Search Results

Advanced search parameters have been applied.
open access

Decontamination Program Task II. Volume II, Evaluation of Chemical Agents for Nuclear Reactor Decontamination

Description: Abstract: The caustic permanganate-rinse decontamination treatment was investigated. Loop and metallurgical studies were performed to determine optimum operating conditions as well as the metallurgical effects of the treatment. A treatment with 10 percent sodium hydroxide and 5 percent potassium permanganate solution followed by a rinse with a 5 percent ammonium citrate, 2 percent citric acid and 1/2 percent Versene solution was chosen for the decontamination of a stainless steel steam generat… more
Date: February 15, 1959
Creator: Zegger, John L. & Pancer, Guyon P.
Partner: UNT Libraries Government Documents Department
open access

Suitability of Inconel for Corrosion Protection on Water Side of Sodium Component Steam Generator

Description: Abstract; The heat exchanger and steam generator for the U.S. Atomic Energy Commission Sodium Components Project will be constructed entirely of type 316 stainless steel. Because of the susceptibility of this alloy to stress corrosion cracking, it is proposed to clad all areas of the steam generator with Inconel where the stainless steel will be exposed to water and steam. This report includes a discussion of the work by numerous investigators that justify the selection of Inconel for this se… more
Date: March 1, 1961
Creator: Phillips, Laurence E. & Vawter, Frank J.
Partner: UNT Libraries Government Documents Department
open access

Hazards Report for SM-1 Core II With the SM-1 Core II With the Silver-Cadmium-Indium Control Rod Absorber Section

Description: Abstract: In the March-April 1962 shutdown of SM-1 Core II, the SM-28 element will be re-inserted in SM-1 Core II and an SM-1 Core I element will be removed. An SM-1 Core II europium absorber will be replaced by a Ag-Cd-In absorber, and surveillance specimens will be inserted above the core support structure. Analysis of these changes concludes that re-insertion of the SM-2B stationary element and insertion of surveillance specimens do not affect hazards potential previously defined for SM-1.… more
Date: March 15, 1962
Creator: Stephenson, L. D.
Partner: UNT Libraries Government Documents Department
open access

Steady State and Transient Thermal and Hydraulic Analysis of SM-2 Termination Report

Description: Abstract: Thermal characteristics of the SM-2 core were analyzed at steady state and loss of flow conditions. For steady state operation, the steady state code STDY-3 was used. For transients during a loss of flow accident, ART-02, a one-dimensional code, was used. This analysis indicates the SM-2 core is safe from burnout under steady state operation at design power level (28 tMW) because (1) no nucleate boiling exists, and (2) the minimum burnout ratio is above 2.0. The core is safe from burn… more
Date: September 8, 1961
Creator: Segalman, I. & Bradley, P. L.
Partner: UNT Libraries Government Documents Department
open access

Startup Testing of the PM-2A Nuclear Power Plant

Description: Abstract: A detailed description of the PM-2A reactor, primary system and instrumentation is presented. A general description of the secondary system and plant arrangement at Camp Century, Greenland is included. The results of the startup physics, shielding, thermal and hydraulics and radiochemistry test are presented. the analysis performed on the shielding and thermal and hydraulic tests is included. The shielding problem at startup and the shielding modification made to the plant are describ… more
Date: March 31, 1962
Creator: McCool, W. J.; Ryan, R. M.; Richards, W. M. S.; Bradley, P. L.; Stephenson, L. D. & Cox, J. F.
Partner: UNT Libraries Government Documents Department
Back to Top of Screen