Nuclear-Conventional Power Plant Cost Study. Conventional Coal Fired Power Plants : 25,000 KW to 325,000 KW for Argonne National Laboratory, Lemont, Illinois

Description: In order to establish a basis for comparing the estimated cost of nuclear power plant designs, a set of general and detailed design considerations for conventional coal-fired power plants was established. Five preliminary designs of conventional coal-fired power plants ranging in size from 25to 325 mw were selected, and cost estimates were prepared. ( A.C.)
Date: March 2, 1959
Creator: Chittenden, W. A.
Partner: UNT Libraries Government Documents Department
open access

Supplement No. 1. Projections of Costs, 1959-1975 for Nuclear-Conventional Power Plant Cost Study. Conventional Coal Fired Power Plants : 25,000 KW to 325,000 KW for Argonne National Laboratory, Lemont, Illinois

Description: In order to establish a basis for comparing the estimated cost of nuclear power plant designs, a set of general and detailed design considerations for conventional coal-fired power plants was established. Five preliminary designs of conventional coal-fired power plants ranging in size from 25to 325 mw were selected, and cost estimates were prepared. Supplement 1 shows a year by year projection of costs for the period 1959-1975.
Date: July 2, 1959
Creator: Chittenden, W. A.
Partner: UNT Libraries Government Documents Department
open access

Supplement No. 2. Supplemental Data for Nuclear-Conventional Power Plant Cost Study. Conventional Coal Fired Power Plants : 25,000 KW to 325,000 KW for Evaluation and Planning Branch, Division of Reactor Development, Atomic Energy Commission

Description: In order to establish a basis for comparing the estimated cost of nuclear power plant designs, a set of general and detailed design considerations for conventional coal-fired power plants was established. Five preliminary designs of conventional coal-fired power plants ranging in size from 25to 325 mw were selected, and cost estimates were prepared. Supplement No. 2 furnishes the following requested information.: (1) Projected investments costs, 1959-1975 for each of the five unites sizes; (2) … more
Date: September 1, 1959
Creator: Chittenden, W. A.
Partner: UNT Libraries Government Documents Department