3 Matching Results

Search Results

Advanced search parameters have been applied.

DEVELOPMENT OF PERMANENT MECHANICAL REPAIR SLEEVE FOR PLASTIC PIPE

Description: The report presents a comprehensive summary of the project status related to the development of a permanent mechanical repair fitting intended to be installed on damaged PE mains under blowing gas conditions. Specifically, the product definition has been developed taking into account relevant codes and standards and industry input. A conceptual design for the mechanical repair sleeve has been developed which meets the product definition.
Date: September 30, 2004
Creator: Patadia, Hitesh
Partner: UNT Libraries Government Documents Department

DEVELOPMENT OF PERMANENT MECHANICAL REPAIR SLEEVE FOR PLASTIC PIPE

Description: The report presents a comprehensive summary of the prototype development process utilized towards the development of a permanent mechanical repair fitting intended to be installed on damaged PE mains under blowing gas conditions. Specifically, the step by step construction approach is presented and the experimental data to support the mitigation of ensuing slow crack growth (SCG) of the damage area.
Date: April 29, 2005
Creator: Patadia, Hitesh
Partner: UNT Libraries Government Documents Department