Search Results

Advanced search parameters have been applied.
open access

Study of Remote Military Power Applications: Report 8, Nike-Zeus Far Site

Description: From introduction: The study is essentially an economic evaluation of the construction and operation of nuclear power plants at several designated military installations where increased power generating capabilities of 5 to 40 mwe may be required by the Government during the period 1963 through 1970.
Date: July 1960
Partner: UNT Libraries Government Documents Department
open access

Study of Remote Military Power Applications: Report 9, Inchon, Korea

Description: From introduction: The study is essentially an economic evaluation of the construction and operation of nuclear power plants at several designated military installations where increased power generating capabilities of 5 to 40 mwe may be required by the Government during the period 1963 through 1970.
Date: July 1960
Partner: UNT Libraries Government Documents Department
open access

Study of Remote Military Power Applications: Report 11, U.S. Naval Air Facility, McMurdo Sound, Antarctica

Description: From introduction: The study is essentially an economic evaluation of the construction and operation of nuclear power plants at several designated military installations where increased power generating capabilities of 5 to 40 mwe may be required by the Government during the period 1963 through 1970.
Date: July 1960
Partner: UNT Libraries Government Documents Department
open access

Study of Remote Military Power Applications: Hypothetical Site

Description: From introduction: The study is essentially an economic evaluation of the construction and operation of nuclear power plants at several designated military installations where increased power generating capabilities of 5 to 40 mwe may be required by the Government during the period 1963 through 1970.
Date: July 1960
Partner: UNT Libraries Government Documents Department
open access

Study of Remote Military Power Applications: Report 1, Summary

Description: From introduction: The study is essentially an economic evaluation of the construction and operation of nuclear power plants at several designated military installations, where increased power generating capabilities of 5 to 10 mwe may be required by the Government for the period 1963 through 1970.
Date: July 1960
Partner: UNT Libraries Government Documents Department
open access

Study of Remote Military Power Applications: Report 2, Okinawa, Ryukyu Islands

Description: From introduction: This study is essentially an economic evaluation of the construction and operation of nuclear power plants at several designated military installations where increased power generating capabilities of 5 to 40 mwe may be required by the Government for the period 1963 through 1970.
Date: July 1960
Partner: UNT Libraries Government Documents Department
open access

Study of Remote Military Power Applications: Report 3, Guam, Mariana Islands

Description: From introduction: The study is essentially an economic evaluation of the construction and operation of nuclear power plants at several designated military installations where increased power generating capabilities of 5 to 40 mwe may be required by the Government during the period 1963 through 1970.
Date: July 1960
Partner: UNT Libraries Government Documents Department
open access

Study of Remote Military Power Applications: Report 4, Thule Air Base, Greenland

Description: From introduction: The study is essentially an economic evaluation of the construction and operation of nuclear power plants at several designated military installations where increased power generating capabilities of 5 to 40 mwe may be required by the Government during the period 1963 through 1970.
Date: July 1960
Partner: UNT Libraries Government Documents Department
open access

Study of Remote Military Power Applications: Report 5, NORAD

Description: From introduction: The study is essentially an economic evaluation of the construction and operation of nuclear power plants at several designated military installations where increased power generating capabilities of 5 to 40 mwe may be required by the Government during the period 1963 through 1970.
Date: July 1960
Partner: UNT Libraries Government Documents Department
open access

Study of Remote Military Power Applications: Report 6, Fourth U.S. ASA Field Station Asmara, Eritrea

Description: From introduction: The study is essentially an economic evaluation of the construction and operation of nuclear power plants at several designated military installations where increased power generating capabilities of 5 to 40 mwe may be required by the Government during the period 1963 through 1970.
Date: July 1960
Partner: UNT Libraries Government Documents Department
open access

Study of Remote Military Power Applications: Report 10, Atlantic Barge

Description: From introduction: The study is essentially an economic evaluation of the construction and operation of nuclear power plants at several designated military installations where increased power generating capabilities of 5 to 40 mwe may be required by the Government during the period 1963 through 1970.
Date: July 1960
Partner: UNT Libraries Government Documents Department
open access

Study of Remote Military Power Applications: Report 7, Super Sage Rocky Mountains Area

Description: From introduction: The study is essentially an economic evaluation of the construction and operation of nuclear power plants at several designated military installations where increased power generating capabilities of 5 to 40 mwe may be required by the Government during the period 1963 through 1970.
Date: July 1960
Partner: UNT Libraries Government Documents Department
open access

Oak Ridge Site Report 30,000 KiloWatt Prototype Partially Enriched Uranium Gas Cooled, Graphite Moderated Nuclear Power Plant

Description: From introduction: "This report describes the selected site for a prototype nuclear plant, the reactor safety aspects for the site, the modified design of the plant, and estimate of the design and construction cost."
Date: March 1959
Creator: Kaiser Engineers
Partner: UNT Libraries Government Documents Department
open access

Preliminary Design 55,000 KW Prototype Natural Uranium, Gas Cooled, Graphite Moderated Nuclear Power Plant (Prototype for an Optimum Plant) for United States Atomic Energy Commission, Idaho Operations Office

Description: Report describing the preliminary design of a 55,000 kW prototype of a natural uranium nuclear power plant for the United States Atomic Energy Commission. Testing of the design and potential requirements for operating the plant are included.
Date: April 1, 1958
Creator: Kaiser Engineers
Partner: UNT Libraries Government Documents Department
open access

Feasibility Study, 44,000 KW Prototype Partially Enriched Uranium, Gas Cooled, Graphite Moderated Nuclear Power Plant (Prototype for an Optium Power Plant) for United States Atomic Energy Commission, Idaho Operations Office

Description: Report that "contains a discussion of the feasibility study and cost estimates for a gas cooled, partial enriched uranium, graphite moderated power plant" (p. 3).
Date: April 1, 1958
Creator: Kaiser Engineers
Partner: UNT Libraries Government Documents Department
open access

Savannah River Project Site Report: 30,000 KW Prototype Partically Enriched Uranium Gas Cooled, Graphite Moderated Nuclear Power Plant for United States Atomic Energy Commission Idaho Operations Office

Description: Report describing a modified prototype of a nuclear reactor that uses partially uranium-enriched fuel and is cooled by helium. The construction site, site safety aspects, and design and construction costs are included.
Date: March 1959
Creator: ACF Industries Incorporated. Nuclear Products - ERCO Division.
Partner: UNT Libraries Government Documents Department
open access

Feasibility Study, Optimum Partially Enriched Uranium, Gas Cooled, Graphite Moderated for United States Atomic Energy Commission, Idaho Operations Office

Description: Report that contains "a preliminary design and feasibility studies of gas cooled, graphite moderated, nuclear power plants" (p. 1).
Date: April 1, 1958
Creator: ACF Industries Incorporated. Nuclear Products - ERCO Division.
Partner: UNT Libraries Government Documents Department
open access

Appendix to Preliminary Design 55,000 KW Prototype Natural Uranium, Gas Cooled, Graphite Moderated Nuclear Power Plant (Prototype for an Optimum Plant) for United States Atomic Energy Commission, Idaho Operations Office

Description: Report containing documentation of projects undertaken by the multiple branches of the Health and Safety Division of the Idaho Operations Office at the Nuclear Reactor Testing Station (NRTS).
Date: March 1958
Creator: U.S. Atomic Energy Commission. Idaho Operations Office.
Partner: UNT Libraries Government Documents Department
open access

Comparison of Optimum Natural Uranium Nuclear Power Plant and Optimum Enriched Uranium Nuclear Power Plant

Description: Report that "compares the designs of an optimum natural uranium power plant and an optimum partially enriched uranium power plant, both using CO2 as a coolant" (p. 1). Includes a description of each plant's design, construction, and economic considerations.
Date: August 1958
Creator: Kaiser Engineers
Partner: UNT Libraries Government Documents Department
open access

Preliminary Design 30,000 KW Prototype Partially Enriched Uranium, Gas Cooled, Graphite Moderated Nuclear Power Plant (Prototype of an Optimum Plant) for United States Atomic Energy Commission, Idaho Operations Office contract no. AT(10-1)-925

Description: Report containing the preliminary design for a nuclear reactor plant and its facilities. Includes a description of systems, safety procedures, costs, and a glossary.
Date: March 1959
Creator: Kaiser Engineers
Partner: UNT Libraries Government Documents Department
open access

Appendix to Preliminary Design 30,000 KW Prototype Partially Enriched Uranium, Gas Cooled, Graphite Moderated Nuclear Power Plant (Prototype for an Optimum Plant) for United States Atomic Energy Commission Idaho Operations Office Contract No. AT(10-1)-925

Description: Report containing outlines of operating procedures, costs, construction, safety analysis, studies, and design specifications of a 30,000 kilowatt prototype partially enriched uranium nuclear power plant.
Date: March 1959
Creator: Kaiser Engineers
Partner: UNT Libraries Government Documents Department
Back to Top of Screen