Phase I of the automated array assembly task of the low cost silicon solar array project. Technical quarterly report No. 3
Description:
A matrix of possible process steps is presented. Each process is evaluated by suitability criteria and categorized with respect to future usefulness. From the processes which have a high probability of incorporation into a future manufacturing factory, a possible process sequence is chosen. Studies of detailed cost analysis and factory projections have been initiated. Reliability considerations are discussed for module interconnections and encapsulant materials.
Date:
October 1, 1976
Creator:
Coleman, M.
Item Type:
Refine your search to only
Report
Partner:
UNT Libraries Government Documents Department