Search Results

Advanced search parameters have been applied.
open access

Study of Remote Military Power Applications: Report 8, Nike-Zeus Far Site

Description: From introduction: The study is essentially an economic evaluation of the construction and operation of nuclear power plants at several designated military installations where increased power generating capabilities of 5 to 40 mwe may be required by the Government during the period 1963 through 1970.
Date: July 1960
Partner: UNT Libraries Government Documents Department
open access

Study of Remote Military Power Applications: Report 9, Inchon, Korea

Description: From introduction: The study is essentially an economic evaluation of the construction and operation of nuclear power plants at several designated military installations where increased power generating capabilities of 5 to 40 mwe may be required by the Government during the period 1963 through 1970.
Date: July 1960
Partner: UNT Libraries Government Documents Department
open access

Study of Remote Military Power Applications: Report 11, U.S. Naval Air Facility, McMurdo Sound, Antarctica

Description: From introduction: The study is essentially an economic evaluation of the construction and operation of nuclear power plants at several designated military installations where increased power generating capabilities of 5 to 40 mwe may be required by the Government during the period 1963 through 1970.
Date: July 1960
Partner: UNT Libraries Government Documents Department
open access

Study of Remote Military Power Applications: Hypothetical Site

Description: From introduction: The study is essentially an economic evaluation of the construction and operation of nuclear power plants at several designated military installations where increased power generating capabilities of 5 to 40 mwe may be required by the Government during the period 1963 through 1970.
Date: July 1960
Partner: UNT Libraries Government Documents Department
open access

Study of Remote Military Power Applications: Report 1, Summary

Description: From introduction: The study is essentially an economic evaluation of the construction and operation of nuclear power plants at several designated military installations, where increased power generating capabilities of 5 to 10 mwe may be required by the Government for the period 1963 through 1970.
Date: July 1960
Partner: UNT Libraries Government Documents Department
open access

Study of Remote Military Power Applications: Report 2, Okinawa, Ryukyu Islands

Description: From introduction: This study is essentially an economic evaluation of the construction and operation of nuclear power plants at several designated military installations where increased power generating capabilities of 5 to 40 mwe may be required by the Government for the period 1963 through 1970.
Date: July 1960
Partner: UNT Libraries Government Documents Department
open access

Study of Remote Military Power Applications: Report 3, Guam, Mariana Islands

Description: From introduction: The study is essentially an economic evaluation of the construction and operation of nuclear power plants at several designated military installations where increased power generating capabilities of 5 to 40 mwe may be required by the Government during the period 1963 through 1970.
Date: July 1960
Partner: UNT Libraries Government Documents Department
open access

Study of Remote Military Power Applications: Report 4, Thule Air Base, Greenland

Description: From introduction: The study is essentially an economic evaluation of the construction and operation of nuclear power plants at several designated military installations where increased power generating capabilities of 5 to 40 mwe may be required by the Government during the period 1963 through 1970.
Date: July 1960
Partner: UNT Libraries Government Documents Department
open access

Study of Remote Military Power Applications: Report 5, NORAD

Description: From introduction: The study is essentially an economic evaluation of the construction and operation of nuclear power plants at several designated military installations where increased power generating capabilities of 5 to 40 mwe may be required by the Government during the period 1963 through 1970.
Date: July 1960
Partner: UNT Libraries Government Documents Department
open access

Study of Remote Military Power Applications: Report 10, Atlantic Barge

Description: From introduction: The study is essentially an economic evaluation of the construction and operation of nuclear power plants at several designated military installations where increased power generating capabilities of 5 to 40 mwe may be required by the Government during the period 1963 through 1970.
Date: July 1960
Partner: UNT Libraries Government Documents Department
open access

Study of Remote Military Power Applications: Pole Station Antarctica

Description: From introduction: In the report will be found a description of a proposed 500 kw nuclear power plant together with concept drawings, construction cost estimate, design and construction schedule, and operating, maintenance and fuel costs.
Date: July 1960
Creator: Henry J. Kaiser Company
Partner: UNT Libraries Government Documents Department
open access

Study of Remote Military Power Applications: Byrd Station Antarctica

Description: From introduction: In the report will be found a description of a proposed 800 kw nuclear power plant together with concept drawings, construction cost estimate, design and construction schedule, and operating, maintenance and fuel costs.
Date: July 1960
Creator: Henry J. Kaiser Company
Partner: UNT Libraries Government Documents Department
open access

Study of Remote Military Power Applications: Report 7, Super Sage Rocky Mountains Area

Description: From introduction: The study is essentially an economic evaluation of the construction and operation of nuclear power plants at several designated military installations where increased power generating capabilities of 5 to 40 mwe may be required by the Government during the period 1963 through 1970.
Date: July 1960
Partner: UNT Libraries Government Documents Department
open access

Stress analysis of closure bolts for shipping casks

Description: This report specifies the requirements and criteria for stress analysis of closure bolts for shipping casks containing nuclear spent fuels or high level radioactive materials. The specification is based on existing information conceming the structural behavior, analysis, and design of bolted joints. The approach taken was to extend the ASME Boiler and Pressure Vessel Code requirements and criteria for bolting analysis of nuclear piping and pressure vessels to include the appropriate design and … more
Date: January 1, 1993
Creator: Mok, G.C.; Fischer, L.E. (Lawrence Livermore National Lab., CA (United States)) & Hsu, S.T. (Kaiser Engineers, Oakland, CA (United States))
Partner: UNT Libraries Government Documents Department
open access

Small Nuclear Power Plants, Volume 3: A General and Economic Assessment

Description: Report about the study of technical and economic potential of small nuclear power plants; this volume summarizes data collected regarding the economics for nuclear plant and fuel performance capabilities.
Date: March 1967
Creator: Kaiser Engineers
Partner: UNT Libraries Government Documents Department
open access

Controlled comparison of advanced froth flotation process technology and economic evaluations for maximizing BTU recovery and pyritic sulfur rejection

Description: The overall objective of this round robin project was to select the most efficient, as determined by the efficiency index, cost effective, as determined by the annual cost per ton of SO{sub 2} removed, advanced flotation device available. This machine was to process ultra fine coal, maximize Btu recovery and maximize pyritic sulfur rejection. The device will first be installed as a one hundred pound per hour capacity unit and, subject to the outcome of Task 6 of the Engineering Development Cont… more
Date: January 1, 1990
Creator: Harrison, K. E.; Ferris, D. D. (ICF Kaiser Engineers, Inc., Pittsburgh, PA (USA)); Kosky, R. M. (Consolidation Coal Co., Pittsburgh, PA (USA)); Warchol, J. J.; Musiol, W. F.; Shiao, S. Y. (Babcock and Wilcox Co., New Orleans, LA (USA)) et al.
Partner: UNT Libraries Government Documents Department
open access

Experimental Gas-Cooled Reactor: Preliminary Hazards Summary Report

Description: From introduction: This report describes progress during the first quarter on all phases of the ANPP Code Development Program, Pressurized Water Task. The objective of this program is the development of a nuclear physical model and its calculation code for pressurized-water-cooled and moderated reactors to predict accurately reactivity, rod positions, and power distributions at operating temperatures, and reactor life from a nuclear standpoint.
Date: May 1959
Partner: UNT Libraries Government Documents Department
open access

Preliminary Design 55,000 KW Prototype Natural Uranium, Gas Cooled, Graphite Moderated Nuclear Power Plant (Prototype for an Optimum Plant) for United States Atomic Energy Commission, Idaho Operations Office

Description: Report describing the preliminary design of a 55,000 kW prototype of a natural uranium nuclear power plant for the United States Atomic Energy Commission. Testing of the design and potential requirements for operating the plant are included.
Date: April 1, 1958
Creator: Kaiser Engineers
Partner: UNT Libraries Government Documents Department
open access

Feasibility Study, Optimum Natural Uranium, Gas Cooled, Graphite Moderated Nuclear Power Plant for United States Atomic Energy Commission, Idaho Operations Office

Description: Report containing "a discussion of the feasibility design and cost estimates for a gas cooled, natural uranium, graphite moderated power plant optimized for minimum power cost" (p. 3).
Date: April 1, 1958
Creator: ACF Industries Incorporated. Nuclear Products - ERCO Division.
Partner: UNT Libraries Government Documents Department
open access

Feasibility Study, 44,000 KW Prototype Partially Enriched Uranium, Gas Cooled, Graphite Moderated Nuclear Power Plant (Prototype for an Optium Power Plant) for United States Atomic Energy Commission, Idaho Operations Office

Description: Report that "contains a discussion of the feasibility study and cost estimates for a gas cooled, partial enriched uranium, graphite moderated power plant" (p. 3).
Date: April 1, 1958
Creator: Kaiser Engineers
Partner: UNT Libraries Government Documents Department
open access

Savannah River Project Site Report: 30,000 KW Prototype Partically Enriched Uranium Gas Cooled, Graphite Moderated Nuclear Power Plant for United States Atomic Energy Commission Idaho Operations Office

Description: Report describing a modified prototype of a nuclear reactor that uses partially uranium-enriched fuel and is cooled by helium. The construction site, site safety aspects, and design and construction costs are included.
Date: March 1959
Creator: ACF Industries Incorporated. Nuclear Products - ERCO Division.
Partner: UNT Libraries Government Documents Department
Back to Top of Screen