PM-1 Nuclear Power Plant Program: Final Progress Report, September 1, 1962 Through Completion

Description: From abstract: The principal efforts during the final period were concerned with plant testing, modifications to the plant to enable it to produce full design load at high ambient temperatures, the compilation and evaluation of plant performance data, preparation of documents and transfer of the plant to the AEC and final resolution of all outstanding contract scope items.
Date: July 15, 1963
Partner: UNT Libraries Government Documents Department
open access

Final Safety Analysis: Ten-Watt Strontium-90 Fueled Generator for an Unattended Light Buoy, SNAP-7A

Description: From introduction: A prototype Strontium-90 fueled generator will be used to fulfill the power requirements of an unattended automatic light buoy...Primary objectives are to provide continuous absolute containment of the radiostrontium fuel...and biological shielding of the direct radiation from the heat source.
Date: February 1962
Creator: Brooks, Phillip M. & Keegan, James J.
Partner: UNT Libraries Government Documents Department
open access

Final Safety Analysis: Ten-Watt Strontium-90 Fueled Generator for an Unattended Meteorological Station, SNAP-7C

Description: From introduction: The primary objectives in designing a nuclear safe radiostrontium generator are: continuous absolute containment of the radiostrontium fuel, which is a relatively insoluble and chemically stable fuel compound, and biological shielding of the direct radiation from the heat source. This report evaluates the safety aspects of a prototype Strontium-90 fueled generator which will be utilized by the U.S. Navy to power and unattended automatic meterological station.
Date: 1962
Creator: Brooks, Phillip M. & Keegan, James J.
Partner: UNT Libraries Government Documents Department
open access

Final Safety Analysis Report: SNAP III Thermoelectric Generator

Description: From summary: An analysis has been performed to determine the ability of the fuel container to withstand the various thermal, mechanical and chemical forces imposed upon the generator by vehicle failures. Where theoretical analysis was impossible, and where experimental evidence was desired, capsules and generators were tested under simulated missile-failure conditions. Thus, the safety limits of SNAP III in a satellite application were defined.
Date: June 1960
Creator: Hagis, W. & Dix, George P.
Partner: UNT Libraries Government Documents Department
open access

PM-1 Nuclear Power Plant Program: Plant Performance Studies, Final Periodic Report, September 1, 1962 to December 31, 1962

Description: From abstract: Data obtained during the performance testing of the PM-1 plant was compiled and evaluated. It is concluded from the data that the plant performance in general meets or exceeds specifications. Transient and steady-state electrical fluctuations are well within specified limitations. Heat balance data for both the primary and secondary systems agree reasonably well with design predictions. Radiation levels are below those anticipated.
Date: April 1963
Partner: UNT Libraries Government Documents Department