Dynamic Isotope Power System: technology verification phase. Test plan. 79-KIPS-6

Description: The objective of this document is to outline the test plan for the KIPS Technology Verification Program. This test plan is inclusive of component simulating (rig) testing, component testing and system testing. Rig testing will prove concept feasibility, measure basic performance and to develop the hardware necessary prior to initiation of GDS component part manufacture. Component testing will measure basic performance and verify component integrity prior to GDS assembly. The GDS system testing … more
Date: November 30, 1978
Creator: Mohr, G. D.
Partner: UNT Libraries Government Documents Department
open access

Morning light cleanup and recovery operation: simulation studies of possible reactor fuels. [Cosmos 954 orbiting Russian reactor with U-10 wt% Mo fuel]

Description: The nuclear fuel for Cosmos 954, the orbiting Russian reactor that broke up on reentry during January of 1978, has been identified as a U--Mo alloy containing about 10 wt% molybdenum. Identification was based on a combination of simulation studies at LLL, examination of fuel debris at Whiteshell Nuclear Research Establishment (WNRE), Pinawa, Manitoba, and reactor technology knowledge. In the LLL simulation studies, mixtures of uranium, molybdenum, and UO/sub 2/ were heated under conditions that… more
Date: August 31, 1978
Creator: Landingham, R. L. & Casey, A. W.
Partner: UNT Libraries Government Documents Department
open access

Selenide Isotope Generator for the Galileo Mission. Reliability Program Plan

Description: The reliability program plan for the Selenide Isotope Generator (SIG) program is presented. It delineates the specific tasks that will be accomplished by Teledyne Energy Systems and its suppliers during design, development, fabrication and test of deliverable Radioisotopic Thermoelectric Generators (RTG), Electrical Heated Thermoelectric Generators (ETG) and associated Ground Support Equipment (GSE). The Plan is formulated in general accordance with procedures specified in DOE Reliability Engin… more
Date: October 1, 1978
Partner: UNT Libraries Government Documents Department
open access

Preparation and characterization of radioactive samples for various areas of research

Description: Over the past few years, many techniques have been applied by IRML to prepare radioisotope targets and related research materials from actinide and other radioisotopes. Many of these samples were prepared by ceramic technology--an R and D program extending over the past three years. Standard vapor deposition methods have been used to prepare hundreds of fission chamber and other planar samples used in determining cross sections. Refined methods of characterization of all samples have been appli… more
Date: January 1, 1978
Creator: Adair, H.L.
Partner: UNT Libraries Government Documents Department
open access

Vaporization thermodynamics and kinetics of hexagonal silicon carbide

Description: Mass spectrometer Knudsen effusion vaporization measurements over the temperature range 1835 to 2264K confirm earlier mass spectrometer results that Si(g) is the predominant vapor species above the SiC-C two-phase region. Si/sub 2/C(g) and SiC/sub 2/(g) are found to be the next most important vapor species. Total vapor pressures are measured to be a factor of 10 to 15 higher than values previously reported between 1800 to 2200K. Silicon partial pressures lead to a value of -7.5 kcal mol/sup -1/… more
Date: January 1, 1978
Creator: Behrens, R. G. & Rinehart, G. H.
Partner: UNT Libraries Government Documents Department
open access

Selenide Isotope Generator for the Galileo Mission. GDS Disassembly Report

Description: The GDS-1 was disassembled to determine the cause for the rapid degradation of the output power. Unfortunately, it was not possible to relate the observations to direct causes for the degradation. However, some positive statements can be made which have an impact on the flight program. First, the outgassing and gas management techniques were shown to be adequate to maintain clean conditions within the generator. Second, the non-modular components within the generator including the receptacles o… more
Date: November 1, 1978
Partner: UNT Libraries Government Documents Department
open access

Theory of thermionic energy converter with variable plasma electron temperature

Description: A computational procedure for calculating the C-V characteristic, the plasma arc-drop and other important parameters for a cesium vapor thermionic energy converter has been developed. The original theory dealing with the constant electron temperature has been extended to treat the problem for the variable electron temperature. Comparison between the two cases shows that the C-V characteristic moves generally toward the left as the electron thermal conductivity decreases, but the magnitude of th… more
Date: September 1, 1978
Creator: Yen, A.T. & Lam, S.H.
Partner: UNT Libraries Government Documents Department
open access

Conceptual engineering design study of thermionic topping of fossil power plants

Description: Primary objectives of this study are to investigate alternative design concepts of thermal coupling of thermionic energy converters (TECs) to the steam cycle and the mechanical and electrical aspects of integrating TEC design into the steam power station. The specific tasks include: (1) evaluate design concepts of TEC topping of solvent refined liquified coal-fired steam power plants, with main emphasis devoted to thermal, mechanical, and electrical design aspects. (2) Develop preliminary conce… more
Date: February 15, 1978
Partner: UNT Libraries Government Documents Department
open access

Inconel-600/T-111 alloy compatibility studies

Description: Oxidation resistant Hastelloy-C is the material presently used to clad a small radioisotopic heat source. Inconel-600 has properties and composition similar to Hastelloy-C and is under consideration as an alternate clad material. To serve this purpose, the material must be compatible with the underlying T-111 alloy strength member. Upon completion of compatibility studies, metallographic examination of the specimens revealed reaction zones that appeared to be influenced by time and temperature.… more
Date: January 1, 1978
Creator: Teaney, P. E.
Partner: UNT Libraries Government Documents Department
open access

Organic Rankine Kilowatt Isotope Power System. Final phase I report

Description: On 1 August 1975 under Department of Energy Contract EN-77-C-02-4299, Sundstrand Energy Systems commenced development of a Kilowatt Isotope Power System (KIPS) directed toward satisfying the higher power requirements of satellites of the 1980s and beyond. The KIPS is a /sup 238/PuO/sub 2/ fueled organic Rankine cycle turbine power system which will provide design output power in the range of 500 to 2000 W/sub (e)/ with a minimum of system changes. The principal objectives of the Phase 1 develop… more
Date: July 15, 1978
Partner: UNT Libraries Government Documents Department
open access

Comparative study and evaluation of advanced-cycle systems. Final report

Description: Appendices D through H are included in this volume dealing with data compiled from the advanced cycle systems studies. They are: Details of Net Present Worth Approach; Net Present Worth With Discrete Annual Payments; Output of Net Present Worth Programs; Direct Weighting Method Power Cycle Ratings; and Direct Weighting Method: Utility Objectives and Impacts of Evaluation Criteria. (MCW)
Date: February 1, 1978
Creator: Pomeroy, B.D.; Fleck, J.J.; Marsh, W.D.; Brown, D.H. & Shah, R.P.
Partner: UNT Libraries Government Documents Department
open access

Selenide Isotope Generator for the Galileo Mission: SIG/Galileo Contract Compliance Power Prediction Technique

Description: This initial definition of the power degradation prediction technique outlines a model for predicting SIG/Galileo mean EOM power using component test data and data from a module power degradation demonstration test program. (LCL)
Date: November 1, 1978
Creator: Hammel, T. E. & Srinivas, V.
Partner: UNT Libraries Government Documents Department
open access

Quarterly report on the strontium heat source development program, Advanced Systems and Materials Production Division for April--June 1978

Description: All of the remaining compatibility tests are proceeding as scheduled. Results of the 20,000-hr compatibility tests with nonradioactive SrF/sub 2/ show that, with one exception, attack of the specimens by the SrF/sub 2/ after 20,000 hr is no greater than after 6000 and 12,000 hr. The one exception involved Haynes Alloy 25 specimens tested at 1000/sup 0/C. These test specimens exhibited isolated subsurface voids to depths of 0.025 in., although the general surface attack was only about 0.001 inch… more
Date: July 1, 1978
Creator: Fullam, H. T.
Partner: UNT Libraries Government Documents Department
open access

Volume reduction system for solid and liquid TRU waste from the nuclear fuel cycle: April--June 1978

Description: The laboratory cyclone incinerator has been developed to study the effects of burning feed containing radionuclides other than plutonium-238. These isotopes, which will be primarily products of fission, must be efficiently removed from the off-gas if combustible waste containing such species is to be incinerated. Modifications to the original incinerator design were made to increase the efficiency of combustion and particulate removal in the system and to reduce its energy consumption. A drum c… more
Date: July 25, 1978
Creator: Alexander, B.M.; Lewis, E.L.; Doty, J.W. & Batchelder, D.H.
Partner: UNT Libraries Government Documents Department
open access

Selenide Isotope Generator for the Galileo Mission. Quality Assurance Program Plan

Description: This Quality Program Plan has been prepared to describe the quality activities associated with the development, production, test and delivery of hardware for the Selenide Isotope Generator Program. The objective of the Quality Program Plan is to establish and maintain an effective and economical quality assurance system to assure that end items are in accordance with contractural specifications. Section I.9 of Appendix A (Statement of Work) states: The Contractor shall prepare, implement and ma… more
Date: August 1, 1978
Partner: UNT Libraries Government Documents Department
open access

Safety test of an improved multihundred watt FSA: launch abort, solid propellant fire

Description: This safety test consisted of exposing a simulant-fueled Improved Multihundred Watt Fuel Sphere Assembly, containing a Pt-3008 sphere holding the fuel simulant, to a single proximity fire of UTP-3001 solid rocket propellant for 10.5 min. The graphite outside shell sustained only minor abrasion damage. It was covered on one side with a heavy deposit of alumina from the fire mixed with silica from the test bed. The Pt-3008 shell had small amounts of carbon, alumina, and silica deposited on its su… more
Date: July 1, 1978
Creator: Seabourn, C.M.
Partner: UNT Libraries Government Documents Department
open access

Selenide Isotope Generator (SIG) for the Galileo Mission

Description: This agreement establishes the procedures and defines the responsibilities that are a part of the DOE/TES/3M interface for the duration of the SIG/Galileo Mission Program. The agreement is intended to expand upon the Interface Document which is Attachment IV to both the 3M and TES Contract Statement of Work. The agreement is effective upon approval by DOE, TES and 3M Company.
Date: September 1, 1978
Partner: UNT Libraries Government Documents Department
open access

Quarterly report on the strontium heat source development program, advanced systems and materials production division for July-September 1978.

Description: Metallographic examination of the specimens from the 12,000-hr tests with /sup 90/SrF/sub 2/ was completed this quarter. The 12,000-hr Hastelloy C-276 specimens exhibited substantially greater attack than did the 6000-hr specimens. The 12,000-hr Haynes 25 and TZM specimens, however, showed no more attack than did the 6000-hr specimens. The 20,000-hr tests with /sup 90/SrF/sub 2/ have also been completed, and arrangements have been made to ship the capsules to Oak Ridge National Laboratory (ORNL… more
Date: December 1, 1978
Creator: Fullam, H. T.
Partner: UNT Libraries Government Documents Department
open access

Advanced thermionic energy conversion. Joint highlights and status report, January--February 1978

Description: The status of negative ion converter tests for improving converter performance by reducing the hydrogen negative ion impurities is outlined. Construction of various thermionic converter test models is discussed. An analytical model of a converter with an argon plasmatron ion source is described. (WHK)
Date: January 1, 1978
Partner: UNT Libraries Government Documents Department
open access

Reactor technology. Progress report, January--March 1978

Description: Progress is reported in eight program areas. The nuclear Space Electric Power Supply Program examined safety questions in the aftermath of the COSMOS 954 incident, examined the use of thermoelectric converters, examined the neutronic effectiveness of various reflecting materials, examined ways of connecting heat pipes to one another, studied the consequences of the failure of one heat pipe in the reactor core, and did conceptual design work on heat radiators for various power supplies. The Heat… more
Date: July 1, 1978
Creator: Warren, J.L. (ed.)
Partner: UNT Libraries Government Documents Department
open access

Rover Process Verification Studies: Sintered Metal Filters Blowback System

Description: This report describes process verification studies on the performance of the filter blowback systems used in the reprocessing of Rover fuels. The effectiveness of the installed plant equipment was tested using full-scale mockups in the pilot plant. Sintered metal filters were loaded with fines from a fluidized bed of graphite. Various combinations of design and operating parameters were tested to determine if successful blowbacks would be achieved. The effectiveness of the system for minimizing… more
Date: August 1, 1978
Creator: Meyer, H. S.
Partner: UNT Libraries Government Documents Department
open access

Gaseous Fuel Reactors for Power Systems

Description: The Los Alamos Scientific Laboratory is participating in a NASA-sponsored program to demonstrate the feasibility of a gaseous uranium fueled reactor. The work is aimed at acquiring experimental and theoretical information for the design of a prototype plasma core reactor which will test heat removal by optical radiation. The basic goal of this work is for space applications, however, other NASA-sponsored work suggests several attractive applications to help meet earth-bound energy needs. Such p… more
Date: January 1, 1978
Creator: Helmick, Herbert H. & Schwenk, Francis C.
Partner: UNT Libraries Government Documents Department
open access

Selenide Isotope Generator for the Galileo Mission. ETG Acceptance Test Plan

Description: Electrically-Heated Thermoelectric Generators (ETGs) shall be subjected to a flight level acceptance test program to certify the design of the SIG/Galileo flight generator. Each test in the test program is designed to simulate critical conditions and environments associated with generator ground handling, spacecraft launch and in-space operations. Successful completion of the test program shall be evidenced by the satisfactory performance of the ETG during and after the application of the vario… more