Measurements and Changes on SM-1 Core II During Period October 1, 1961 to May 30, 1962
Description:
Tests at the SM-1 reactor are reported for the period October 1, 1961, to May 31, 1962. Loading changes were made in SM-1 Core II during the scheduled semiannual shutdowns in October to November 1961 and April to May 1962. Core physics tests include control rod bank calibrations, bank position at several temperature and xenon poison conditions vs core changes and energy release, shutdown neutron source decay and startup channel testing, and critical rod positions for stuck rod configurations. S…
more
Date:
July 1, 1962
Creator:
Motte, F. G.; Best, W. C. & Kortheuer, J. D.
Item Type: