electric power for 42,000 ft/sup 2/ knitwear plant]

Description: The Stearns-Roger Engineering Company conceptual design of ERDA's Large Scale Experiment No. 2 (LSE No. 2) is presented. The various LSEs are part of ERDA's Solar Total Energy Program (STES) and a separate activity of the National Solar Thermal Power Systems Program. The object of this LSE is to design, construct, test, evaluate and operate a STES for the purpose of obtaining experience with large scale hardware systems and to establish engineering capability for subsequent demonstrat… more
Date: October 17, 1977
Creator: None,
Partner: UNT Libraries Government Documents Department
open access

Solar Total Energy System: Large Scale Experiment, Shenandoah, Georgia. Final technical progress report. Volume I. Section 1. Conclusions and recommendations. Section 2. Systems requirements. [1. 72-MW thermal and 383. 6-kW electric power for 42,000 ft/sup 2/ knitwear plant]

Description: The Stearns-Roger Engineering Company conceptual design of ERDA's Large Scale Experiment No. 2 (LSE No. 2) is described. The various LSE's are part of ERDA's Solar Total Energy Program (STES) and a separate activity of the National Solar Thermal Power Systems Program. The object of this LSE is to design, construct, test, evaluate and operate a STES for the purpose of obtaining experience with large scale hardware systems and to establish engineering capability for subsequent demo… more
Date: October 17, 1977
Creator: None,
Partner: UNT Libraries Government Documents Department
open access

Fort Hood Solar Total Energy Project. Volume II. Preliminary design. Part 1. System criteria and design description. Final report

Description: This volume documents the preliminary design developed for the Solar Total Energy System to be installed at Fort Hood, Texas. Current system, subsystem, and component designs are described and additional studies which support selection among significant design alternatives are presented. Overall system requirements which form the system design basis are presented. These include program objectives; performance and output load requirements; industrial, statutory, and regulatory standards; and sit… more
Date: January 1, 1979
Creator: None,
Partner: UNT Libraries Government Documents Department
open access

Fort Hood Solar Total Energy Project. Volume IV. Project Management Plan. Final report

Description: The Project Management Plan presented is designed to implement the definitive design phase of this project by establishing the organization, tasks, schedules, and controls to assure the accomplishment of project objectives within time and budgetary constraints. Specifically, the plan presents a functional organization composed of a team of personnel with proven experience and capability; clear and concise methods for evaluation and control of project activities and costs; and a set of procedure… more
Date: January 1, 1979
Creator: None,
Partner: UNT Libraries Government Documents Department
open access

Fort Hood solar total energy project. Technical support and systems integration. First semiannual report, May 1-October 31, 1978

Description: Progress on the design of a Solar Total Energy System which will supply a significant portion of the energy requirements of a troop housing complex at Fort Hood, Texas, is described. Selection and sizing of the distributed collector field are discussed, and parabolic trough collector technology is reviewed. Energy load measurements and insolation models for the Fort Hood site are described. Technical project support efforts are reviewed. (WHK)
Date: January 1, 1978
Creator: None,
Partner: UNT Libraries Government Documents Department
open access

Design and fabrication of a low cost Darrieus vertical axis wing turbine system. Phase I. Technical report

Description: The contract has two phases, a design phase and a fabrication and installation phase. Presented is the work completed in Phase I, the design phase. The Sandia 17 m was used as the background machine from which design information was drawn. By concentrating the modifications on an existing design, emphasis was focused on component cost reduction rather than selection of optimal configuration or operating modes. The resulting design is a stretched version of the Sandia 17 m preserving the same ro… more
Date: June 22, 1979
Creator: None,
Partner: UNT Libraries Government Documents Department
open access

Fort Hood Solar Total Energy Project. Volume II. Preliminary design. Part 2. System performance and supporting studies. Final report

Description: The preliminary design developed for the Solar Total Energy System to be installed at Fort Hood, Texas, is presented. System performance analysis and evaluation are described. Feedback of completed performance analyses on current system design and operating philosophy is discussed. The basic computer simulation techniques and assumptions are described and the resulting energy displacement analysis is presented. Supporting technical studies are presented. These include health and safety and reli… more
Date: January 1, 1979
Creator: None,
Partner: UNT Libraries Government Documents Department
open access

Eighth monthly technical status report, December 1-December 31, 1978

Description: Progress in all tasks is reviewed briefly. Charts which represent the monthly reports are included. The appendices include: a summary of additional needs, heat pump model description, heat pump model preliminary results, an interim report, and simplified methodologies. (MHR)
Date: January 20, 1979
Creator: None,
Partner: UNT Libraries Government Documents Department
open access

Solar total energy-large scale experiment, Shenandoah, Georgia site. Annual report, June 1977--June 1978. [For Bleyle Knitwear Plant]

Description: The site was described in terms of location, suitably, accessibility, and other factors. Detailed descriptions of the Solar Total Energy-Large Scale Experiment Application (STE-LSE) (Bleyle of America, Inc., Knitwear Plant), the DOE owned Meteorology Station operating at the site, and the instrumentation provided by the Georgia Power Company to measure energy usage within the knitwear plant are included. A detailed report of progress is given at the Shenandoah Site, introduced by the STE-LSE sc… more
Date: June 1, 1978
Creator: None,
Partner: UNT Libraries Government Documents Department
open access

Revised management plan, milestone plan, cost plan, and manpower plan. Sixth and seventh monthly status reports, October 1-November 30, 1978

Description: The following are included: project background and discussion, technical progress reports for all subtasks, contract management summary report, milestone schedule and status report, milestone log, cost plans, cost management reports, manpower plans, and manpower management reports. The following appendices are included: selection of heat pumps simulation locations, economic computations, fuel costs, system studies, recommended methodology for calculating residential load models, potential perfo… more
Date: January 1, 1978
Creator: None,
Partner: UNT Libraries Government Documents Department
open access

Fort Hood Solar Total Energy Project. Volume III. Engineering drawings. Final report

Description: Engineering drawings are presented for the Solar Total Energy System at Fort Hood, Texas. Drawings are given for the solar collector subsystem, power conversion subsystem, instrumentation and control subsystem, thermal storage subsystem, site preparation, thermal storage area piping and equipment layout, heating/cooling and domestic hot water subsystem, STES building and facility, and electrical distribution. (WHK)
Date: January 1, 1979
Creator: None,
Partner: UNT Libraries Government Documents Department
open access

Solar heating and cooling systems studies. Ninth monthly technical status report, 1 January--31 January 1979

Description: A description of a stand alone residential load model for TRNSYS and of the procedure used to validate the load model is presented. An investigation of the accuracy of pre-calculating building loads for later use in system simulations using the temperature level control heat pump model and the new load model is included. A description of output information which the models will produce and the control used for each system are given. The economic relationships used in a computer program which ca… more
Date: January 1, 1979
Creator: None,
Partner: UNT Libraries Government Documents Department
open access

CH Packaging Operations Manual

Description: This document provides the user with instructions for assembling a payload. All the steps in Subsections 1.2, Preparing 55-Gallon Drum Payload Assembly; 1.3, Preparing "Short" 85-Gallon Drum Payload Assembly (TRUPACT-II and HalfPACT); 1.4, Preparing "Tall" 85-gallon Drum Payload Assembly (HalfPACT only); 1.5, Preparing 100-Gallon Drum Payload Assembly; 1.6, Preparing SWB Payload Assembly; and 1.7, Preparing TDOP Payload Assembly, must be completed, but may be performed in any order as long as … more
Date: September 11, 2008
Creator: None, None
Partner: UNT Libraries Government Documents Department
Back to Top of Screen