Search Results

Advanced search parameters have been applied.
open access

Experimental Radiation Measurements in Conventional Structures: Part 1, Radiation Measurements in Two Two-Story and Three One-Story Typical Residential Structures Before and After Modification

Description: Report discussing the methods, data, and analysis of results for "An experimental study designed to provide a basis for estimating protection against fallout radiation " (p. v) using one- and two-story structures with basements.
Date: July 1966
Creator: Burson, Z. G.
Partner: UNT Libraries Government Documents Department
open access

Final Report: Investigation of Boiling Flow Regimes and Critical Heat Flux

Description: From abstract: A program to investigate the mechanism of the critical heat flux condition from the standpoint of flow regimes has been initiated at Dynatech for the AEC. This report covers the work done on this investigation in the first year.
Date: March 1, 1965
Creator: Suo, M.; Bergles, Arthur E.; Doyle, Edward F.; Clawson, L. & Goldberg, P.
Partner: UNT Libraries Government Documents Department
open access

Flow Stability of Gas-Solids Suspensions: Final Report

Description: From abstract: One of the principal purposes of the work reported was to study the stability of gas-solids suspensions in the presence of a thermal gradient. Previously reported experience with unstable suspensions is summarized.
Date: February 1964
Creator: Wachtell, G. P. & Waggener, J. P.
Partner: UNT Libraries Government Documents Department
open access

Radioactive Manganese Occurrences in the Lower Rio Itapicurú Valley, Bahia, Brazil

Description: From abstract: Radioactive manganese deposits have been found in two swamps and at one locality on the northeast bank of the Rio Itapicuru near Mosquete, municipio of Itapicuru, State of Bahia, Brazil. The occurrences are related to warm springs and consist of surficial manganiferous sinter and of sandstone impregnated with manganese.
Date: April 1958
Creator: Haynes, Donald D.; Mau, Henry & White, Max Gregg
Partner: UNT Libraries Government Documents Department
open access

Final Safety Analysis: Ten-Watt Strontium-90 Fueled Generator for an Unattended Meteorological Station, SNAP-7C

Description: From introduction: The primary objectives in designing a nuclear safe radiostrontium generator are: continuous absolute containment of the radiostrontium fuel, which is a relatively insoluble and chemically stable fuel compound, and biological shielding of the direct radiation from the heat source. This report evaluates the safety aspects of a prototype Strontium-90 fueled generator which will be utilized by the U.S. Navy to power and unattended automatic meterological station.
Date: 1962
Creator: Brooks, Phillip M. & Keegan, James J.
Partner: UNT Libraries Government Documents Department
open access

SNAP Programs Quarterly Progress Report, Task 8--Stontium-90 Fuled Thermoelectric Generator Development: Number 6, February 1, 1962-April 30, 1962

Description: From introduction and summary: The prime effort on this contract has been directed toward: Manufacture, assembly and test of the 60-watt thermo-electric generators, procurement of SNAP-7D system components, installation and checkout of the Strontium-90 isotope process equipment.
Date: 1962
Creator: McDonald, W. A. & Kershaw, W. L.
Partner: UNT Libraries Government Documents Department
open access

ANPP Code Development Program: An Experimental Program on Water-Moderated Arrays of Uranium and Stainless Steel

Description: From summary: This report describes an experimental study performed on critical arrays of water-moderated, flat plate, laminated fuel bundles. The experiments were performed in support of analytical studies undertaken in the ANPP Code Development Program. The fuel bundles were built up using fully enriched uranium metal foils, stainless steel plates and boron stainless steel plates.
Date: May 1962
Creator: Welshans, L.
Partner: UNT Libraries Government Documents Department
open access

SNAP Programs Quarterly Progress Report, Task 8--Stontium-90 Fuled Thermoelectric Generator Development: Number 7, May 1, 1962-July 31, 1962

Description: From introduction and summary: The effort in this area (Task 8 portion of contract) has been confined to operating the reliability model. There have been fluctuations in output power that can be attributed to variations in the operating parameters, plus an increase in the internal resistance.
Date: 1962
Creator: McDonald, W. A.
Partner: UNT Libraries Government Documents Department
open access

PM Research and Development Task 1.0 : Core 2 Final Design Report

Description: From summary: This report describes the final design of Core 2, which is being developed primarily as a replacement core for the PM-1 and PM-3A nuclear power plants. In addition, the thermal and hydraulic capabilities were investigated; these indicate applicability of the core to higher powered PM-type plants.
Date: April 1963
Creator: Russo, F.; Brittain, W.; Lightner, R. & Baer, R.
Partner: UNT Libraries Government Documents Department
open access

PM-1 Reactor Core Final Design Report

Description: From introduction: This report presents and evaluates the final design of the reactor core for the PM-1 Nuclear Power Plant. The design criteria required a pressurized water cooled and moderated core with a two-year life at design power and a positive shutdown margin under all conditions with either one control rod stuck completely out or with two control rods stuck in the operating condition.
Date: January 1962
Creator: Bagley, R. O.; Cox, F. H.; Carnasale, A. & Vener, H.
Partner: UNT Libraries Government Documents Department
open access

Final Safety Analysis: Ten-Watt Strontium-90 Fueled Generator for an Unattended Light Buoy, SNAP-7A

Description: From introduction: A prototype Strontium-90 fueled generator will be used to fulfill the power requirements of an unattended automatic light buoy...Primary objectives are to provide continuous absolute containment of the radiostrontium fuel...and biological shielding of the direct radiation from the heat source.
Date: February 1962
Creator: Brooks, Phillip M. & Keegan, James J.
Partner: UNT Libraries Government Documents Department
open access

PM-1 Nuclear Power Plant Program: 3rd Quarterly Progress Report, September 1, 1959-November 30, 1959

Description: From abstract: The principal efforts are the furthering of the final design and preparation of specifications for some long-lead components. The entire power plant has been divided, for final design purposes, into 37 subsystems. The status of work on each subsystem at the close of the period is reported.
Date: March 1960
Creator: Martin Company. Nuclear Division.
Partner: UNT Libraries Government Documents Department
open access

Evaluation of Beta Radiation as a Hydrogenation Catalyst: Interim Technical Status Report for the Period March 1, 1962 to October 31, 1963

Description: From abstract: The concept of using high intensity beta radiation from an isotopic source, Sr-90, inside a high temperature, high pressure chemical reactor has been developed for potential radiation chemical processes. Distinct advantages include high utilizable intensity from a relatively small source with a minimum of shielding against external radiation.
Date: September 11, 1964
Creator: Yavorsky, P. M. & Gorin, E.
Partner: UNT Libraries Government Documents Department
open access

PM-1 Nuclear Power Plant Program: Plant Performance Studies, Final Periodic Report, September 1, 1962 to December 31, 1962

Description: From abstract: Data obtained during the performance testing of the PM-1 plant was compiled and evaluated. It is concluded from the data that the plant performance in general meets or exceeds specifications. Transient and steady-state electrical fluctuations are well within specified limitations. Heat balance data for both the primary and secondary systems agree reasonably well with design predictions. Radiation levels are below those anticipated.
Date: April 1963
Partner: UNT Libraries Government Documents Department
open access

PM-1 Nuclear Power Plant Program: 5th Quarterly Progress Report, March 1, 1960-May 31, 1960

Description: From abstract: Reactor development work includes: initiation of the flexible zero-power test (PMZ-1) experimental program, fabrication and delivery of a PM-1 type fuel element, continuation of reactor flow and heat transfer tests, development work on rare earth control rods, and testing and redesign of the prototype magnetic jack-type control rod actuator.
Date: July 5, 1960
Creator: Martin Company. Nuclear Division.
Partner: UNT Libraries Government Documents Department
open access

PM-1 Nuclear Power Plant Program: Final Progress Report, September 1, 1962 Through Completion

Description: From abstract: The principal efforts during the final period were concerned with plant testing, modifications to the plant to enable it to produce full design load at high ambient temperatures, the compilation and evaluation of plant performance data, preparation of documents and transfer of the plant to the AEC and final resolution of all outstanding contract scope items.
Date: July 15, 1963
Partner: UNT Libraries Government Documents Department
open access

SNAP Programs Quarterly Progress Report, Task 8--Stontium-90 Fuled Thermoelectric Generator Development: Number 1, November 1, 1960-January 31, 1961

Description: From summary: The SNAP 7 program is being conducted for the purpose of developing four radioisotope-fueled thermo-electric power generation systems. An important phase of this program is the processing of Strontium-90 into heat sources for these systems. The current effort involves the design and engineering analysis of two of the four thermo-electric generators.
Date: June 1961
Partner: UNT Libraries Government Documents Department
open access

PM Research and Development Program: 1st Quarterly Progress Report, April 15, 1961 to June 30, 1961

Description: From summary: This report contains a description of the work accomplished during the first project quarter of the PM Research and Development Program, divided into six areas: core design development, plant design development, fuel element and core component development, critical experiments and zero power testing, reactor flow rates, and heat transfer tests.
Date: March 1962
Creator: Baer, R. L.
Partner: UNT Libraries Government Documents Department
open access

SNAP Programs Quarterly Progress Report, Task 8--Stontium-90 Fuled Thermoelectric Generator Development: Number 5, November 1, 1961-January 31, 1962

Description: From introduction and summary: The SNAP 7 program is being conducted by the Martin Company for the purpose of developing four radioisotope-fueled thermo-electric power generation systems. The current program in its entirety covers: design, fabrication, test and delivery of four-radioisotope-fueled thermo-electric generator systems are to be designed to meet the rigorous environmental requirements of field use by the U.S. Coast Guard and the U.S. Navy.
Date: 1962
Creator: McDonald, W. A. & Kershaw, W. L.
Partner: UNT Libraries Government Documents Department
open access

PM-1 Nuclear Power Plant Program: 4th Quarterly Progress Report, December 1, 1959-February 29, 1960

Description: From abstract: The principal efforts during the fourth project quarter were the near-completion of the final design and preparation of specifications for plant components. Reactor development work included final preparations for the flexible zero-power test (PMZ-1) program and revised fuel element irradiation test program, continuation of reactor flow test, further work on heat transfer test program, and final design and fabrication of the prototype magnetic jack-type control rod actuators.
Date: April 5, 1960
Creator: Martin Company. Nuclear Division.
Partner: UNT Libraries Government Documents Department
open access

Rotating Machinery for Gas-Cooled Reactor Application

Description: From foreword: Representatives from various organizations met to discuss progress in the development of rotating machinery for gas-cooled reactors. The equipment covered included main blowers, shaft seals, gas turbines, gas bearing compressors, and other types of special compressors for reactor or experimental applications.
Date: June 1962
Partner: UNT Libraries Government Documents Department
Back to Top of Screen