13 Matching Results

Search Results

Advanced search parameters have been applied.

Confirmatory Survey for the Partial Site Release at the ABB Inc. CE Winsor Site, Windsor, CT

Description: The objectives of the confirmatory surveys were to confirm that remedial actions had been effective in meeting established release criteria and that documentation accurately and adequately describes the final radiological conditions of the PSR Impacted Areas.
Date: June 27, 2008
Creator: Adams, W.C.
Partner: UNT Libraries Government Documents Department

CONFIRMATORY SURVEY RESULTS FOR PORTIONS OF THE MATERIALS AND EQUIPMENT FROM UNITS 1 AND 2 AT THE HUMBOLDT BAY POWER PLANT, EUREKA, CALIFORNIA

Description: The Pacific Gas & Electric Company (PG&E) operated the Humboldt Bay Power Plant (HBPP) Unit 3 nuclear reactor near Eureka, California under Atomic Energy Commission (AEC) provisional license number DPR-7. HBPP Unit 3 achieved initial criticality in February 1963 and began commercial operations in August 1963. Unit 3 was a natural circulation boiling water reactor with a direct-cycle design. This design eliminated the need for heat transfer loops and large containment structures. Also, the pressure suppression containment design permitted below-ground construction. Stainless steel fuel claddings were used from startup until cladding failures resulted in plant system contamination—zircaloy-clad fuel was used exclusively starting in 1965 eliminating cladding-related contamination. A number of spills and gaseous releases were reported during operations resulting in a range of mitigative activities (see ESI 2008 for details).
Date: April 1, 2011
Creator: Adams, W. C.
Partner: UNT Libraries Government Documents Department

Verification Survey of the Building 315 Zero Power Reactor-6 Facility, Argonne National Laboratory-East, Argonne, Illinois

Description: Oak Ridge Institute for Science and Education (ORISE) conducted independent verification radiological survey activities at Argonne National Laboratory’s Building 315, Zero Power Reactor-6 facility in Argonne, Illinois. Independent verification survey activities included document and data reviews, alpha plus beta and gamma surface scans, alpha and beta surface activity measurements, and instrumentation comparisons. An interim letter report and a draft report, documenting the verification survey findings, were submitted to the DOE on November 8, 2006 and February 22, 2007, respectively (ORISE 2006b and 2007).
Date: May 25, 2007
Creator: Adams, W. C.
Partner: UNT Libraries Government Documents Department

Confirmatory Survey Results for the Emergency Operations Facility (EOF) at the Connecticut Yankee Haddam Neck Plant, Haddam, Connecticut

Description: The U.S. Nuclear Regulatory Commission (NRC) requested that the Oak Ridge Institute for Science and Education (ORISE) perform a confirmatory survey on the Emergency Operations Facility (EOF) at the Connecticut Yankee Haddam Neck Plant (HNP) in Haddam, Connecticut
Date: July 3, 2007
Creator: Adams, W. C.
Partner: UNT Libraries Government Documents Department

Revised─Confirmatory Survey Report for Portions of the Auxiliary Building Structural Surfaces and Turbine Building Embedded Piping, Rancho Seco Nuclear Generating Station, Herald, California

Description: During the period of October 15 and 18, 2007, ORISE performed confirmatory radiological survey activities which included beta and gamma structural surface scans and beta activity direct measurements within the Auxiliary Building, beta or gamma scans within Turbine Building embedded piping, beta activity determinations within Turbine Building Drain 3-1-27, and gamma scans and the collection of a soil sample from the clay soils adjacent to the Lower Mixing Box.
Date: December 7, 2007
Creator: Adams, W. C.
Partner: UNT Libraries Government Documents Department

Confirmatory Survey Report for Area B1S/B2S at the Chevron Mining Washington Remediation Project, Washington, PA

Description: During the period of October 2 and 3, 2007, the Oak Ridge Institute for Science and Education (ORISE) performed confirmatory radiological survey activities which included gamma surface scans within Area B1S/B2S and the collection of soil samples from these areas.
Date: November 20, 2007
Creator: Adams, W. C.
Partner: UNT Libraries Government Documents Department

Confirmatory Survey Report for Portions of the Auxiliary Building Structural Surfaces and Turbine Building Embedded Piping, Rancho Seco Nuclear Generating Station, Herald, CA

Description: During the period of October 15 and 18, 2007, ORISE performed confirmatory radiological survey activities which included beta and gamma structural surface scans and beta activity direct measurements within the Auxiliary Building, beta or gamma scans within Turbine Building embedded piping, beta activity determinations within Turbine Building Drain 3-1-27, and gamma scans and the collection of a soil sample from the clay soils adjacent to the Lower Mixing Box.
Date: December 7, 2007
Creator: Adams, W. C.
Partner: UNT Libraries Government Documents Department

Confirmatory Survey Report for the Section 4 Area at the Rio Algom Ambrosia Lake Facility New Mexico

Description: The objectives of the confirmatory survey were to verify that remedial actions were effective in meeting established release criteria and that documentation accurately and adequately described the final radiological conditions of the RAM Ambrosia Lake, Section 4 Areas.
Date: February 12, 2010
Creator: Adams, W. C.
Partner: UNT Libraries Government Documents Department

Verification survey of the hot cell facility site, General Atomics, San Diego, California

Description: From 1958, General Atomics maintain a hot cell facility in support of government-funded research into reactor fuels. As the use of the facility declined, General Atomics entered into an agreement with DOE to dismantle the facility and decontaminate and decommission (D&D) the site so that it could made available for unrestricted use. The Environmental Survey and Site Assessment Program (ESSAP) was requested to verify the final radiological status of the D&D effort. This is the report of ESSAP survey and verification activities conducted at the San Diego site from November 1999 through March 2000.
Date: June 30, 2000
Creator: Adams, W. C.
Partner: UNT Libraries Government Documents Department