1 Matching Results

Search Results

Advanced search parameters have been applied.

Development of a commissioning plan for the APT linac

Description: The Accelerator Production of Tritium (APT) facility is based on a linac which incorporates both normal-conducting and superconducting RF technology and accelerates a 100-mA cw proton beam to an energy of 1,030 MeV or higher, depending on the desired production rate. Commissioning plans to achieve full power operation with minimum beam-induced activation of components have been evolving. This paper presents the main issues and the basic approaches that are now being discussed.
Date: December 1998
Creator: Funk, L. W.; Crandall, K. R.; Gilpatrick, J. D.; Gray, E. R.; Regan, A. H.; Rohlev, A. et al.
Partner: UNT Libraries Government Documents Department