Search Results

Advanced search parameters have been applied.
open access

The Mechanical and Thermal Design for the MICE Detector Solenoid Magnet System

Description: The detector solenoid for MICE surrounds a scintillating fiber tracker that is used to analyze the muon beam within the detector. There are two detector magnets for measuring the beam emittance entering and leaving the cooling channel that forms the central part of the experiment. The field in the region of the fiber detectors must be from 2.8 to 4 T and uniform to better than 1 percent over a volume that is 300 mm in diameter by 1000 mm long. The portion of the detector magnet that is around t… more
Date: September 26, 2004
Creator: Fabbricatore, P.; Farinon, S.; Perrella, M.; Bravar, U. & Green, M. A.
Partner: UNT Libraries Government Documents Department
open access

BaBar Superconducting Coil: Design, Construction and Test

Description: The BABAR Detector, located in the PEP-II B-Factory at the Stanford Linear Accelerator Center, includes a large 1.5 Tesla superconducting solenoid, 2.8 m bore and length 3.7 m. The two layer solenoid is wound with an aluminum stabilized conductor which is graded axially to produce a {+-} 3% field uniformity in the tracking region. This paper summarizes the 3 year design, fabrication and testing program of the superconducting solenoid. The work was carried out by an international collaboration b… more
Date: January 26, 2001
Creator: Bell, R. A.; Berndt, M.; Burgess, W.; Craddock, W.; Dormicchi, O.; Fabbricatore, P. et al.
Partner: UNT Libraries Government Documents Department
open access

Design and Testing of the 1.5 T Superconducting Solenoid for the BaBar Detector at Pep-II in SLAC

Description: The 1.5 Tesla superconducting solenoid is part of the BABAR Detector located in the PEP-II B-Factory machine at the Stanford Linear Accelerator Center. The solenoid has a 2.8 m bore and is 3.7 m long. The two layer solenoid is wound with an aluminum stabilized conductor which is graded axially to produce a {+-} 3% field uniformity in the tracking region. The 24 month fabrication, 3 month installation and 1 month commissioning of the solenoid were completed on time and budget. This paper summari… more
Date: January 26, 2001
Creator: O'Connor, T. G.; Shen, S.; Fabbricatore, P.; Farinon, S.; Musenich, R.; Priano, C. et al.
Partner: UNT Libraries Government Documents Department
Back to Top of Screen