14 Matching Results

Search Results

Advanced search parameters have been applied.

High SO{sub 2} removal efficiency testing. Technical progress report, January--March 1996

Description: This project involves testing at six full-scale utility flue gas desulfurization (FGD) systems, to evaluate low capital cost upgrades that may allow these systems to achieve up to 98% SO{sub 2} removal efficiency. The upgrades being evaluated primarily involve using performance additives in the FGD systems. The base project involved testing at the Tampa Electric Company Big Bend station. All five potential options to the base program have been exercised by DOE, involving testing at Hooiser Energy`s Merom Station (Option I), Southwestern Electric Power Company`s Pirkey Station (Option II), PSI Energy`s Gibson Station (Option III), Duquesne Light`s Elrama Station (Option IV), and New York State Electric and Gas Corporation`s Kintigh Station (Option V). The originally planned testing has been completed for all six sites.
Date: April 19, 1996
Creator: Blythe, G.
Partner: UNT Libraries Government Documents Department

High SO{sub 2} removal efficiency testing. Technical progress report, October--December 1995

Description: This project involves testing at six full-scale utility flue gas desulfurization (FGD) systems, to evaluate low capital cost upgrades that may allow these systems to achieve up to 98% SO{sub 2} removal efficiency. The upgrades being evaluated mostly involve using performance additives in the FGD systems. The ``base`` project involved testing at the Tampa Electric Company Big Bend station. All five potential options to the base program have been exercised by DOE, involving testing at Hoosier Energy`s Merom Station (Option I), Southwestern Electric Power Company`s Pirkey Station (Option II), PSI Energy`s Gibson Station (Option III), Duquesne Light`s Elrama Station (Option IV), and New York State Electric and Gas Corporation`s Kintigh Station (Option V). The originally planned testing has been completed for all six sites. Following the introduction, this report is divided into four sections. Section 2, Project Summary, provides a brief overview of the status of technical efforts on this project. Section 3, Results, summarizes the outcome from technical efforts during the quarter, or results from prior quarter that have not been previously reported. In Section 4, Plans for the Next Reporting Period, an overview is provided of the technical efforts anticipated for the first quarter of calendar year 1996. Section 5 contains a brief acknowledgment.
Date: October 18, 1995
Creator: Blythe, G.
Partner: UNT Libraries Government Documents Department

High SO{sub 2} removal efficiency testing. Technical progress report, July--September 1995

Description: This document provides a discussion of the technical progress on DOE/PETC project number DE-AC22-92PC91338, {open_quotes}High Efficiency SO{sub 2} Removal Testing{close_quotes}, for the time period 1 July through 30 September 1995. The project involves testing at six full-scale utility flue gas desulfurization (FGD) systems, to evaluate low capital cost upgrades that may allow these systems to achieve up to 98% SO{sub 2} removal efficiency. The upgrades being evaluated mostly involve using performance additives in the FGD systems. The {open_quotes}base{close_quotes} project involved testing at the Tampa Electric Company Big Bend station. All five potential options to the base program have been exercised by DOE, involving testing at Hoosier Energy`s Merom Station (Option I), Southwestern Electric Power Company`s Pirkey Station (Option II), PSI Energy`s Gibson Station (Option III), Duquesne Light`s Elrama Station (Option IV), and New York State Electric and Gas Corporation`s Kintigh Station (Option V). The originally planned testing has been completed for all six sites. The remainder of this document is divided into four sections. Section 2, Project Summary, provides a brief overview of the status of technical efforts on this project. Section 3, Results, summarizes the outcome from technical efforts during the quarter or results from prior quarters that have not been previously reported. In Section 4, Plans for the Next Reporting Period, an overview is provided of the technical efforts that are anticipated for the fourth quarter of calendar year 1995. Section 5 contains a brief acknowledgement.
Date: October 18, 1995
Creator: Blythe, G.
Partner: UNT Libraries Government Documents Department

High SO{sub 2} removal efficiency testing. Quarterly status report, April-June 1995

Description: This project involves testing at six full-scale utility flue gas desulfurization (FGD) systems to evaluate low capital cost upgrades that may allow these systems to achieve up to 98% SO{sub 2} removal efficiency. The upgrades being evaluated mostly involve using performance additives in the FGD systems. The {open_quotes}base{close_quotes} project involved testing at the Tampa Electric Company Big Bend station. All five potential options to the base program have been exercised by DOE, involving testing at Hoosier Energy`s Merom Station (Option I), Southwestern Electric Power Company`s Pirkey Station (Option II), PSI Energy`s Gibson Station (Option III), Duquesne Light`s Elrama Station (Option IV), and New York State Electric and Gas Corporation`s Kintigh Station (Option V). The originally planned testing has been completed for all six sites. The remainder of this document is divided into four sections. Section 2, Project Summary, provides a brief overview of the status of technical efforts on this project. Section 3, Results, summarizes the outcome from technical efforts during the quarter, or results from prior quarters that have not been previously reported. In Section 4, Plans for the Next Reporting Period, an overview is provided of the technical efforts that are anticipated for the third quarter of calendar year 1995. Section 5 contains a brief acknowledgment.
Date: July 14, 1995
Creator: Blythe, G.
Partner: UNT Libraries Government Documents Department

High SO{sub 2} removal efficiency testing. Quarterly status report, July--September 1994

Description: This document provides a discussion of the technical progress on the project ``High Efficiency SO{sub 2} Removal Testing``, for the time period 1 July through 30 September 1994. The project involves testing at six full-scale utility flue gas desulfurization (FGD) systems, to evaluate low capital cost upgrades that may allow these systems to achieve up to 98% SO{sub 2} removal efficiency. The upgrades evaluated mostly involve using additives in the FGD systems. The ``base`` project involved testing at the Tampa Electric Company Big Bend station. AR five potential options to the base program have been exercised by DOE, involving testing at the Hoosier Energy Merom Station (Option I), the Southwestern Electric Power Company Pirkey Station (Option II), the PSI Energy Gibson Station (Option III), the Duquesne Light Elrama Station (Option IV), and the New York State Electric and Gas Company Kintigh Station (Option V). By the end of September 1994, testing was completed for the base project and for all options. The document is divided into four sections. Section 2, Project Summary, provides a brief overview of the status of technical efforts on this project. Section 3, Results, summarizes the outcome from these technical efforts during the quarter. In Section 4, Plans for the Next Reporting Period, an overview is provided of the technical efforts that are anticipated for the fourth quarter of calendar year 1994. Section 5 contains a brief acknowledgement.
Date: December 1, 1994
Creator: Blythe, G.
Partner: UNT Libraries Government Documents Department

High SO{sub 2} removal efficiency testing. Quarterly report, July - September 1996

Description: This document provides a discussion of the technical progress on DOE/PETC project number DE-AC22-92PC91338, ``High Efficiency SO{sub 2} Removal Testing,`` for the time period 1 July through 30 September 1996. The project involves testing at six full-scale utility flue gas desulfurization (FGD) systems, to evaluate low capital cost upgrades that may allow these systems to achieve up to 98% SO{sub 2} removal efficiency. The upgrades being evaluated mostly involve using performance additives in the FGD systems. The ``base`` project involved testing at the Tampa Electric Company`s Big Bend Station. All five potential options to the base program have been exercised by DOE, involving testing at Hoosier Energy`s Merom Station (Option I), Southwestern Electric Power Company`s Pirkey Station (Option II), PSI Energy`s Gibson Station (Option III), Duquesne Light`s Elrama Station (Option IV), and New York State Electric and Gas Corporation`s Kintigh Station (Option V). The originally planned testing has been completed for all six sites. The remainder of this document provides a brief overview of the status of technical efforts on this project, including those efforts anticipated for the first quarter of calendar year 1996, summarizes results from prior quarters, and contains a brief acknowledgment. 13 refs.
Date: July 1, 1996
Creator: Blythe, G.
Partner: UNT Libraries Government Documents Department

High SO(2) Removal Efficiency Testing.

Description: On the base program, testing was completed at the Tampa Electric Company`s (TECo`s) Big Bend Station in November 1992. The upgrade option tested was DBA additive. Additional testing was conducted at this site during the previous quarter (April through June 1997). Results from that testing were presented in the Technical Progress Report dated July 1997. For Option I, at the Hoosier Energy Merom Station, results from another program co-funded by the Electric Power Research Institute (EPRI) and the National Rural Electric Cooperative Association have been combined with results from DOE-funded testing. Three upgrade options have been tested: DBA additive, sodium formate additive, and high pH set-point operation. All testing was completed by November 1992. There were no activities for this site during the current quarter. Option II involved testing at the Southwestern Electric Power Company Pirkey Station. Both sodium formate and DBA additives were tested as potential upgrade options. All of the testing at this site was completed by May 1993. On Option III, for testing at the PSI Energy Gibson Station, testing with sodium formate additive was completed in early October 1993, and a DBA additive performance and consumption test was completed in March of 1994. There were no efforts for this site during the current quarter. Option IV is for testing at the Duquesne Light Elrama Station. The FGD system employs magnesium-enhanced lime reagent and venturi absorber modules. An EPRI-funded model evaluation of potential upgrade options for this FGD system, along with a preliminary economic evaluation, determined that the most attractive upgrade options for this site were to increase thiosulfate ion concentrations in the FGD system liquor to lower oxidation percentages.
Date: October 22, 1997
Creator: Blythe, G.
Partner: UNT Libraries Government Documents Department

High SO{sub 2} removal efficiency testing. Quarterly status report, October 1994--December 1994

Description: This document provides a discussion of the technical progress on DOE/PETC project number DE-AC22-92PC91338, {open_quotes}High Efficiency SO{sub 2} Removal Testing{close_quotes}, for the time period 1 October through 31 December 1994. The project involves testing at six full-scale utility flue gas desulfurization (FGD) systems, to evaluate low-capital cost upgrades that may allow these systems to achieve up to 98% SO{sub 2} removal efficiency. The upgrades to be evaluated primAllily involve using additives in the FGD systems. The {open_quotes}base{close_quotes} project involved testing at the Tampa Electric Company Big Bend station. AR five potential options to the base program have been exercised by DOE, involving testing at the Hoosier Energy Merom Station (Option I), the Southwestern Electric Power Company Pirkey Station (Option II), the PSI Energy Gibson Station (Option III), the Duquesne Light Elrama Station (Option IV), and the New York State Electric and Gas Corporation (NYSEG) Kintigh Station (Option V). By the beginning of the fourth quarter of 1994, testing had been completed for the base project and for all options. The remainder of this document is divided into four sections. Section 2, Project Summary, provides a brief overview of the status of technical efforts on this project. Section 3, Results, summarizes the outcome from these technical efforts during the quarter. In Section 4, Plans for the Next Reporting Period, an overview is provided of the technical efforts that are anticipated for the first quarter of calendar year 1995. Section 5 contains a brief acknowledgement.
Date: February 3, 1995
Creator: Blythe, G.
Partner: UNT Libraries Government Documents Department

Enhanced Control of Mercury by Wet Flue Gas Desulfurization Systems--Site 2 Results

Description: The U.S. Department of Energy and EPRI are co-funding this project to improve the control of mercury emissions from coal-fired power plants equipped with wet flue gas desulfurization (FGD) systems. The project is investigating catalytic oxidation of vapor-phase elemental mercury to a form that is more effectively captured in wet FGD systems. If successfully developed, the process could be applicable to over 90,000 MW of utility generating capacity with existing FGD systems, and to future FGD installations. Field tests are being conducted to determine whether candidate catalyst materials remain active towards mercury oxidation after extended flue gas exposure. Catalyst life will have a large impact on the cost effectiveness of this potential process. A mobile catalyst test unit is being used to test the activity of four different catalysts for a period of up to six months at each of three utility sites. Catalyst testing at the first site, which fires Texas lignite, was completed in December 1998. Testing at the second test site, which fires a Powder River Basin subbituminous coal, was completed in the fall of 1999, and testing at the third site, which fires a high-sulfur bituminous coal, will begin in early 2000. This technical note reports results from Site 2; results from Site 1 were reported in a previous technical note. At Site 2, catalysts were tested in several forms, including powders dispersed in sand bed reactors and in more commercially viable forms such as extruded beads and coated honeycomb structures. This technical note presents results from Site 2 for both the sand bed reactors and commercial catalyst forms. Site 3 results are not yet available, but should be available late in the year 2000. Field testing is being supported by laboratory tests to screen catalysts for activity at specific flue gas compositions, to investigate catalyst ...
Date: February 1, 2000
Creator: Blythe, G.; Miller, S.; Richardson, C. & Searcy, K.
Partner: UNT Libraries Government Documents Department

Enhanced Control of Mercury by Wet Flue Gas Desulfurization Systems--Site 2 Results

Description: The U.S. Department of Energy and EPRI are co-funding this project to improve the control of mercury emissions from coal-fired power plants equipped with wet flue gas desulfurization (FGD) systems. The project is investigating catalytic oxidation of vapor-phase elemental mercury to a form that is more effectively captured in wet FGD systems. If successfully developed, the process could be applicable to over 90,000 MW of utility generating capacity with existing FGD systems, and to future FGD installations. Field tests are being conducted to determine whether candidate catalyst materials remain active towards mercury oxidation after extended flue gas exposure. Catalyst life will have a large impact on the cost effectiveness of this potential process. A mobile catalyst test unit is being used to test the activity of four different catalysts for a period of up to six months at each of three utility sites. Catalyst testing at the first site, which fires Texas lignite, was completed in December 1998. Testing at the second test site, which fires a Powder River Basin subbituminous coal, was completed in the fall of 1999, and testing at the third site, which fires a high-sulfur bituminous coal, will begin in 2000. This technical note reports results from Site 2; results from Site 1 were reported in a previous technical note. At Site 2, catalysts were tested in several forms, including powders dispersed in sand bed reactors and in commercial forms such as extruded beads and coated honeycomb structures. This technical note presents results from Site 2 for both the sand bed reactors and commercial catalyst forms. Field testing is being supported by laboratory tests to screen catalysts for activity at specific flue gas compositions, to investigate catalyst deactivation mechanisms and to investigate methods for regenerating spent catalysts. Laboratory results related to the Site 2 field effort ...
Date: June 1, 2000
Creator: Blythe, G.; Miller, S.; Richardson, C. & Searcy, K.
Partner: UNT Libraries Government Documents Department

High SO(2) removal efficiency testing. Technical progress report, March - May 1996

Description: This project involves testing at six full-scale utility flue gas desulfurization (FGD) systems, to evaluate low capital cost upgrades may allow these systems to achieve up to 98% SO{sub 2} removal efficiency. The upgrades being evaluated mostly involve using performance additives in the FGD systems. The ``base`` project involved testing at the Tampa Electric Company`s Big Bend Station. All five potential options to the base program have been exercised by DOE, involving testing at Hoosier Energy`s Merom Station (Option I), Southwestern Electric Power Company`s Pirkey Station (Option II), PSI Energy`s Gibson Station (Option III), Duquesne Light`s Elrama Station (Option IV), and New York State Electric and Gas Corporation`s Kintigh Station (Option V). The originally planned testing has been completed for all six sites. The remainder of this document is divided into four sections. Section 2, project summary, provides a brief overview of the status of technical efforts on this project. Section 3, results, summarizes the outcome from technical efforts during the quarter or results from prior quarters that have not been previously reported. In Section 4, plans for the next reporting period, an overview is provided of the technical efforts anticipated for the first quarter of calendar year 1996. Section 5 contains a brief acknowledgment.
Date: December 31, 1996
Creator: Murphy, J. & Blythe, G.
Partner: UNT Libraries Government Documents Department

ENHANCED CONTROL OF MERCURY BY WET FLUE GAS DESULFURIZATION SYSTEMS

Description: The U.S. Department of Energy and EPRI have co-funded this project to improve the control of mercury emissions from coal-fired power plants equipped with wet flue gas desulfurization (FGD) systems. The project investigated catalytic oxidation of vapor-phase elemental mercury to a form that is more effectively captured in wet FGD systems. If successfully developed, the process could be applicable to over 90,000 MW of utility generating capacity with existing FGD systems and to future FGD installations. Field tests have been conducted to determine whether candidate catalyst materials remain active towards mercury oxidation after extended flue gas exposure. Catalyst life will have a large impact on the cost effectiveness of this potential process. A mobile catalyst test unit has been used to test the activity of four different catalyst materials for a period of up to six months at each of three utility sites. Catalyst testing was completed at the first site, which fires Texas lignite, in December 1998 and at the second test site, which fires a Powder River Basin subbituminous coal in the fall of 1999. Testing at the third site, which fires a medium- to high-sulfur bituminous coal, began in June 2000 and was completed at the end of January 2001. This Topical Reports includes results from Site 3; results from Sites 1 and 2 were reported previously. At Site 3, catalysts were tested in two forms, including powders dispersed in sand bed reactors and in a commercially available form as a coated honeycomb structure. Field testing has been supported by laboratory tests to screen catalysts for activity at specific flue gas compositions, to investigate catalyst deactivation mechanisms and methods for regenerating spent catalysts. Laboratory results related to the Site 3 field effort are also included and discussed in this Topical Report.
Date: June 1, 2001
Creator: Blythe, G.; Marsh, B.; Miller, S.; Richardson, C. & Richardson, M.
Partner: UNT Libraries Government Documents Department

Final LDRD report : nanoscale mechanisms in advanced aging of materials during storage of spent %22high burnup%22 nuclear fuel.

Description: We present the results of a three-year LDRD project focused on understanding microstructural evolution and related property changes in Zr-based nuclear cladding materials towards the development of high fidelity predictive simulations for long term dry storage. Experiments and modeling efforts have focused on the effects of hydride formation and accumulation of irradiation defects. Key results include: determination of the influence of composition and defect structures on hydride formation; measurement of the electrochemical property differences between hydride and parent material for understanding and predicting corrosion resistance; in situ environmental transmission electron microscope observation of hydride formation; development of a predictive simulation for mechanical property changes as a function of irradiation dose; novel test method development for microtensile testing of ionirradiated material to simulate the effect of neutron irradiation on mechanical properties; and successful demonstration of an Idaho National Labs-based sample preparation and shipping method for subsequent Sandia-based analysis of post-reactor cladding.
Date: September 1, 2013
Creator: Clark, Blythe G.; Rajasekhara, Shreyas; Enos, David George; Dingreville, Remi Philippe Michel; Doyle, Barney Lee; Hattar, Khalid Mikhiel et al.
Partner: UNT Libraries Government Documents Department

Fast neutron environments.

Description: The goal of this LDRD project is to develop a rapid first-order experimental procedure for the testing of advanced cladding materials that may be considered for generation IV nuclear reactors. In order to investigate this, a technique was developed to expose the coupons of potential materials to high displacement damage at elevated temperatures to simulate the neutron environment expected in Generation IV reactors. This was completed through a high temperature high-energy heavy-ion implantation. The mechanical properties of the ion irradiated region were tested by either micropillar compression or nanoindentation to determine the local properties, as a function of the implantation dose and exposure temperature. In order to directly compare the microstructural evolution and property degradation from the accelerated testing and classical neutron testing, 316L, 409, and 420 stainless steels were tested. In addition, two sets of diffusion couples from 316L and HT9 stainless steels with various refractory metals. This study has shown that if the ion irradiation size scale is taken into consideration when developing and analyzing the mechanical property data, significant insight into the structural properties of the potential cladding materials can be gained in about a week.
Date: October 1, 2011
Creator: Buchheit, Thomas Edward; Kotula, Paul Gabriel; Lu, Ping; Brewer, Luke N. (Naval Postgraduate School, Monterey, CA); Goods, Steven Howard (Sandia National Laboratories, Livermore, CA); Foiles, Stephen Martin et al.
Partner: UNT Libraries Government Documents Department