Search Results

open access

Multilateral Development Banks: U.S. Contributions FY2000-FY2013

Description: This report shows in tabular form how much the Administration requested and how much Congress appropriated for U.S. payments to the multilateral development banks (MDBs) since 2000. It also provides a brief description of the MDBs and the ways they fund their operations. It will be updated periodically as annual appropriation figures are known.
Date: February 1, 2013
Creator: Nelson, Rebecca M.
Partner: UNT Libraries Government Documents Department
open access

Multilateral Development Banks: U.S. Contributions FY2000-FY2011

Description: This report shows in tabular form how much the Administration has requested and how much Congress has appropriated for U.S. payments to the multilateral development banks (MDBs) since 2000. It also provides a brief description of the MDBs and the ways they fund their operations.
Date: March 11, 2011
Creator: Nelson, Rebecca M.
Partner: UNT Libraries Government Documents Department
open access

Federal Geothermal Research Program Update Fiscal Year 2002

Description: The Department of Energy (DOE) and its predecessors have conducted research and development (R&D) in geothermal energy since 1971. To develop the technology needed to harness the Nation's vast geothermal resources, DOE's Office of Geothermal Technologies oversees a network of national laboratories, industrial contractors, universities, and their subcontractors. The goals are: (1) Double the number of States with geothermal electric power facilities to eight by 2006; (2) Reduce the levelized cost of generating geothermal power to 3-5 cents per kWh by 2007; and (3) Supply the electrical power or heat energy needs of 7 million homes and businesses in the United States by 2010. This Federal Geothermal Program Research Update reviews the specific objectives, status, and accomplishments of DOE's Geothermal Program for Federal Fiscal Year (FY) 2002. The information contained in this Research Update illustrates how the mission and goals of the Office of Geothermal Technologies are reflected in each R&D activity. The Geothermal Program, from its guiding principles to the most detailed research activities, is focused on expanding the use of geothermal energy. balanced strategy for the Geothermal Program.
Date: September 1, 2003
Partner: UNT Libraries Government Documents Department
open access

U.S. Global Health Assistance: FY2001-FY2019 Request

Description: This report outlines U.S. funding for global health by agency and program. Congress may debate several pressing global health issues, including strengthening health systems, bolstering pandemic preparedness, considering the FY2019 budget request, protecting life in global health assistance, and authorizing the extension of PEPFAR (President's Emergency Plan for AIDS Relief).
Date: June 22, 2018
Creator: Salaam-Blyther, Tiaji
Partner: UNT Libraries Government Documents Department
open access

NIH Funding: FY1994-FY2019

Description: This report discusses funding for the U.S. National Institutes of Health (NIH) from 1994 to 2019. The NIH is the primary federal agency charged with conducting and supporting biomedical and behavioral research. It is the largest of the eight health-related agencies that make up the Public Health Service (PHS) within the Department of Health and Human Services (HHS).
Date: October 15, 2018
Creator: Johnson, Judith A. & Sekar, Kavya
Partner: UNT Libraries Government Documents Department
open access

Pacific Northwest National Laboratory Annual Self-Evaluation Report: 2002

Description: This report will summarize PNNL's progress toward accomplishment of the critical outcomes, objectives and performance indicators as delineated in the FY 2002 Performance Evaluation and Fee Agreement. In addition, this report will summarize PNNL's analysis of the results of the FY2002 Peer Reviews, the implementation of PNNL's FY2002 Operational Improvement Initiatives, and the resolution of the Key Areas for Improvements.
Date: October 29, 2002
Creator: Cuello, Robert
Partner: UNT Libraries Government Documents Department
open access

Pacific Northwest National Laboratory Institutional Plan FY 2000-2004

Description: The Pacific Northwest National Laboratory Institutional Plan for FY 2000-2004 sets forth the laboratory's mission, roles, technical capabilities, and laboratory strategic plan. In the plan, major initiatives also are proposed and the transitioning initiatives are discussed. The Programmatic Strategy section details our strategic intent, roles, and research thrusts in each of the U.S. Department of Energy's mission areas. The Operations/Infrastructure Strategic Plan section includes information on the laboratory's human resources; environment, safety, and health management; safeguards and security; site and facilities management; information resources management; management practices and standards; and communications and trust.
Date: March 1, 2000
Creator: Pearson, Erik W.
Partner: UNT Libraries Government Documents Department
open access

FY 2002 Integrated Monitoring Plan for the Hanford Groundwater Monitoring Project

Description: This document is an integrated monitoring plan for the groundwater project and contains: well and constituent lists for monitoring required by the Atomic Energy Act of 1954 and its implementing orders ("surveillance monitoring"); other, established monitoring plans by reference; and a master well/ constituent/frequency matrix for the entire Hanford Site.
Date: October 31, 2001
Creator: Hartman, Mary J.; Dresel, P Evan; Lindberg, Jonathan W.; Newcomer, Darrell R. & Thornton, Edward C.
Partner: UNT Libraries Government Documents Department
open access

Water Infrastructure Financing: History of EPA Appropriations

Description: This report summarizes, in chronological order, congressional activity to fund items in the State and Tribal Assistance Grants (STAG) account since 1987. In appropriations legislation, funding for EPA (Environmental Protection Agency) wastewater assistance is contained in the measure providing funds for the Department of the Interior, Environment, and Related Agencies.
Date: January 19, 2006
Creator: Copeland, Claudia
Partner: UNT Libraries Government Documents Department
open access

INEEL Institutional Plan - FY 2000-2004

Description: In this first Institutional Plan prepared by Bechtel BWXT Idaho, LLC, for the Idaho National Engineering and Environmental Laboratory, the INEEL will focus it's efforts on three strategic thrusts; (1) Environmental Management stewardship for DOE-EM, (2) Nuclear reactor technology for DOE-Nuclear Energy (NE), and (3) Energy R&D, demonstration, and deployment (initial focus on biofuels and chemical from biomass). The first strategic thrust focuses on meeting DOE-EM's environmental cleanup and long-term stewardship needs in a manner that is safe, cost-effective, science-based, and approved by key stakeholders. The science base at the INEEL will be further used to address a grand challenge for the INEEL and the DOE complex - the development of a fundamental scientific understanding of the migration of subsurface contaminants. The second strategic thrust is directed at DOE-NE's needs for safe, economical, waste-minimized, and proliferation-resistant nuclear technologies. As NE lead laboratories, the INEEL and ANL will pursue specific priorities. The third strategic thrust focuses on DOE's needs for clean, efficient, and renewable energy technology. As an initial effort, the INEEL will enhance its capability in biofuels, bioprocessing, and biochemicals. The content of this Institutional Plan is designed to meet basic DOE requirements for content and structure and reflect the key INEEL strategic thrusts. Updates to this Institutional Plan will offer additional content and resource refinements.
Date: November 1, 1999
Creator: Enge, Ray Stevenson
Partner: UNT Libraries Government Documents Department
open access

Overview of Fiscal Year 2002 Research and Development for Savannah River Site's Salt Waste Processing Facility

Description: The Department of Energy's (DOE) Savannah River Site (SRS) high-level waste program is responsible for storage, treatment, and immobilization of high-level waste for disposal. The Salt Processing Program (SPP) is the salt (soluble) waste treatment portion of the SRS high-level waste effort. The overall SPP encompasses the selection, design, construction and operation of treatment technologies to prepare the salt waste feed material for the site's grout facility (Saltstone) and vitrification facility (Defense Waste Processing Facility). Major constituents that must be removed from the salt waste and sent as feed to Defense Waste Processing Facility include actinides, strontium, cesium, and entrained sludge. In fiscal year 2002 (FY02), research and development (R&D) on the actinide and strontium removal and Caustic-Side Solvent Extraction (CSSX) processes transitioned from technology development for baseline process selection to providing input for conceptual design of the Salt Waste Processing Facility. The SPP R&D focused on advancing the technical maturity, risk reduction, engineering development, and design support for DOE's engineering, procurement, and construction (EPC) contractors for the Salt Waste Processing Facility. Thus, R&D in FY02 addressed the areas of actual waste performance, process chemistry, engineering tests of equipment, and chemical and physical properties relevant to safety. All of the testing, studies, and reports were summarized and provided to the DOE to support the Salt Waste Processing Facility, which began conceptual design in September 2002.
Date: February 26, 2003
Creator: Harmon, H. D.; Leugemors, R.; Fink, S.; Thompson, M.; Walker, D.; Suggs, P. et al.
Partner: UNT Libraries Government Documents Department
open access

Annual Report - FY 2002, Radioactive Waste Shipments To and From the Nevada Test Site

Description: In February 1997, the U.S. Department of Energy, Nevada Operations Office issued the Mitigation Action Plan which addressed potential impacts described in the ''Final Environmental Impact Statement for the Nevada Test Site and Off-Site Locations in the State of Nevada'' (DOE/EIS 0243). The U.S. Department of Energy, Nevada Operations Office committed to several actions, including the preparation of an annual report, which summarizes waste shipments to and from the Nevada Test Site (NTS) Radioactive Waste Management Sites (RWMSs) at Area 3 and Area 5. This document satisfies requirements with regard to low-level radioactive waste (LLW) and mixed low-level radioactive waste (MLLW) transported to or from the NTS during fiscal year (FY) 2002.
Date: January 1, 2003
Creator: United States. National Nuclear Security Administration. Nevada Site Office.
Partner: UNT Libraries Government Documents Department
open access

FY02 Final Report on Phytoremediation of Chlorinated Ethenes in Southern Sector Sediments of the Savannah River Site

Description: This final report details the operations and results of a 3-year Seepline Phytoremediation Project performed adjacent to Tims Branch, which is located in the Southern Sector of the Savannah River Site (SRS) A/M Area. Phytoremediation is a process where interactions between vegetation, associated microorganisms, and the host substrate combine to effectively degrade contaminated soils, sediments, and groundwater. Phytoremediation is a rapidly developing technology that shows promise for the effective and safe cleanup of certain hazardous wastes. It has the potential to remediate numerous volatile organic compounds (VOCs). Extensive characterization work has demonstrated that two VOCs, tetrachloroethylene (PCE) and trichloroethylene (TCE) are the major components of the VOC-contaminated groundwater that is migrating through the Southern Sector and Tims Branch seepline area (WSRC, 1999). The PCE and TCE are chlorinated ethenes (CE), and have been detected in seepline soils and ground water adjacent to the ecologically-sensitive Tims Branch seepline area.
Date: January 30, 2004
Creator: Brigmon, R..L.
Partner: UNT Libraries Government Documents Department
open access

Melt Rate Testing for the DWPF: Summary of FY02 Testing

Description: A study performed in FY01 recommended that the Defense Waste Process Facility (DWPF) replace Frit 200 with Frit 320 for the processing of sludge batch 2 (SB2) to improve melt rate (Lambent et al., 2001) contingent upon additional testing which included slurry feeding. The FY02 melt rate program was developed to support this recommendation as well as to investigate alternative methods of improving melt rate above and beyond a change in frit composition. The integrated program was primarily based on a sound testing methodology from which the frit change was recommended. In addition, the program included the development of additional tools to provide further insight into melt rate enhancements. The overall strategy of the FY02 testing program was to design suites of melt rate tests based on recommendations from previous work that provided insight into other methods of improving melt rate for the DWPF. The objectives of the FY02 testing program included how melt rate might be influenced by increases in waste loading, differences in frit particle size, the use of batch chemicals rather than a pre-fabricated frit, and the impact of uranium. This report summarizes the equipment development and setup, procedures, and results of this testing, and includes recommendations on the processing of SB2 with Frit 320 and future research.
Date: February 19, 2003
Creator: Lorier, T.H.
Partner: UNT Libraries Government Documents Department
Back to Top of Screen