Search Results

Advanced search parameters have been applied.
open access

Diffusion Still Analysis

Description: Report describing a diffusion still for desalination of water, which produces pure water at temperatures below the boiling point by diffusion in the presence of air. The principal advantage of the concept is great mechanical simplicity, requiring neither high vapor pressure nor vacuum equipment.
Date: 1964
Creator: Kroeger, Peter
Partner: UNT Libraries Government Documents Department
open access

Health Physics Report: January-March 1958

Description: Summary: A Laboratory operating and policy guide was issued which requires that all new KAPL, KAPL subcontractor, and AEC contractor personnel receive an indoctrination in radiation protection before beginning work at the Laboratory.
Date: 1958
Partner: UNT Libraries Government Documents Department
open access

Compatibility of Materials in Liquid Metal

Description: Report describing a series of boundary laboratory tests conducted in liquid metal initiated to determine the materials which are best suited for use as sodium- or NaK-lubricated bearings under conditions of boundary lubrication. Results are presented in graphical and narrative form along with a discussion of the testing procedure, equipment, materials, and heat treatment specifications.
Date: August 18, 1951
Creator: Vail, Donald B.
Partner: UNT Libraries Government Documents Department
open access

Evaluation of Seal Weld Joint Designs

Description: Report discussing a program to investigate the properties of two types of seal welds for Synthetic Aperture Radar (SAR) components. The objective of the study is to determine mechanical properties of concave canopy seal welds and convex canopy seal welds, determine if these two seal weld joint designs can be used safely for fabrication of SAR components, and to develop optimum welding conditions and weld joint designs for uniform full weld penetration using a concave and a convex canopy weld. T… more
Date: January 17, 1957
Creator: Kittle, D. B.
Partner: UNT Libraries Government Documents Department
open access

Brazing of Zircaloy 3 for Temperature Instrumented Probes

Description: Report describing a study to investigate the strength, ductility and corrosion resistance in 680 degree Fahrenheit water of several alloys for brazing Zircaloy 3 to itself. The conclusions and results of the study are summarized and data from the is presented in tables and summarized in the narrative.
Date: May 1, 1957
Creator: Gerken, J. M.
Partner: UNT Libraries Government Documents Department
open access

Evaluation of the Effects of Atomic Bomb Detonations in the State of Nevada on Air-Borne Contamination at Knolls Atomic Power Laboratory, Knolls Site and Environs

Description: Report investigating contamination of the atmosphere with radioactive elements above the normally expected levels at Knolls Atomic Power Laboratory (KAPL) - Knolls, Scandaga, and West Milton Sites - soon after the first atomic bomb was exploded in the Nevada testing station on January 27, 1951. Results are presented in graphs and in a narrative summary.
Date: May 7, 1951
Creator: Cherubin, L. J.
Partner: UNT Libraries Government Documents Department
open access

Strain Fatigue Behavior of Zircaloy 2 and 3 at Room Temperature and 550°F

Description: Report describing a study performing strain-fatigue tests performed at room temperature and 550 degrees Fahrenheit on 1/2-inch hot-rolled and annealed plate of Zircaloy 2 and 3. The data is to be used on a S3G unit cell fuel element assembly. The report describes material and test procedure, a presentation of the results, and discussion of the results.
Date: November 18, 1957
Creator: Mehan, R. L.; Groleau, D. T.; Reed, J. H. & Sokol, G. J.
Partner: UNT Libraries Government Documents Department
open access

The Determination of U²³⁷ and Fission-Product Contamination in Uranium Recovered by the Redox Process

Description: Introduction: "When uranium slugs are irradiated in the Hanford piles, one of the many substances formed is U-237. It arises primarily from the reaction: U-238 (n,2n) U-237. This uranium isotope is a beta and gamma emitter with a half-life of 6.7 days. Because it is isotopic with U-238, it accompanies the uranium recovered by the Redox Process, and its concentration is, of course, not diminished by the fission-product decontamination cycles. As a consequence, the maximum total decontamination … more
Date: October 1, 1952
Creator: Leboeuf, M. B.
Partner: UNT Libraries Government Documents Department
open access

Manual of Radiation Protection Standards

Description: "The following is an alphabetical listing of terms and units in common usage at HAPO. Other terms and definitions may be added as the need becomes apparent or as revisions or additional terms are issued by the NCRP and ICRP."
Date: July 1957
Creator: General Electric Company
Partner: UNT Libraries Government Documents Department
open access

Manual of Radiation Protection Standards

Description: "The following is an alphabetical listing of terms and units in common usage at Hanford Atomic Products Operation. Other terms and definitions may be added as the need becomes apparent or as revisions or additional terms are issued by the NCRP and ICRP."
Date: March 1, 1960
Creator: General Electric Company
Partner: UNT Libraries Government Documents Department
open access

A General Purpose Log Counting Rate Meter Model B

Description: Abstract: This report is a brief description of a general purpose logarithmic counting rate meter developed at the Knolls Atomic Power Laboratory. The theory of operation and the circuit design are discussed. The use of a diode as a logarithmic element in the integrating circuit allows extremely accurate counting rate determinations over a five decade range.
Date: November 1, 1954
Creator: Stone, R. S. & Wade, E. J.
Partner: UNT Libraries Government Documents Department
open access

Boiling Water Reactor Study [Part 1]: 306 Mw Power Reactor Conceptual Design

Description: From introduction: In general, the objective of this study is to provide for the development of the conceptual design criteria for the most promising type of boiling water reactor and associated complete electrical generating plant consistent with a schedule calling for start of construction in July 1960.
Date: July 1959
Creator: Ebasco Services Incorporated
Partner: UNT Libraries Government Documents Department
Back to Top of Screen