RHIC VERTICAL AC DIPOLE COMMISSIONING.

Description: The RHIC vertical ac dipole was installed in the summer of 2001. The magnet is located in the interaction region between sector 3 and sector 4 common to both beams. The resonant frequency of the ac dipole was first configured to be around half of the beam revolution frequency to act as a spin flipper. At the end of the RHIC 2002 run, the ac dipole frequency was reconfigured for linear optics studies. A 0.35 mm driven betatron oscillation was excited with the vertical ac dipole and the vertical betatron functions and phase advances at each beam position monitor (BPM) around the RHIC yellow ring were measured using the excited coherence. We also recorded horizontal turn-by-turn beam positions at each BPM location to investigate coupling effects. Analysis algorithms and measurement results are presented.
Date: June 2, 2002
Creator: BAI,M.; DELONG,J.; HOFF,L.; PAI,C.; PEGGS,S.; PIACENTINO,J. et al.
Partner: UNT Libraries Government Documents Department

RHIC 10 Hz global orbit feedback system

Description: Vibrations of the cryogenic triplet magnets at the Relativistic Heavy Ion Collider (RHIC) are suspected to be causing the horizontal beam perturbations observed at frequencies around 10 Hz. Several solutions to counteract the effect have been considered in the past, including a local beam feedback system at each of the two experimental areas, reinforcing the magnet base support assembly, and a mechanical servo feedback system. However, the local feedback system was insufficient because perturbation amplitudes outside the experimental areas were still problematic, and the mechanical solutions are very expensive. A global 10 Hz orbit feedback system consisting of 36 beam position monitors (BPMs) and 12 small dedicated dipole corrector magnets in each of the two 3.8 km circumference counter-rotating rings has been developed and commissioned in February 2011. A description of the system architecture and results with beam will be discussed.
Date: March 28, 2011
Creator: Michnoff, R.; Arnold, L.; Carboni, L.; Cerniglia, P; Curcio, A.; DeSanto, L. et al.