C-tank transfers: Transuranic sludge removal from the C-1, C-2, and W-23 waste storage tanks at Oak Ridge National Laboratory, Oak Ridge, Tennessee

Description: Two fluidic pulse jet mixing systems were used to successfully mobilize remote-handled transuranic sludge for retrieval from three 50,000-gal horizontal waste storage tanks at Oak Ridge National Laboratory (ORNL). The results of this operation indicate that the pulse jet system should be considered for mixing and bulk retrieval of sludges in other vertical and horizontal waste tanks at ORNL and at other U.S. Department of Energy sites.
Date: May 1999
Creator: Dahl, T. L.; Lay, A. C.; Taylor, S. A. & Moore, J. W.
Partner: UNT Libraries Government Documents Department
open access

Deployment of a fluidic pulse jet mixing system for horizontal waste storage tanks at Oak Ridge National Laboratory, Oak Ridge, Tennessee

Description: A fluidic pulse jet mixing system, designed and fabricated by AEA Technology, was successfully demonstrated for mobilization of remote-handled transuranic (RH-TRU) sludge for retrieval from three 50,000-gal horizontal waste storage tanks (W-21, W-22, and W-23) at Oak Ridge National Laboratory (ORNL). The pulse jet system is unique because it does not contain any moving parts except for some solenoid valves which can be easily replaced if necessary. The pulse jet system consisted of seven modula… more
Date: August 1, 1998
Creator: Kent, T. E.; Hylton, T. D.; Taylor, S. A. & Moore, J. W.
Partner: UNT Libraries Government Documents Department
open access

Demonstration of fluidic pulse jet mixing for a horizontal waste storage tank

Description: A fluidic pulse jet mixing system, designed and fabricated by AEA Technology of the United Kingdom, was successfully demonstrated for mobilization and retrieval of remote handled transuranic (RH-TRU) sludge from a 50,000-gal horizontal waste storage tank at Oak Ridge National Laboratory (ORNL). The pulse jet system, consisting of seven modular equipment skids, was installed and commissioned in about 7 weeks and operated remotely for 52 days to remove about 88% of the sludge in the tank. The sys… more
Date: January 1, 1998
Creator: Kent, T. E.; Taylor, S. A.; Moore, J. W.; Stellern, J. L. & Billingsley, K. M.
Partner: UNT Libraries Government Documents Department