90 Matching Results

Search Results

Advanced search parameters have been applied.

Kriging for interpolation of sparse and irregularly distributed geologic data

Description: For many geologic problems, subsurface observations are available only from a small number of irregularly distributed locations, for example from a handful of drill holes in the region of interest. These observations will be interpolated one way or another, for example by hand-drawn stratigraphic cross-sections, by trend-fitting techniques, or by simple averaging which ignores spatial correlation. In this paper we consider an interpolation technique for such situations which provides, in addition to point estimates, the error estimates which are lacking from other ad hoc methods. The proposed estimator is like a kriging estimator in form, but because direct estimation of the spatial covariance function is not possible the parameters of the estimator are selected by cross-validation. Its use in estimating subsurface stratigraphy at a candidate site for geologic waste repository provides an example.
Date: December 31, 1986
Creator: Campbell, K.
Partner: UNT Libraries Government Documents Department

Lateral continuity of sorptive mineral zones underlying Yucca Mountain, Nevada

Description: Mineralogical investigations at Yucca Mountain in southwestern Nevada are part of the characterization of this site for a potential nuclear waste repository. This report analyzes compositional data obtained by x-ray powder diffraction for several hundred samples from fourteen drill holes in the vicinity of Yucca Mountain. Mineralization is compared with the functional stratigraphy for the region. Three major zeolitized intervals below the Topopah Spring Member of the Paintbrush Tuff are of particular interest because of their potential to retard the transport of dissolved radionuclides. No significant lateral trends in total zeolitization within these units are noted in the neighborhood of the Exploration Block, but there are trends in the abundances of the individual zeolites. Much local variation that cannot be explained by either vertical or lateral trends is observed.
Date: August 1, 1987
Creator: Campbell, K.
Partner: UNT Libraries Government Documents Department

Bootstrapped models for intrinsic random functions

Description: The use of intrinsic random function stochastic models as a basis for estimation in geostatistical work requires the identification of the generalized covariance function of the underlying process, and the fact that this function has to be estimated from the data introduces an additional source of error into predictions based on the model. This paper develops the sample reuse procedure called the ''bootstrap'' in the context of intrinsic random functions to obtain realistic estimates of these errors. Simulation results support the conclusion that bootstrap distributions of functionals of the process, as well as of their ''kriging variance,'' provide a reasonable picture of the variability introduced by imperfect estimation of the generalized covariance function.
Date: January 1, 1987
Creator: Campbell, K.
Partner: UNT Libraries Government Documents Department

Seismic hazard analysis for the NTS spent reactor fuel test site

Description: An experiment is being directed at the Nevada Test Site to test the feasibility for storage of spent fuel from nuclear reactors in geologic media. As part of this project, an analysis of the earthquake hazard was prepared. This report presents the results of this seismic hazard assessment. Two distinct components of the seismic hazard were addressed: vibratory ground motion and surface displacement. (ACR)
Date: May 2, 1980
Creator: Campbell, K.W.
Partner: UNT Libraries Government Documents Department

Economics of installation and operation of alternative screening devices pursuant to Sect. 316(b)

Description: This paper presents the results of a cost evaluation contained in a study of the engineering feasibility and biological effectiveness of various intake screening methods affording fish protection at steam--electric power plants. The cost evaluation included consideration of modified traveling screens with fish buckets and auxiliary equipment; center-flow traveling screens with fish handling provisions; and angled, flush-mounted traveling screens. These screening systems were deemed feasible from an engineering perspective and conceptually viable from a biological perspective.
Date: January 1, 1978
Creator: Campbell, K.K.
Partner: UNT Libraries Government Documents Department

Effect of model choice and sample size on statistical tolerance limits. [LMFBR]

Description: Statistical tolerance limits are estimates of large (or small) quantiles of a distribution, quantities which are very sensitive to the shape of the tail of the distribution. The exact nature of this tail behavior cannot be ascertained brom small samples, so statistical tolerance limits are frequently computed using a statistical model chosen on the basis of theoretical considerations or prior experience with similar populations. This report illustrates the effects of such choices on the computations.
Date: March 1, 1980
Creator: Duran, B.S. & Campbell, K.
Partner: UNT Libraries Government Documents Department

Proceedings of the second ERDA statistical symposium

Description: The Second ERDA Statistical Symposium, sponsored by the Energy Research and Development Administration, was held at Oak Ridge, Tennessee, October 25-27, 1976. This was the second annual symposium designed to promote interlaboratory communications among ERDA statisticians as well as contacts with statisticians from other institutions. The proceedings of the first symposium, held at Los Alamos in November, 1975, have been published by Batelle Pacific Northwest Laboratories (BNWL-1986). Separate abstracts were prepared for seven of the papers in this proceeding, all going in ERDA Energy Research Abstracts (ERA) and two in Energy Abstracts for Policy Analysis (EAPA). The remaining four have already been cited in ERA and can be found by referring to CONF-761023-- in the report number index. (RWR)
Date: April 1, 1977
Creator: Tietjen, G. & Campbell, K. (comps.)
Partner: UNT Libraries Government Documents Department

Closure Report for Corrective Action Unit 346: Areas 8, 10 Housekeeping Sites, Nevada Test Site, Nevada

Description: This Closure Report documents the closure activities conducted for Corrective Action Unit (CAU) 346: Areas 8, 10 Housekeeping Sites. CAU 346 is listed in Appendix III of the Federal Facility Agreement and Consent Order (FFACO, 1996) and consists of the following 14 Corrective Action Sites (CASs) located in Areas 8 and 10 of the Nevada Test Site (NTS): (1) CAS 08-22-04: Drums (2); (2) CAS 08-22-11: Drums; Bucket; (3) CAS 08-24-02: Battery; (4) CAS 10-14-01: Transformer; (5) CAS 10-22-06: Drum (Gas Block); (6) CAS 10-22-10: Drum (Gas Block); (7) CAS 10-22-12: Drum (Gas Block); (8) CAS 10-22-13: Drum (Gas Block); (9) CAS 10-22-16: Drum (Gas Block); (10) CAS 10-22-22: Drum; (11) CAS 10-22-25: Drum; (12) CAS 10-22-36: Paint Can; (13) CAS 10-22-37: Gas Block; and (14) CAS 10-24-11: Battery. Closure activities consisted of closing each CAS by removing debris and/or material, disposing of the generated waste, and verifying that each site was clean-closed by visual inspection and/or laboratory analysis of soil verification samples.
Date: August 1, 2003
Creator: Campbell, K. B.
Partner: UNT Libraries Government Documents Department

Corrective Action Plan for Corrective Action Unit 335: Area 6 Injection Well and Drain Pit Nevada Test Site, Nevada

Description: This Corrective Action Plan (CAP) has been prepared for Corrective Action Unit (CAU) 335, Area 6 Injection Well and Drain Pit, in accordance with the Federal Facility Agreement and Consent Order (FFACO) (1996). This CAP provides the methodology for implementing the approved corrective action alternative as listed in the Corrective Action Decision Document (CADD). However, there is one modification to the selected alternative. Due to the large area that would require fencing, it is proposed that instead of fencing, an appropriate number of warning signs attached to tee posts be used to delineate the use restriction area. CAU 335 is located in Area 6 of the Nevada Test Site (NTS) which is approximately 105 kilometers (km) (65 miles [mi]) northwest of Las Vegas, Nevada. CAU 335 is located in the Area 6 Well 3 Yard approximately 39 km (24 mi) north of Mercury, on the Mercury Highway and several hundred feet (ft) west along Road 6-06. CAU 335 consists of the following three Corrective Action Sites (CASs): CAS 06-20-01, Drums, Oil Waste, Spill; CAS 06-20-02, 20-inch Cased Hole; CAS 06-23-03, Drain Pit. The site history for CAU 335 is provided in the Corrective Action Investigation Plan (DOE/NV, 2000). Briefly, CAS 06-20-01, was used for storing material that was pumped out of CAS 06-20-02 and placed into four 208-liter (L) (55-gall [gal]) drums. The drums were taken to the NTS Area 5 Hazardous Waste Accumulation Site in 1991. CAS 06-20-01 will be closed with no further action required. Any spills associated with CAS 06-20-01 are addressed and considered part of CAS 06-20-02. CAS 06-20-02 was used for disposal of used motor oil, wastewater, and debris for an undetermined amount of time. In 1991, the casing was emptied of its contents, excavated, and backfilled. CAS 06-23-03 was used as a depository for ...
Date: October 1, 2002
Creator: Campbell, K. B.
Partner: UNT Libraries Government Documents Department

Corrective Action Plan for Corrective Action Unit 262: Area 25 Septic Systems and Underground Discharge Point, Nevada Test Site, Nevada

Description: This Corrective Action Plan (CAP) provides selected corrective action alternatives and proposes the closure methodology for Corrective Action Unit (CAU) 262, Area 25 Septic Systems and Underground Discharge Point. CAU 262 is identified in the Federal Facility Agreement and Consent Order (FFACO) of 1996. Remediation of CAU 262 is required under the FFACO. CAU 262 is located in Area 25 of the Nevada Test Site (NTS), approximately 100 kilometers (km) (62 miles [mi]) northwest of Las Vegas, Nevada. The nine Corrective Action Sites (CASs) within CAU 262 are located in the Nuclear Rocket Development Station complex. Individual CASs are located in the vicinity of the Reactor Maintenance, Assembly, and Disassembly (R-MAD); Engine Maintenance, Assembly, and Disassembly (E-MAD); and Test Cell C compounds. CAU 262 includes the following CASs as provided in the FFACO (1996); CAS 25-02-06, Underground Storage Tank; CAS 25-04-06, Septic Systems A and B; CAS 25-04-07, Septic System; CAS 25-05-03, Leachfield; CAS 25-05-05, Leachfield; CAS 25-05-06, Leachfield; CAS 25-05-08, Radioactive Leachfield; CAS 25-05-12, Leachfield; and CAS 25-51-01, Dry Well. Figures 2, 3, and 4 show the locations of the R-MAD, the E-MAD, and the Test Cell C CASs, respectively. The facilities within CAU 262 supported nuclear rocket reactor engine testing. Activities associated with the program were performed between 1958 and 1973. However, several other projects used the facilities after 1973. A significant quantity of radioactive and sanitary waste was produced during routine operations. Most of the radioactive waste was managed by disposal in the posted leachfields. Sanitary wastes were disposed in sanitary leachfields. Septic tanks, present at sanitary leachfields (i.e., CAS 25-02-06,2504-06 [Septic Systems A and B], 25-04-07, 25-05-05,25-05-12) allowed solids to settle out of suspension prior to entering the leachfield. Posted leachfields do not contain septic tanks. All CASs located in CAU 262 are inactive or abandoned. ...
Date: June 1, 2002
Creator: Campbell, K. B.
Partner: UNT Libraries Government Documents Department

Post-Closure Inspection Report for Corrective Action Unit 404: Roller Coaster Lagoons and Trench Tonopah Test Range, Nevada, Calendar Year 2001

Description: Post-closure monitoring requirements for the Roller Coaster Lagoons and Trench (Corrective Action Unit [CAU] 404) (Figure 1) are described in Closure Report for Corrective Action Unit 404. Roller Coaster Sewage Lagoons and North Disposal Trench. Tonopah Test Range. Nevada, report number DOE/NV--187, September 1998. The Closure Report (CR) was submitted to the Nevada Division of Environmental Protection (NDEP) on September 11, 1998. Permeability results of soils adjacent to the engineered cover and a request for closure of CAU 404 were transmitted to the NDEP on April 29, 1999. The CR (containing the Post-Closure Monitoring Plan) was approved by the NDEP on May 18, 1999. As stated in Section 5.0 of the NDEP-approved CRY post-closure monitoring at CAU 404 consists of the following: (1) Visual site inspections done twice a year to evaluate the condition of the cover and plant development. (2) Verification that the site is secure and condition of the fence and posted warning signs. (3) Notice of any subsidence, erosion, unauthorized excavation, etc., deficiencies that may compromise the integrity of the unit. (4) Remedy of any deficiencies within 90 days of discovery. (5) Preparation and submittal of an annual report. In addition to the above activities, vegetative monitoring of the cover (a plant census) will be done in the first, third and fifth year following revegetation. (Vegetative monitoring will done in fiscal year 2001, and the results reported in the 2002 Post-Closure Inspection Report.) Site inspections were conducted on May 16, 2001, and November 6, 2001. The site inspections were conducted after completion of the revegetation activities (October 30, 1997) and NDEP approval of the CR (May 18, 1999). All site inspections were conducted in accordance with the Post-Closure Monitoring Plan in the NDEP-approved CR. This report includes copies of inspection checklists, photographs, recommendations, and conclusions. The Post-Closure ...
Date: January 1, 2002
Creator: Campbell, K. B.
Partner: UNT Libraries Government Documents Department

Post-Closure Monitoring Report for Corrective Action Unit 342: Area 23 Mercury Fire Training Pit, Nevada Test Site, Nevada, Calendar Years 2000-2001

Description: This biennial soil gas monitoring report provides an analysis and summary of site inspections and soil gas monitoring data obtained at the Area 23 Mercury Fire Training Pit site, located in Area 23 of the Nevada Test Site, Nye County, Nevada, during the calendar years December 1999--December 2001 monitoring period. This site is identified in the Federal Facility Agreement and Consent Order (FFACO, 1996) as Corrective Action Site (CAS) 23-56-01 and is the only CAS assigned to Corrective Action Unit 342. Inspections of the Area 23 Mercury Fire Training pit site are conducted to determine and document the physical condition of the site, monitoring well, and any unusual conditions that could impact the proper operation of the unit closure. Physical inspections of the closure were completed semiannually and indicated that the site is in good condition with no significant findings noted. The objective of the soil gas monitoring program is to determine if the remaining petroleum hydrocarbons beneath the above-ground storage tank area are undergoing natural biodegradation. Comparing initial conditions to those of the first biennial soil gas monitoring event indicate a general increase in concentration of organic analytes, although this trend is not strong. There has been a decrease in the amount of carbon dioxide, with the percentage of nitrogen and oxygen about the same. The increase in organic analytes indicates that mixing of the atmosphere with the air in the monitoring well is occurring. Changes in atmospheric pressure will drive air both in and out of the monitoring well. The change in carbon dioxide in the opposite direction possibly indicates a change in biological parameters between the sampling events. The sampling and analysis of future samples should be consistent with the methods already used. This includes sampling at the same time of year, but not immediately after a ...
Date: April 1, 2002
Creator: Campbell, K. B.
Partner: UNT Libraries Government Documents Department

Corrective Action Plan for Corrective Action Unit 417: Central Nevada Test Area Surface, Nevada

Description: This Corrective Action Plan provides methods for implementing the approved corrective action alternative as provided in the Corrective Action Decision Document for the Central Nevada Test Area (CNTA), Corrective Action Unit (CAU) 417 (DOE/NV, 1999). The CNTA is located in the Hot Creek Valley in Nye County, Nevada, approximately 137 kilometers (85 miles) northeast of Tonopah, Nevada. The CNTA consists of three separate land withdrawal areas commonly referred to as UC-1, UC-3, and UC-4, all of which are accessible to the public. CAU 417 consists of 34 Corrective Action Sites (CASs). Results of the investigation activities completed in 1998 are presented in Appendix D of the Corrective Action Decision Document (DOE/NV, 1999). According to the results, the only Constituent of Concern at the CNTA is total petroleum hydrocarbons (TPH). Of the 34 CASs, corrective action was proposed for 16 sites in 13 CASs. In fiscal year 1999, a Phase I Work Plan was prepared for the construction of a cover on the UC-4 Mud Pit C to gather information on cover constructibility and to perform site management activities. With Nevada Division of Environmental Protection concurrence, the Phase I field activities began in August 1999. A multi-layered cover using a Geosynthetic Clay Liner as an infiltration barrier was constructed over the UC-4 Mud Pit. Some TPH impacted material was relocated, concrete monuments were installed at nine sites, signs warning of site conditions were posted at seven sites, and subsidence markers were installed on the UC-4 Mud Pit C cover. Results from the field activities indicated that the UC-4 Mud Pit C cover design was constructable and could be used at the UC-1 Central Mud Pit (CMP). However, because of the size of the UC-1 CMP this design would be extremely costly. An alternative cover design, a vegetated cover, is proposed for ...
Date: April 1, 2000
Creator: Campbell, K.
Partner: UNT Libraries Government Documents Department

ERRATA SHEET for Corrective Action Plan for Corrective Action Unit 490: Station 44 Burn Area, Tonopah Test Range, Nevada

Description: Section 2.1.1.3 of the Table of Contents reference on Page v and on Page 12 of the Corrective Action Plan for Corrective Action Unit 490: Station 44 Burn Area, Tonopah Test Range, Nevada erroneously refers to the Nevada Environmental Policy Act Determination. The correct title of the referenced document is the National Environmental Policy Act Determination.
Date: April 1, 2002
Creator: Campbell, K. B.
Partner: UNT Libraries Government Documents Department

Closure Report for Corrective Action Unit 425: Area 9 Main Lake Construction Debris Disposal Area, Tonopah Test Range, Nevada

Description: Corrective Action Unit (CAU) 425 is located on the Tonopah Test Range, approximately 386 kilometers (240 miles) northwest of Las Vegas, Nevada. CAU 425 is listed in the Federal Facility Agreement and Consent Order (FFACO, 1996) and is comprised of one Corrective Action Site (CAS). CAS 09-08-001-TA09 consisted of a large pile of concrete rubble from the original Hard Target and construction debris associated with the Tornado Rocket Sled Tests. CAU 425 was closed in accordance with the FFACO and the Nevada Division of Environmental Protection-approved Streamlined Approach for Environmental Restoration Plan for CAU 425: Area 9 Main Lake Construction Debris Disposal Area, Tonopah Test Range, Nevada (U.S. Department of Energy, Nevada Operations Office, 2002). CAU 425 was closed by implementing the following corrective actions: The approved corrective action for this unit was clean closure. Closure activities included: (1) Removal of all the debris from the site. (2) Weighing each load of debris leaving the job site. (3) Transporting the debris to the U.S. Air Force Construction Landfill for disposal. (4) Placing the radioactive material in a U.S. Department of Transportation approved container for proper transport and disposal. (5) Transporting the radioactive material to the Nevada Test Site for disposal. (6) Regrading the job site to its approximate original contours/elevation.
Date: March 1, 2003
Creator: Campbell, K. B.
Partner: UNT Libraries Government Documents Department

Closure Report for Corrective Action Unit 499: Hydrocarbon Spill Site, Tonopah Test Range, Nevada

Description: This Closure Report (CR) has been prepared for Corrective Action Unit (CAU) 499: Hydrocarbon Spill Site, in accordance with the Federal Facility Agreement and Consent Order (FFACO, 1996) and the Nevada Division of Environmental Protection (NDEP)-approved Streamlined Approach for Environmental Restoration (SAFER) Plan for CAU 499: Hydrocarbon Spill Site, Tonopah Test Range (TTR), Nevada (US Department of Energy, Nevada Operations Office [DOE/NV], 2001). CAU 499 consists of one Corrective Action Site (CAS): RG-25-001-RD24: Radar 24 Diesel Spill Site which is approximately 4.0 kilometers (2.5 miles) southwest of the Area 3 Compound at the end of Avenue 24. The Hydrocarbon Spill Site is a diesel fuel release site that is assumed to have been caused by numerous small historical over-fillings, spills, and leaks from an above-ground storage tank (AST) over a period of approximately 36 years. The tank was located on the east side of Building 24-50 on the TTR.
Date: July 1, 2002
Creator: Campbell, K. B.
Partner: UNT Libraries Government Documents Department

Post-Closure Monitoring Report for Corrective Action Unit 339: Area 12 Fleet Operations Steam Cleaning Effluent Nevada Test Site, Nevada

Description: The Area 12 Fleet Operations Steam Cleaning Effluent site is located in the southeastern portion of the Area 12 Camp at the Nevada Test Site. This site is identified in the Federal Facility Agreement and Consent Order (1996) as Corrective Action Site (CAS) 12-19-01 and is the only CAS assigned to Corrective Action Unit (CAU) 339. Post-closure sampling and inspection of the site were completed on March 27, 2002. Post-closure monitoring activities were scheduled biennially (every two years) in the Post-Closure Monitoring Plan provided in the Closure Report for CAU 339: Area 12 Fleet Operations Steam Cleaning Effluent, Nevada Test Site (U.S. Department of Energy, Nevada Operations Office [DOEN], 1997). A baseline for the site was established by sampling in 1997. Based on the recommendations from the 1999 post-closure monitoring report (DOE/NV, 1999), samples were collected in 2000, earlier than originally proposed, because the 1999 sample results did not provide the expected decrease in total petroleum hydrocarbon (TPH) concentrations at the site. Sampling results from 2000 (DOE/NV, 2000) and 2001 (DOE/NV, 2001) revealed favorable conditions for natural degradation at the CAU 339 site, but because of differing sample methods and heterogeneity of the soil, data results from 2000 and later were not directly correlated with previous results. Post-closure monitoring activities for 2002 consisted of the following: (1) Soil sample collection from three undisturbed plots (Plots A, B, and C, Figure 2). (2) Sample analysis for TPH as oil and bio-characterization parameters (Comparative Enumeration Assay [CEA] and Standard Nutrient Panel [SNP]). (3) Site inspection to evaluate the condition of the fencing and signs. (4) Preparation and submittal of the Post-Closure Monitoring Report.
Date: September 1, 2002
Creator: Campbell, K. B.
Partner: UNT Libraries Government Documents Department

Post-Closure Inspection Report for Corrective Action Unit 427: Septic Waste Systems 2 and 6 Tonopah Test Range, Nevada Calendar Year 2000

Description: Post-closure inspection requirements for the Area 3 Septic Waste Systems 2 and 6 (Corrective Action Unit [CAU] 427) (Figure 1) are described in Closure Report for Corrective Action Unit 427. Area 3 Septic Waste Systems 2 and 6. Tonopah Test Range, Nevada, report number DOE/NV-561. The Closure Report (CR) was submitted to the Nevada Division of Environmental Protection (NDEP) on August 16, 1999. The CR (containing the Post-Closure Inspection Plan) was approved by the NDEP on August 27, 1999. The annual post-closure inspection at CAU 427 consists of the following: Verification of the presence of all leachfield and septic tank below-grade markers; Verification that the warning signs are in-place, intact, and readable; and Visual observation of the soil and asphalt cover for indications of subsidence, erosion, and unauthorized use. The site inspections were conducted on June 20, 2000, and November 21, 2000. All inspections were made after NDEP approval of the CR and were conducted in accordance with the Post-Closure Inspection Plan in the NDEP-approved CR. No maintenance or repairs were conducted at the site. This report includes copies of inspection checklists, photographs, recommendations, and conclusions. Copies of the Post-Closure Inspection Checklists are found in Attachment A, a copy of the field notes is found in Attachment B, and a copy of the inspection photographs is found in Attachments C.
Date: June 1, 2001
Creator: Campbell, K. B.
Partner: UNT Libraries Government Documents Department

Closure Report for Corrective Action Unit 326: Areas 6 and 27 Release Sites, Nevada Test Site, Nevada

Description: This Closure Report (CR) documents the activities undertaken to close Corrective Action Unit (CAU) 326, Areas 6 and 27 Release Sites, in accordance with the Federal Facility Agreement and Consent Order (FFACO) of 1996. Site closure was performed in accordance with the Nevada Division of Environmental Protection (NDEP)-approved Streamlined Approach for Environmental Restoration Plan (SAFER) Plan for CAU 326 (US Department of Energy, Nevada Operations Office [DOE/NV, 2001]). CAU 326 consists of four Corrective Action Sites (CASs), 06-25-01, 06-25-02, 06-25-04, and 27-25-01. CAS 06-25-01 is a release site associated with an underground pipeline that carried heating oil from the heating oil underground storage tank (UST), Tank 6-CP-1, located to the west of Building CP-70 to the boiler in Building CP-1 located in the Area 6 Control Point (CP) compound. This site was closed in place administratively by implementing use restrictions. CAS 06-25-02 is a hydrocarbon release associated with an active heating oil UST, Tank 6-DAF-5, located west of Building 500 at the Area 6 Device Assembly Facility. This site was closed in place administratively by implementing use restrictions. CAS 06-25-04 was a hydrocarbon release associated with Tank 6-619-4. This site was successfully remediated when Tank 6-619-4 was removed. No further action was taken at this site. CAS 27-25-01 is an excavation that was created in an attempt to remove hydrocarbon-impacted soil from the Site Maintenance Yard in Area 27. Approximately 53 cubic meters (m{sup 3}) (70 cubic yards [yd{sup 3}]) of soil impacted by total petroleum hydrocarbons (TPH) and polychlorinated biphenyls (PCBs) was excavated from the site in August of 1994. Clean closure of this site was completed in 2002 by the excavation and disposal of approximately 160 m{sup 3} (210 yd{sup 3}) of PCB-impacted soil.
Date: December 1, 2002
Creator: Campbell, K. B.
Partner: UNT Libraries Government Documents Department

ERRATA Sheet for ''Streamlined Approach for Environmental Restoration Plan for Corrective Action Unit 425: Area 9 Main Lake Construction Debris Disposal Area, Tonopah Test Range, Nevada''

Description: In Appendix A the second sentence of the first paragraph on Page A-1-1 of the Streamlined Approach for Environmental Restoration Plan for Corrective Action Unit 425: Area 9 Main Lake Construction Debris Disposal Area, Tonopah Test Range, Nevada, erroneously cites the EPA DQO guidance outline as (EPA, 1994). The correct citation is (EPA, 2000).
Date: March 1, 2003
Creator: Campbell, K. B.
Partner: UNT Libraries Government Documents Department

Post-Closure Inspection Report for Corrective Action Unit 453: Area 9 UXO Landfill Tonopah Test Range, Nevada, Calendar Year 2000

Description: Post-closure monitoring requirements for the Area 9 Unexploded Ordnance Landfill (Corrective Action Unit [CAU] 453) (Figure 1) are described in Closure Report for Corrective Action Unit 453: Area 9 UXO Landfill, Tonopah Test Range, Nevada, report number DOE/NV--284. The Closure Report (CR) was submitted to the Nevada Division of Environmental Protection (NDEP) on August 5,1999. The CR (containing the Post-Closure Monitoring Plan) was approved by the NDEP on September 10,1999. Post-closure monitoring at CAU 453 consists of the following: (1) Site inspections done twice a year to evaluate the condition of the unit; (2) Verification that the site is secure; (3) Notice of any subsidence or deficiencies that may compromise the integrity of the unit; (4) Remedy of any deficiencies within 90 days of discovery; and (5) Preparation and submittal of an annual report. Site inspections were conducted on June 20, 2000 and November 21, 2000. Both site inspections were conducted after NDEP approval of the CR, and in accordance with the Post-Closure Monitoring Plan in the NDEP-approved CR. This report includes copies of the inspection checklists, photographs, recommendations, and conclusions. The Post-Closure Inspection Checklists are found in Attachment A, a copy of the field notes is found in Attachment B, and inspection photographs are found in Attachment C.
Date: June 1, 2001
Creator: Campbell, K. B.
Partner: UNT Libraries Government Documents Department

Post-Closure Inspection Report for Corrective Action Unit 407: Roller Coaster RadSafe Area Tonopah Test Range, Nevada, Calendar Year 2001

Description: Post-closure monitoring requirements for the Roller Coaster RadSafe Area (Corrective Action Unit [CAU] 407) (Figure 1) are described in Closure Report for Corrective Action Unit 407, Roller Coaster RadSafe Area, Tonopah Test Range, Nevada, report number DOEN-694, October 2001. The Closure Report (CR) was submitted to the Nevada Division of Environmental Protection (NDEP) on April 24,2001. No issues with the post-closure monitoring plan, Section 5 .O, were raised. However, other concerns raised by stakeholders required that the CR be revised. Revision 1 of CR was issued in December of 2001 and was approved by NDEP on January 7,2002. Section 5.2 of the NDEP-approved CR calls for site inspections to be conducted within the first six months following completion of cover construction. Following the first six months, site inspection are to be conducted twice yearly for the next two years. This report provides the results of the six month post-construction site inspection. As stated in Section 5.2 of the CR, Post-closure site inspections at CAU 407 consists of the following: (1) Visual site inspections done twice a year to evaluate the condition of the cover and plant development. (2) Verification that the site is secure and condition of the fence and posted warning signs. (3) Notice of any subsidence, erosion, unauthorized excavation, etc., deficiencies that may compromise the integrity of the unit. (4) Remedy of any deficiencies within 90 days of discovery. (5) Preparation and submittal of an annual report. To meet the fiscal year 2002 post-closure inspection schedule, the first post-closure site inspection was conducted on November 6,2001. The site inspection was conducted after completion of the revegetation activities (October 24,2000) and submittal of revision 0 of the CR (October 31,2001). All site inspections were conducted in accordance with the Post-Closure Inspection requirements stated in revision 0 of the CR. ...
Date: January 1, 2002
Creator: Campbell, K. B.
Partner: UNT Libraries Government Documents Department

Post-Closure Inspection Report for Corrective Action Unit 426: Cactus Spring Waste Trenches Tonopah Test Range, Nevada Calendar Year 2001

Description: Post-closure monitoring requirements for the Cactus Spring Waste Trenches (Corrective Action Unit [CAU] 426) (Figure 1) are described in Closure Report for Corrective Action Unit 426, Cactus Spring Waste Trenches, Tonopah Test Range. Nevada, report number DOE/NV--226, August 1998. The Closure Report (CR) was submitted to the Nevada Division of Environmental Protection (NDEP) on August 14, 1998. Permeability results of soils adjacent to the engineered cover and a request for closure of CAU 404 were transmitted to the NDEP on April 29, 1999. The CR (containing the Post-Closure Monitoring Plan) was approved by the NDEP on May 13, 1999. As stated in Section 5.0 of the NDEP-approved CRY Post-Closure Monitoring Plan, site monitoring at CAU 426 consists of the following: (1) Visual site inspections done twice a year to evaluate the condition of the cover and plant development. (2) Verification that the site is secure and condition of the fence and posted warning signs. (3) Notice of any subsidence, erosion, unauthorized excavation, etc., deficiencies that may compromise the integrity of the unit. (4) Remedy of any deficiencies within 90 days of discovery. (5) Preparation and submittal of an annual report. Site inspections were conducted on May 16, 2001, and November 6, 2001. All inspections were made after NDEP approval of the CR, and were conducted in accordance with the Post-Closure Monitoring Plan in the NDEP-approved CR. This report includes copies of the inspection checklists, photographs, recommendations, and conclusions. The Post-Closure Inspection Checklists are found in Attachment A, a copy of the field notes is found in Attachment B, and copies of the inspection photographs are found in Attachment C.
Date: February 1, 2002
Creator: Campbell, K. B.
Partner: UNT Libraries Government Documents Department

Closure Report for Corrective Action Unit 398: Area 25 Spill Sites, Nevada Test Site, Nevada

Description: This Closure Report (CR) documents the activities performed to close Corrective Action Unit (CAU) 398: Area 25 Spill Sites, in accordance with the Federal Facility Agreement and Consent Order (FFACO) of 1996, and the Nevada Division of Environmental Protection (NDEP)-approved Streamlined Approach for Environmental Restoration (SA4FER) Plan for CAU 398: Area 25 Spill Sites, Nevada Test Site, Nevada (U.S. Department of Energy, Nevada Operations Office [DOEN], 2001). CAU 398 consists of the following thirteen Corrective Action Sites (CASs) all located in Area 25 of the Nevada Test Site (NTS) (Figure 1): CAS 25-25-02, Oil Spills, CAS 25-25-03, Oil Spills, CAS 25-25-04, Oil Spills, CAS 25-25-05, Oil Spills, CAS 25-25-06, Oil Spills, CAS 25-25-07, Hydraulic Oil Spill(s), CAS 25-25-08, Hydraulic Oil Spill(s), CAS 25-25-16, Diesel Spill (from CAS 25-01-02), CAS 25-25-17, Subsurface Hydraulic Oil Spill, CAS 25-44-0 1, Fuel Spill, CAS 25-44-04, Acid Spill (from CAS 25-01-01), CAS 25-44-02, Spill, and CAS 25-44-03, Spill. Copies of the analytical results for the site verification samples are included in Appendix B. Copies of the CAU Use Restriction Information forms are included in Appendix C.
Date: April 1, 2003
Creator: Campbell, K. B.
Partner: UNT Libraries Government Documents Department