Search Results

Advanced search parameters have been applied.
open access

Gas Saturated Run on the 400A-1 Pump

Description: A 1585 hr run was completed on the 400A-1 pump with a 0.4 m UC/sub 2/SO/ sub 4/ fuel solution as the pumped fluid, during which it was attempted to operate with gas bubbles in the solution. The gas content ranged from 0.56 ml/gm of solution to 1.189 mi/gm of solution and the gas other than CO/sub 2/, which was assumed to he nitrogen, varied from 0.39 ml/gm of solution to 0.966 ml/gm of solution. Because of uncertainties in the CO/sub 2/ solubility it cannot be stated conclusively that the liqui… more
Date: February 10, 1958
Creator: Payne, H. R.
Partner: UNT Libraries Government Documents Department
open access

PUMP-MOTOR MIXING AND HEAT BALANCE TESTS OF THE BYRON-JACKSON 4000-GPM PUMP

Description: The pump-to-motor mixing rate of the ByronJackson 4000-gpm pump was determined as a function of motor purge flow. A purge rate of 63 liters/hr, which corresponds to a mixing rate of 0.55 liters/hr, is recommended for operation of this pump. Further increases in purge flow did not decrease the mixing rate significantly below this level. Two runs were made with cooling water bypassing the external motor cooler. These runs indicated that the external cooler was necessary to prevent overheating of … more
Date: May 16, 1958
Creator: Payne, H.R.
Partner: UNT Libraries Government Documents Department
open access

Basis for requirements for Advanced Neutron Source (ANS) Control Element Test Facility

Description: The process used to determine the requirements for the Advanced Neutron Source (ANS) Control Element Test Facility (CETF) is explained. The requirements for the CETF are tabulated.
Date: August 1, 1995
Creator: Hendrich, W. R.; Yahr, G. T.; Anderson, J. L.; Battle, R. E.; Litherland, P. S.; Oakes, L. S. et al.
Partner: UNT Libraries Government Documents Department
Back to Top of Screen