Corrective Action Investigation Plan for Corrective Action Unit 321: Area 22 Weather Station Fuel Storage, Nevada Test Site, Nevada

Description: This Corrective Action Investigation Plan (CAIP) has been developed in accordance with the Federal Facility Agreement and Consent Order (FFACO) that was agreed to by the US Department of Energy, Nevada Operations Office (DOE/NV); the State of Nevada Division of Environmental Protection (NDEP); and the US Department of Defense (FFACO, 1996). The CAIP is a document that provides or references all of the specific information for investigation activities associated with Corrective Action Units (CAUs) or Corrective Action Sites (CASs). According to the FFACO (1996), CASs are sites potentially requiring corrective action(s) and may include solid waste management units or individual disposal or release sites. A CAU consists of one or more CASs grouped together based on geography, technical similarity, or agency responsibility for the purpose of determining corrective actions. This CAIP contains the environmental sample collection objectives and the criteria for conducting site investigation activities at the CAU 321 Area 22 Weather Station Fuel Storage, CAS 22-99-05 Fuel Storage Area. For purposes of this discussion, this site will be referred to as either CAU 321 or the Fuel Storage Area. The Fuel Storage Area is located in Area 22 of the Nevada Test Site (NTS). The NTS is approximately 105 kilometers (km) (65 miles [mi]) northwest of Las Vegas, Nevada (Figure 1-1) (DOE/NV, 1996a). The Fuel Storage Area (Figure 1-2) was used to store fuel and other petroleum products necessary for motorized operations at the historic Camp Desert Rock facility which was operational from 1951 to 1958 at the Nevada Test Site, Nevada. The site was dismantled after 1958 (DOE/NV, 1996a).
Date: January 28, 1999
Creator: United States. Department of Energy. Nevada Operations Office.
Partner: UNT Libraries Government Documents Department

Corrective Action Decision Document for Corrective Action Unit 240: Area 25 Vehicle Washdown, Nevada Test Site, Nevada

Description: This Corrective Action Decision Document identifies and rationalizes the U.S. Department of Energy, Nevada Operations Offices's selection of a recommended corrective action alternative (CAA) appropriate to facilitate the closure of Corrective Action Unit (CAU) 240: Area 25 Vehicle Washdown, Nevada Test Site, Nevada. This corrective action investigation was conducted in accordance with the Corrective Action Investigation Plan for CAU 240 as developed under the Federal Facility Agreement and Consent Order. Located in Area 25 at the Nevada Test Site in Nevada, CAU 240 is comprised of three Corrective Action Sites (CASs): 25-07-01, Vehicle Washdown Area (Propellant Pad); 25-07-02, Vehicle Washdown Area (F and J Roads Pad); and 25-07-03, Vehicle Washdown Station (RADSAFE Pad). In March 1999, the corrective action investigation was performed to detect and evaluate analyte concentrations against preliminary action levels (PALs) to determine contaminants of concern (COCs). There were no COCs identified at CAS 25-07-01 or CAS 25-07-03; therefore, there was no need for corrective action at these two CASs. At CAS 25-07-02, diesel-range organics and radionuclide concentrations in soil samples from F and J Roads Pad exceeded PALs. Based on this result, potential CAAs were identified and evaluated to ensure worker, public, and environmental protection against potential exposure to COCs in accordance with Nevada Administrative Code 445A. Following a review of potential exposure pathways, existing data, and future and current operations in Area 25, two CAAs were identified for CAU 240 (CAS 25-07-02): Alternative 1 - No Further Action and Alternative 2 - Clean Closure by Excavation and Disposal. Alternative 2 was identified as the preferred alternative. This alternative was judged to meet all requirements for the technical components evaluated, compliance with all applicable state and federal regulations for closure of the site, as well as minimizing potential future exposure pathways to the contaminated soils at the ...
Date: September 16, 1999
Creator: United States. Department of Energy. Nevada Operations Office.
Partner: UNT Libraries Government Documents Department

Record of Technical Change No.1 for Corrective Action Investigation Plan for CAU 486: Double Tracks RADSAFE Area, Nellis Air Force Range, Nevada

Description: Health Physics recommends that daily field screening levels be determined for gross gamma monitoring at the Double Tracks RADSAFE Area. This recommendation is predicated on the fact that there is significant daily variation in gross gamma detector response, even in the absence of a radiation source. Calculating daily field screening levels will help ensure the detection of radiation contamination in soil. The following sections of this memorandum discuss the radiation survey instruments that will be used during the characterization of the Double Tracks site, the anticipated radionuclides in the radiological source term, the survey instrument response to these radionuclides, the definition of the field screening levels, and recommendations on how to select the daily gross gamma field screening level.
Date: November 16, 2000
Partner: UNT Libraries Government Documents Department

Housekeeping Closure Report for Corrective Action Unit 463: Areas 2, 3, 9, and 25 Housekeeping Waste Sites, Nevada Test Site, Nevada

Description: The Federal Facility Agreement and Consent Order was entered into by the State of Nevada, U.S. Department of Energy, and U.S. Department of Defense to identify sites of potential historical contamination and implement corrective actions based on public health and environmental considerations. The facilities subject to this agreement include the Nevada Test Site (NTS), parts of the Tonopah Test Range, parts of the Nellis Air Force Range, the Central Nevada Test Area, and the Project Shoal Area. Corrective Action Sites (CASs) are areas potentially requiring corrective actions and may include solid waste management units, individual disposal, or release sites. Based on geography, technical similarity, agency responsibility, or other appropriate reasons, CASs are grouped together into Corrective Action Units (CAUs) for the purposes of determining corrective actions. This report contains the Closure Verification Forms for cleanup activities that were performed at 13 CASs within CAU 463 on the NTS. The Housekeeping Closure Verification Form for each CAS provides the location, directions to the site, general description, and photographs of the site before and after cleanup activities. Housekeeping activities at these sites included removal of debris (e.g., wooden pallets, metal, glass, and trash) and other material. In addition, these forms confirm prior removal of other contaminated materials such as metal drums or buckets, transformers, lead bricks, batteries, and gas cylinders. Based on these activities, no further action is required at these CASs.
Date: November 24, 1999
Creator: United States. Department of Energy. Nevada Operations Office.
Partner: UNT Libraries Government Documents Department

Record of Technical Change {number_sign}1 to ''Corrective Action Investigation Plan for Corrective Action Unit 261: Test Cell A Leachfield System, Nevada Test Site, Nevada,'' Revision 0, DOE/NV-519

Description: This Record of Technical Change provides updates to the technical information included in ''Corrective Action Investigation Plan for Corrective Action Unit 261: Test Cell A Leachfield System, Nevada Test Site, Nevada,'' DOE/NV--519.
Date: February 25, 2000
Creator: United States. Department of Energy. Nevada Operations Office.
Partner: UNT Libraries Government Documents Department

Amchitka Island, Alaska, Potential U.S. Department of Energy Site Responsibilities

Description: This historical records review report concerns the activities of the US Atomic Energy Commission (AEC) at Amchitka Island, Alaska, over a period extending from 1942 to 1993. The report focuses on AEC activities resulting in known or suspected contamination of the island environment by nonradiological hazardous or toxic materials as discerned through historical records. In addition, the information from historical records was augmented by an August 1998 sampling event. Both the records review and sampling were conducted by IT Corporation on behalf of the US Department of Energy (DOE), the predecessor agency to the AEC. The intent of this investigation was to identify all potentially contaminated sites for which DOE may be responsible, wholly or partially, including all official sites of concern as recognized by the US Fish and Wildlife Service (USFWS). Additionally, potential data gaps that the DOE will need to fill to support the ecological and human health risk assessments performed were identified. A review of the available historical information regarding AEC's activities on Amchitka Island indicates that the DOE is potentially responsible for 11 sites identified by USFWS and an additional 10 sites that are not included in the USFWS database of sites of potential concern.
Date: January 22, 1999
Creator: United States. Department of Energy. Nevada Operations Office.
Partner: UNT Libraries Government Documents Department

Corrective Action Decision Document/Closure Report for Corrective Action Unit 252: Area 25 Engine Test Stand 1 Decontamination Pad, Nevada Test Site, Nevada

Description: This Corrective Action Decision Document/Closure Report (CADD/CR) has been prepared for Corrective Action Unit (CAU) 252: Area 25 Engine Test Stand-1 Decontamination Pad, in accordance with the Federal Facility Agreement and Consent Order (FFACO). Located at the Nevada Test Site in Nevada, CAU 252 consists of only one Corrective Action Site (25-07-04, Decontamination Pad). This CADD/CR identifies and rationalizes the U.S. Department of Energy, Nevada Operations Office's (DOE/NV's) recommendation that no corrective action is deemed necessary at CAU 252. The Corrective Action Decision Document and Closure Report have been combined into one report because the potential contaminants of concern were either not detected during the corrective action investigation or were only present at naturally occurring concentrations. Based on the field results, neither corrective action or a corrective action plan is required at this site. A Notice of Completion to DOE/NV is being requested from the Nevada Division of Environmental Protection for closure of CAU 252, as well as a request that this site be moved from Appendix III to Appendix IV of the FFACO. Further, no use restrictions are required to be placed on this CAU.
Date: October 11, 2000
Creator: United States. Department of Energy. Nevada Operations Office.
Partner: UNT Libraries Government Documents Department

Corrective Action Decision Document for Corrective Action Unit 407: Roller Coaster RADSAFE Area, Tonopah Test Range, Nevada

Description: This Corrective Action Decision Document identifies and rationalizes the U.S. Department of Energy, Nevada Operations Office's selection of a recommended corrective action alternative (CAA) appropriate to facilitate the closure of Corrective Action Unit (CAU) 407, Roller Coaster RADSAFE Area (RCRSA), under the Federal Facility Agreement and Consent Order. Located on Tonopah Test Range (TTR), CAU 407 is located approximately 140 miles northwest of Las Vegas, Nevada, and five miles south of Area 3. The RCRSA was used during May and June of 1963 to decontaminate vehicles, equipment, and personnel from the Clean Slate tests. As a result of these operations, the surface and subsurface soils in the area have been impacted by plutonium and other contaminants of potential concern associated with decontamination activities. In June and July 1998, corrective action investigation activities were performed at CAU 407 (as outlined in the related Corrective Action Investigation Plan [CAIP]). The purpose of this investigation was to determine if any analytes were present at the site in concentrations above the preliminary action levels (PALs). The results indicated in the detection of plutonium above the PAL in samples taken from surface and subsurface soil within the exclusion zone, and uranium and americium detected above the PAL in samples taken from surface soil within the exclusion zone. No other COCs were identified above PALs specified in the CAIP. Based on this data, two corrective action objectives (CAOs) were defined: (1) to prevent or mitigate human exposure to surface and subsurface soil containing COCs, and (2) to prevent adverse impacts to groundwater quality. To accomplish these objectives, five CAAs were developed and evaluated. Based on the results of the detailed and comparative analysis of these alternatives, Alternative 3 (Partial Excavation, Disposal, and Administrative Controls With a Surface Cap) was chosen as the preferred alternative. This alternative ...
Date: September 24, 1999
Creator: United States. Department of Energy. Nevada Operations Office.
Partner: UNT Libraries Government Documents Department

Addendum to the Corrective Action Decision Document for Corrective Action Unit 254: Area 25 R-MAD Decontamination Facility, Nevada Test Site, Nevada (Rev. 0, December 2000)

Description: This document is an addendum to the Corrective Action Decision Document (CADD) that has been prepared for Corrective Action Unit (CAU) 254, Area 25 Reactor Maintenance, Assembly, and Disassembly (R-MAD) Decontamination Facility. CAU 254 consists of Corrective Action Site (CAS) 25-23-06, Decontamination Facility. The purpose of this addendum is to provide a rationale for the recommendation of a revised preferred alternative corrective action for CAU 254. This preferred alternative corrective action, Alternative 3, consists of the removal of accessible soil/sediment and all building material above ground level from the CAU 254 Site. This alternative is being recommended because a cost-effective technology is now available to dismantle the contaminated building and ensure complete removal of all CAU 254 CADD-identified contaminants of concern and any associated contamination. This preferred closure method alternative reduces the potential for future exposure pathways. Procedures will be developed, presented in the Corrective Action Plan, and implemented to ensure worker health and safety, protection of human health and the environment, and to meet all unrestricted release requirements in accordance with applicable state and federal regulations.
Date: December 12, 2000
Creator: United States. Department of Energy. Nevada Operations Office.
Partner: UNT Libraries Government Documents Department

Human Health and Ecological Risk Assessment Work Plan Mud Pit Release Sites, Amchitka Island, Alaska

Description: This Work Plan describes the approach that will be used to conduct human health and ecological risk assessments for Amchitka Island, Alaska, which was utilized as an underground nuclear test site between 1965 and 1971. During this period, the U.S. Atomic Energy Commission (now the U.S. Department of Energy) conducted two nuclear tests (known as Long Shot and Milrow) and assisted the U.S. Department of Defense with a third test (known as Cannikin). Amchitka Island is approximately 42 miles long and located 1,340 miles west-southwest of Anchorage, Alaska, in the western end of the Aleutian Island archipelago in a group of islands known as the Rat Islands. Historically including deep drilling operations required large volumes of drilling mud, a considerable amount of which was left on the island in exposed mud pits after testing was completed. Therefore, there is a need for drilling mud pit remediation and risk assessment of historical mud pit releases. The scope of this work plan is to document the environmental objectives and the proposed technical site investigation strategies that will be utilized for the site characterization of the constituents in soil, surface water, and sediment at these former testing sites. Its goal is the collection of data in sufficient quantity and quality to determine current site conditions, support a risk assessment for the site surfaces, and evaluate what further remedial action is required to achieve permanent closure of these three sites that will protect both human health and the environment. Suspected compounds of potential ecological concern for investigative analysis at these sites include diesel-range organics, polyaromatic hydrocarbons, polychlorinated biphenyls, volatile organic compounds, and chromium. The results of these characterizations and risk assessments will be used to evaluate corrective action alternatives to include no further action, the implementation of institutional controls, capping on site, or off-sit ...
Date: March 12, 2001
Creator: United States. Department of Energy. Nevada Operations Office.
Partner: UNT Libraries Government Documents Department

Corrective Action Decision Document/Closure Report for Corrective Action Unit 409: Other Waste Sites, Tonopah Test Range, Nevada (Rev. No.: 0, June 2001)

Description: This Corrective Action Decision Document/Closure Report (CADD/CR) has been prepared for Corrective Action Unit (CAU) 409: Other Waste Sites, Tonopah Test Range (TTR), Nevada, in accordance with the Federal Facility Agreement and Consent Order. Located near Area 3 on the TTR approximately 140 miles northwest of Las Vegas, Nevada, CAU 409 is comprised of three Corrective Action Sites (CASs): CAS RG-24-001-RGCR, Battery Dump Site; CAS TA-53-001-TAB2, Septic Sludge Disposal Pit (referred to as Septic Sludge Disposal Pit No.1); CAS TA-53-002-TAB2, Septic Sludge Disposal Pit (referred to as Septic Sludge Disposal Pit No.2). This CADD/CR identifies and rationalizes the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Operations Office's (NNSA/NV's) recommendation that no corrective action is deemed necessary for CAU 409. The CADD/CR have been combined into one report based on sample data collected during the field investigation performed in November 2000. Analysis of the data generated from these investigation activities indicates preliminary action levels were not exceeded for total volatile organic compounds, Toxicity Characteristic Leaching Procedure (TCLP) volatile organic compounds, total semivolatile organic compounds, TCLP semivolatile organic compounds, total Resource Conservation and Recovery Act (RCRA) metals (except arsenic), TCLP RCRA metals, polychlorinated biphenyls, total petroleum hydrocarbons as gasoline- and diesel-range organics, isotopic uranium, and gamma-emitting radionuclides (except thorium-234) for any of the soil samples collected. Concentrations of arsenic were detected above the preliminary action level in all samples; however, the concentrations are considered representative of ambient conditions at the site. Thorium-234 was tentatively identified in one sample; however, the concentration is considered no greater than background. The NNSA/NV's final determination is that CAU 409 shows no evidence of soil contamination at any of the associated CASs; therefore, the recommendation for no corrective action is justified.
Date: June 12, 2001
Creator: United States. Department of Energy. Nevada Operations Office.
Partner: UNT Libraries Government Documents Department

Corrective Action Investigation Plan for Corrective Action Unit 487: Thunderwell Site, Tonopah Test Range, Nevada (Rev. No.: 0, January 2001)

Description: This Corrective Action Investigation Plan contains the U.S. Department of Energy, Nevada Operations Office's (DOE/NV's) approach to collect the data necessary to evaluate corrective action alternatives (CAAs) appropriate for the closure of Corrective Action Unit (CAU) 487, Thunderwell Site, Tonopah Test Range (TTR), Nevada, under the Federal Facility Agreement and Consent Order. Corrective Action Unit 487 consists of a single Corrective Action Site (CAS), RG 26-001-RGRV, Thunderwell Site. The site is located in the northwest portion of the TTR, Nevada, approximately five miles northwest of the Area 3 Control Point and closest to the Cactus Flats broad basin. Historically, Sandia National Laboratories in New Mexico used CAU 487 in the early to mid-1960s for a series of high explosive tests detonated at the bottom of large cylindrical steel tubes. Historical photographs indicate that debris from these tests and subsequent operations may have been scattered and buried throughout the site. A March 2000 walk-over survey and a July 2000 geophysical survey indicated evidence of buried and surface debris in dirt mounds and areas throughout the site; however, a radiological drive-over survey also performed in July 2000 indicated that no radiological hazards were identified at this site. Based on site history, the scope of this plan is to resolve the problem statement identified during the Data Quality Objectives process that detonation activities at this CAU site may have resulted in the release of contaminants of concern into the surface/subsurface soil including total volatile and total semivolatile organic compounds, total Resource Conservation and Recovery Act metals, radionuclides, total petroleum hydrocarbons, and high explosives. Therefore, the scope of corrective action field investigation will involve excavation, drilling, and extensive soil sampling and analysis activities to determine the extent (if any) of both the lateral and vertical contamination and whether or not any such contamination extends ...
Date: January 2, 2001
Creator: United States. Department of Energy. Nevada Operations Office.
Partner: UNT Libraries Government Documents Department

Corrective Action Decision Document for Corrective Action Unit 321: Area 22 Weather Station Fuel Storage, Nevada Test Site, Nevada

Description: This Corrective Action Decision Document identifies and rationalizes the U.S. Department of Energy, Nevada Operations Office's selection of a recommended corrective action alternative appropriate to facilitate the closure of Corrective Action Unit (CAU) 321, Weather Station Fuel Storage, under the Federal Facility Agreement and Consent Order. Corrective Action Unit 321 is located at the Nevada Test Site (NTS) in Area 22, and consists of a single Corrective Action Site (CAS) 22-99-05, Fuel Storage Area. This CAS contains a fuel storage area approximately 325 by 540 feet, which was used to store fuel and other petroleum products necessary for motorized operations at the historical Camp Desert Rock facility, which was operational from 1951 to 1958. The corrective action investigation conducted in February 1999 found the only contaminant of concern above preliminary action levels to be total petroleum hydrocarbons as diesel-range organics at two sample locations. During this investigation, the two corrective action objectives identified were (1) to prevent or mitigate exposure to near-surface soil containing contaminants of concern, and (2) to prevent spread of contaminants of concern beyond the corrective action unit. Based on the corrective action objectives, the two corrective action alternatives developed for consideration were: Alternative 1 - No Further Action; and Alternative 2 - Clean Closure by Excavation and Disposal. The two alternatives were evaluated based on four general corrective action standards and five remedy selection decision factors, and the preferred corrective action alternative chosen on technical merit, focusing on performance, reliability, feasibility, and safety was Alternative 2. This alternative meets all applicable state and federal regulations for closure of the site and will eliminate potential future exposure pathways to the contaminated soils at the Weather Station Fuel Storage site.
Date: July 22, 1999
Creator: United States. Department of Energy. Nevada Operations Office.
Partner: UNT Libraries Government Documents Department

Corrective Action Decision Document for Corrective Action Unit 428: Area 3 Septic Waste Systems 1 and 5, Tonopah Test Range, Nevada

Description: This Corrective Action Decision Document identifies and rationalizes the US Department of Energy, Nevada Operations Office's selection of a recommended corrective action alternative (CAA) appropriate to facilitate the closure of Corrective Action Unit (CAU) 428, Septic Waste Systems 1 and 5, under the Federal Facility Agreement and Consent Order. Located in Area 3 at the Tonopah Test Range (TTR) in Nevada, CAU 428 is comprised of two Corrective Action Sites (CASs): (1) CAS 03-05-002-SW01, Septic Waste System 1 and (2) CAS 03-05-002- SW05, Septic Waste System 5. A corrective action investigation performed in 1999 detected analyte concentrations that exceeded preliminary action levels; specifically, contaminants of concern (COCs) included benzo(a) pyrene in a septic tank integrity sample associated with Septic Tank 33-1A of Septic Waste System 1, and arsenic in a soil sample associated with Septic Waste System 5. During this investigation, three Corrective Action Objectives (CAOs) were identified to prevent or mitigate exposure to contents of the septic tanks and distribution box, to subsurface soil containing COCs, and the spread of COCs beyond the CAU. Based on these CAOs, a review of existing data, future use, and current operations in Area 3 of the TTR, three CAAs were developed for consideration: Alternative 1 - No Further Action; Alternative 2 - Closure in Place with Administrative Controls; and Alternative 3 - Clean Closure by Excavation and Disposal. These alternatives were evaluated based on four general corrective action standards and five remedy selection decision factors. Based on the results of the evaluation, the preferred CAA was Alternative 3. This alternative meets all applicable state and federal regulations for closure of the site and will eliminate potential future exposure pathways to the contaminated soils at the Area 3 Septic Waste Systems 1 and 5.
Date: February 8, 2000
Creator: United States. Department of Energy. Nevada Operations Office.
Partner: UNT Libraries Government Documents Department

Site Characterization Work Plan for Gnome-Coach Site, New Mexico

Description: Project Gnome was the first nuclear experiment conducted under the U.S. Atomic Energy Commission (AEC), predecessor to the U.S. Department of Energy (DOE), Plowshare Program. Gnome was part of a joint government-industry experiment focused on developing nuclear devices exclusively for peaceful purposes. The intent of the Gnome experiment was to evaluate the effects of a nuclear detonation in a salt medium. Historically, Project Gnome consisted of a single detonation of a nuclear device on December 10, 1961. Since the Gnome detonation, the AEC/DOE has conducted surface restoration, site reconnaissance, and decontamination and decommissioning activities at the site. In addition, annual groundwater sampling is performed under a long-term hydrological monitoring program begun in 1980. Coach, an experiment to be located near the Gnome project, was initially scheduled for 1963. Although construction and rehabilitation were completed for Coach, the experiment was canceled and never executed. Known collectively as Project Gnome-Coach, the site is situated within the Salado Formation approximately 25 miles east of Carlsbad, New Mexico, in Eddy County, and is comprised of nearly 680 acres, of which 60 acres are disturbed from the combined AEC/DOE operations. The scope of this work plan is to document the environmental objectives and the proposed technical site investigation strategies that will be utilized for the site characterization of the project. The subsurface at the Gnome-Coach site has two contaminant sources that are fundamentally different in terms of both their stratigraphic location and release mechanism. The goal of this characterization is to collect data of sufficient quantity and quality to establish current site conditions and to use the data to identify and evaluate if further action is required to protect human health and the environment and achieve permanent closure of the site. The results of these activities will be presented in a subsequent corrective action decision ...
Date: February 13, 2001
Creator: United States. Department of Energy. Nevada Operations Office.
Partner: UNT Libraries Government Documents Department

Site Characterization Work Plan for Gasbuggy, New Mexico

Description: Project Gasbuggy was the first of three joint government-industry experiments conducted to test the effectiveness of nuclear explosives to fracture deeply buried, low-permeability natural gas reservoirs to stimulate production. The scope of this work plan is to document the environmental objectives and the proposed technical site investigation strategies that will be utilized for the site characterization of the Project Gasbuggy Site. Its goal is the collection of data in sufficient quantity and quality to determine current site conditions, support a risk assessment for the site surfaces, and evaluate if further remedial action is required to achieve permanent closure of the site that is both protective of human health and the environment. The Gasbuggy Site is located approximately 55 air miles east of Farmington, New Mexico, in Rio Arriba County within the Carson National Forest in the northeast portion of the San Juan Basin. Historically, Project Gasbuggy consisted of the joint government-industry detonation of a nuclear device on December 10, 1967, followed by reentry drilling and gas production testing and project evaluation activities in post-detonation operations from 1967 to 1976. Based on historical documentation, no chemical release sites other than the mud pits were identified; additionally, there was no material buried at the Gasbuggy Site other than drilling fluids and construction debris. Although previous characterization and restoration activities including sensitive species surveys, cultural resources surveys, surface geophysical surveys, and limited soil sampling and analysis were performed in 1978 and again in 2000, no formal closure of the site was achieved. Also, these efforts did not adequately address the site's potential for chemical contamination at the surface/shallow subsurface ground levels or the subsurface hazards for potential migration outside of the current site subsurface intrusion restrictions. Additional investigation activities will focus on the surface/shallow subsurface sampling and modeling. Suspected potential contaminants of concern ...
Date: December 14, 2000
Creator: United States. Department of Energy. Nevada Operations Office.
Partner: UNT Libraries Government Documents Department

Addendum to the Corrective Action Investigation Plan for Corrective Action Unit 321: Area 22 Weather Station Fuel Storage, Nevada Test Site, Nevada (Rev. 0, November 2000)

Description: This addendum to the Corrective Action Investigation Plan (CAIP) contains the U.S. Department of Energy, Nevada Operations Office's approach to determine the extent of contamination existing at Corrective Action Unit (CAU) 321. This addendum was required when the extent of contamination exceeded the estimate in the original Corrective Action Decision Document (CADD). Located in Area 22 on the Nevada Test Site, Corrective Action Unit 321, Weather Station Fuel Storage, consists of Corrective Action Site 22-99-05, Fuel Storage Area, was used to store fuel and other petroleum products necessary for motorized operations at the historic Camp Desert Rock facility. This facility was operational from 1951 to 1958 and dismantled after 1958. Based on site history and earlier investigation activities at CAU 321, the contaminant of potential concern (COPC) was previously identified as total petroleum hydrocarbons (diesel-range organics). The scope of this corrective action investigation for the Fuel Storage Area will include the selection of biased sample locations to determine the vertical and lateral extent of contamination, collection of soil samples using rotary sonic drilling techniques, and the utilization of field-screening methods to accurately determine the extent of COPC contamination. The results of this field investigation will support a defensible evaluation of corrective action alternatives and be included in the revised CADD.
Date: November 3, 2000
Creator: United States. Department of Energy. Nevada Operations Office.
Partner: UNT Libraries Government Documents Department

Corrective Action Decision Document for Corrective Action Unit 490: Station 44 Burn Area, Tonopah Test Range, Nevada (Rev. No.: 0, February 2001)

Description: This Corrective Action Decision Document identifies and rationalizes the U.S. Department of Energy, Nevada Operations Office's selection of a recommended Corrective Action Alternative (CAA) appropriate to facilitate the closure of Corrective Action Unit (CAU) 490, Station 44 Burn Area, Tonopah Test Range (TTR), Nevada, under the Federal Facility Agreement and Consent Order. Corrective Action Unit 490 is located on the Nellis Air Force Range and the Tonopah Test Range and is approximately 140 miles northwest of Las Vegas, Nevada. This CAU is comprised of four Corrective Action Sites (CASs): 03-56-001-03BA, Fire Training Area (located southwest of Area 3); RG-56-001-RGBA, Station 44 Burn Area (located west of Main Lake); 03-58-001-03FN, Sandia Service Yard (located north of the northwest corner of Area 3); and 09-54-001-09L2, Gun Propellant Burn Area (located south of the Area 9 Compound on the TTR). A Corrective Action Investigation was performed in July and August 2000, and analytes detected during the corrective action investigation were evaluated against preliminary action levels to determine contaminants of concern (COCs). There were no COCs identified in soil at the Gun Propellant Burn Area or the Station 44 Burn Area; therefore, there is no need for corrective actions at these two sites. Five soil samples at the Fire Training Area and seven at the Sandia Service Yard exceeded PALs for total petroleum hydrocarbons-diesel. Upon the identification of COCs specific to CAU 490, Corrective Action Objectives were developed based on a review of existing data, future use, and current operations at the TTR, with the following three CAAs under consideration: Alternative 1 - No Further Action, Alternative 2 - Closure In Place - No Further Action With Administrative Controls, and Alternative 3 - Clean Closure by Excavation and Disposal. These alternatives were evaluated based on four general corrective action standards and five remedy selection ...
Date: February 23, 2001
Creator: United States. Department of Energy. Nevada Operations Office.
Partner: UNT Libraries Government Documents Department

Record of Technical Change No.1 for ``Corrective Action Decision Document for Corrective Action Unit 240: Area 25 Vehicle Washdown, Nevada Test Site, Nevada''

Description: This Record of Technical Change provides updates to the technical information provided in ``Corrective Action Decision Document for Corrective Action Unit 240: Area 25 Vehicle Washdown, Nevada Test Site, Nevada.''
Date: November 1, 1999
Creator: United States. Department of Energy. Nevada Operations Office.
Partner: UNT Libraries Government Documents Department

Corrective Action Investigation Plan for Corrective Action Unit 143: Area 25 Contaminated Waste Dumps, Nevada Test Site, Nevada, Revision 1 (with Record of Technical Change No. 1 and 2)

Description: This plan contains the US Department of Energy, Nevada Operations Office's approach to collect the data necessary to evaluate correction action alternatives appropriate for the closure of Corrective Action Unit (CAU) 143 under the Federal Facility Agreement and Consent Order. Corrective Action Unit 143 consists of two waste dumps used for the disposal of solid radioactive wastes. Contaminated Waste Dump No.1 (CAS 25-23-09) was used for wastes generated at the Reactor Maintenance Assembly and Disassembly (R-MAD) Facility and Contaminated Waste Dump No.2 (CAS 25-23-03) was used for wastes generated at the Engine Maintenance Assembly and Disassembly (E-MAD) Facility. Both the R-MAD and E-MAD facilities are located in Area 25 of the Nevada Test Site. Based on site history, radionuclides are the primary constituent of concern and are located in these disposal areas; vertical and lateral migration of the radionuclides is unlikely; and if migration has occurred it will be limited to the soil beneath the Contaminated Waste Disposal Dumps. The proposed investigation will involve a combination of Cone Penetrometer Testing within and near the solid waste disposal dumps, field analysis for radionuclides and volatile organic compounds, as well as sample collection from the waste dumps and surrounding areas for off-site chemical, radiological, and geotechnical analyses. The results of this field investigation will support a defensible evaluation of corrective action alternatives in the corrective action decision document.
Date: June 28, 1999
Creator: United States. Department of Energy. Nevada Operations Office.
Partner: UNT Libraries Government Documents Department

Corrective Action Decision Document/Closure Report for Corrective Action Unit 232: Area 25 Sewage Lagoons, Nevada Test Site, Nevada

Description: This Corrective Action Decision Document/Closure Report (CADD/CR) has been prepared for Corrective Action Unit (CAU) 232, Area 25 Sewage Lagoons, in accordance with the Federal Facility Agreement and Consent Order. Located at the Nevada Test Site in Nevada, approximately 65 miles northwest of Las Vegas, CAU 232 is comprised of Corrective Action Site 25-03-01, Sewage Lagoon. This CADD/CR identifies and rationalizes the U.S. Department of Energy, Nevada Operations Office's (DOE/NV's) recommendation that no corrective action is deemed necessary for CAU 232. The Corrective Action Decision Document and Closure Report have been combined into one report because sample data collected during the July 1999 corrective action investigation (CAI) activities disclosed no evidence of contamination at the site. Contaminants of potential concern (COPCs) addressed during the CAI included total volatile organic compounds, total semivolatile organic compounds, total Resource Conservation and Recovery Act metals, total pesticides, total herbicides, total petroleum hydrocarbons (gasoline and diesel/oil range), polychlorinated biphenyls, isotopic uranium, isotopic plutonium, strontium-90, and gamma-emitting radionuclides. The data confirmed that none of the COPCs identified exceeded preliminary action levels outlined in the CAIP; therefore, no corrective actions were necessary for CAU 232. After the CAI, best management practice activities were completed and included installation of a fence and signs to limit access to the lagoons, cementing Manhole No. 2 and the diverter box, and closing off influent and effluent ends of the sewage lagoon piping. As a result of the CAI, the DOE/NV recommended that: (1) no further actions were required; (2) no Corrective Action Plan would be required; and (3) no use restrictions were required to be placed on the CAU.
Date: December 23, 1999
Creator: United States. Department of Energy. Nevada Operations Office.
Partner: UNT Libraries Government Documents Department

Corrective Action Decision Document/Closure Report for Corrective Action Unit 485: Cactus Spring Ranch Pu and DU Site, Tonopah Test Range, Nevada

Description: This Corrective Action Decision Document/Closure Report (CADD/CR) has been prepared for Corrective Action Unit (CAU) 485: Cactus Spring Ranch Plutonium (Pu) and Depleted Uranium (DU) Site, in accordance with the Federal Facility Agreement and Consent Order. Located at the Cactus Spring Ranch on the Tonopah Test Range, Nevada, CAU 485 consists of Corrective Action Site (CAS) TA-39-001-TAGR. This CADD/CR identifies and rationalizes the U.S. Department of Energy, Nevada Operations Office's recommendation that no corrective action is deemed necessary for CAU 485. The Corrective Action Decision Document and Closure Report have been combined into one report because sample data collected during the preliminary assessment investigation (PAI) performed in January and February 1998 showed no evidence of contamination at the site. In the past, this CAU included holding pens which housed sheep and burros used to test inhalation uptake from atmospheric releases of Pu and DU, and the animals were sacrificed after the tests. Specifically, the investigation focused on data to determine: if surface activities of alpha, beta, and gamma-emitting radionuclides were present; if potential contaminants of concern (COCs) such as Pu and DU were present; and if plutonium was present in the soil and dung at levels significantly above background levels. Investigation results concluded that surface radiological activities of alpha, beta, and gamma-emitting radionuclides were within range of typical background levels. Evaluation of process knowledge determined plutonium to be the only potential COC, but soil and dung samples tested were not positive for plutonium-238 and only two samples had positive concentrations of plutonium 239/240 (subsequent plutonium alpha spectroscopy results demonstrated that there was no plutonium contamination in the Cactus Spring surface soil or dung). Therefore, the DOE/NV recommended that no corrective action was required at CAU 485; further, no Corrective Action Plan was required. No use restrictions were required to be ...
Date: September 18, 1998
Creator: United States. Department of Energy. Nevada Operations Office.
Partner: UNT Libraries Government Documents Department

Record of Technical Change {number_sign}2 for ''Corrective Action Investigation Plan for Corrective Action Unit 240: Area 25 Vehicle Washdown, Nevada Test Site, Nevada,'' Revision 0, DOE/NV--532

Description: This Record of Technical Change updates the technical information provided in ''Corrective Action Investigation Plan for Corrective Action Unit 240: Area 25 Vehicle Washdown, Nevada Test Site, Nevada,'' revision 0, DOE/NV--532
Date: February 26, 2000
Creator: United States. Department of Energy. Nevada Operations Office.
Partner: UNT Libraries Government Documents Department

Corrective Action Investigation Plan for Corrective Action Unit 230: Area 22 Sewage Lagoons and Corrective Action Unit 320: Area 22 Desert Rock Airport Strainer Box, Nevada Test Site, Nevada

Description: This Corrective Action Investigation Plan contains the U.S. Department of Energy, Nevada Operation Office's approach to collect the data necessary to evaluate corrective action alternatives appropriate for the closure of Corrective Action Unit (CAU) 230/320 under the Federal Facility Agreement and Consent Order. Corrective Action Unit 230 consists of Corrective Action Site (CAS) 22-03-01, Sewage Lagoon; while CAU 320 consists of CAS 22-99-01, Strainer Box. These CAUs are referred to as CAU 230/320 or the Sewage Lagoons Site. The Sewage Lagoons Site also includes an Imhoff tank, sludge bed, and associated buried sewer piping. Located in Area 22, the site was used between 1951 to 1958 for disposal of sanitary sewage effluent from the historic Camp Desert Rock Facility at the Nevada Test Site in Nevada. Based on site history, the contaminants of potential concern include volatile organic compounds (VOCs), semivolatile organic compounds, total petroleum hydrocarbons (TPH), and radionuclides. Vertical migration is estimated to be less than 12 feet below ground surface, and lateral migration is limited to the soil immediately adjacent to or within areas of concern. The proposed investigation will involve a combination of field screening for VOCs and TPH using the direct-push method and excavation using a backhoe to gather soil samples for analysis. Gamma spectroscopy will also be conducted for waste management purposes. Sampling locations will be biased to suspected worst-case areas including the nearby sludge bed, sewage lagoon inlet(s) and outlet(s), disturbed soil surrounding the lagoons, surface drainage channel south of the lagoons, and the area near the Imhoff tank. The results of this field investigation will support a defensible evaluation of corrective action alternatives in the corrective action decision document.
Date: June 10, 1999
Creator: United States. Department of Energy. Nevada Operations Office.