2 Matching Results

Search Results

Advanced search parameters have been applied.

ATF2 Commissioning

Description: ATF2 is a final-focus test beam line that aims to focus the low-emittance beam from the ATF damping ring to a beam size of about 37 nm, and at the same time to demonstrate nm beam stability, using numerous advanced beam diagnostics and feedback tools. The construction has been finished at the end of 2008 and the beam commissioning of ATF2 has started in December of 2008. ATF2 is constructed and commissioned by ATF international collaborations with strong US, Asian and European participation.
Date: October 30, 2009
Creator: Seryi, A.; Christian, G.; Parker, B.; Schulte, D.; Delahaye, J. -P.; Tomas, R. et al.
Partner: UNT Libraries Government Documents Department

Challenges And Concepts for Design of An Interaction Region With Push-Pull Arrangement of Detectors - An Interface Document

Description: Two experimental detectors working in a push-pull mode has been considered for the Interaction Region of the International Linear Collider. The push-pull mode of operation sets specific requirements and challenges for many systems of detector and machine, in particular for the IR magnets, for the cryogenics and alignment system, for beamline shielding, for detector design and overall integration, and so on. These challenges and the identified conceptual solutions discussed in the paper intend to form a draft of the Interface Document which will be developed further in the nearest future. The authors of the present paper include the organizers and conveners of working groups of the workshop on engineering design of interaction region IRENG07, the leaders of the IR Integration within Global Design Effort Beam Delivery System, and the representatives from each detector concept submitting the Letters Of Intent.
Date: October 14, 2011
Creator: Parker, B.; /Brookhaven; Herve, Alain; Osborne, J.; /CERN; Mikhailichenko, A. et al.
Partner: UNT Libraries Government Documents Department