Search Results

Primary view of 1/2 Sintering of Mullite-Containing Materials: I. Effect of Composition
Sacks, Michael D. & Pask, Joseph A.
December 1, 1981
Primary view of 2-D time evolution of T/sub e/ during sawtooth crash based on fast ECE (electron cyclotron emission) measurements on TFTR
Kuo-Petravic, G.
December 1, 1988
Primary view of 2-Dimensional studies of the disk-and-washer and side-coupled resonant cavity structures
Larry, L.D. Jr.
December 1, 1987
Primary view of 3-D field computations for accelerator magnets using finite element and integral codes
Turner, L. R.; Kim, S. H.; Kim, K. & Kettunen, L.
December 1, 1992
Primary view of A 3-D numerical study of pinhole diffraction to predict the accuracy of EUV point diffraction interferometry
Goldberg, K.A.; Tejnil, E. & Bokor, J.
December 1, 1995
Primary view of 3-D Seismic Experimentation and Advanced Processing/Inversion Development for Investigations of the Shallow Subsurface
Levander, Alan R.
December 1, 2004
Primary view of 3-D spectral IP imaging: Non-invasive characterization of contaminant plumes. Annual progress report, September 15, 1996--September 14, 1997
Frye, Kevin M.; Lesmes, David P.; Morgan, F. Dale; Rodi, William; Shi, Weiqun & Sturrock, John
December 1, 1997
Primary view of 3-D transient eddy current calculations for the FELIX cylinder experiments
Davey, K. R. & Turner, L. R.
December 1, 1986
Primary view of 3-D woven, mullite matrix, composite filter
Lane, J. E.; Painter, C. J.; Radford, K. C. & LeCostaouec, J. F.
December 1, 1995
Primary view of 3-Nitropropionic Acid is a Suicide Inhibitor of MitochondrialRespiration that, Upon Oxidation by Complex II, Forms a Covalent AdductWith a Catalytic Base Arginine in the Active Site of the Enzyme
Huang, Li-shar; Sun, Gang; Cobessi, David; Wang, Andy C.; Shen,John T.; Tung, Eric Y. et al.
December 1, 2005
Primary view of 7-GeV Advanced Photon Source Instrumentation Initiative conceptual design report
unknown creator
December 1, 1992
Primary view of 10 MW Solar Thermal Pilot Plant Dynamic Simulation Volume 1 Computer Program Description
Best, E. N.; Duroux, J. W.; Laurence, C. L.; Maxwell, F. D. & Randall, C. M.
December 1, 1978
Primary view of 10 MW Solar Thermal Pilot Plant Dynamic Simulation Volume 2 Computer Program Source Listing
Energy Projects Directorate
December 1, 1978
Primary view of A 12-channel VMEbus-based pulse-height analysis module
Arnone, G. J.
December 1, 1993
Primary view of 20-kW Solar Photovoltaic Flat-Panel Power System for an Uninterruptible Power-System Load in El Paso, Texas. Phase Ii. System Fabrication. Final Report October 1, 1979-May 31, 1981
Risser, V.V.
December 1, 1981
Primary view of 20% Wind Energy by 2030: Increasing Wind Energy's Contribution to U.S. Electricity Supply; Executive Summary (Revised)
unknown creator
December 1, 2008
Primary view of 24 Command Fire Improvement Action Program Plan
Griffin, G. B.
December 1, 2000
Primary view of 24 Hour pumping test of production well 905-120P
Bledsoe, H.W.
December 1, 1990
Primary view of 24 Hour pumping test of production well 905-120P
Bledsoe, H. W.
December 1, 1990
Primary view of 24 M Meteorological Tower Data Report Period: January Through December, 1995
Freeman, D.; Bowen, J.B.; Egami, R.; Coulombe, W.; Crow, D.; Cristani, B. et al.
December 1, 1997
Primary view of 24 M Meteorological Tower Data Report Period: January Through December, 1996
Freeman, D.; Bowen, J.; Egami, R.; Coulombe, W.; Crow, D.; Cristani, B. et al.
December 1, 1997
Primary view of 24-th Order high temperature expansion for the 3-d Ising model
Glaessner, U.; Schilling, K.; Bhanot, G. & Creutz, M.
December 1, 1994
Primary view of 40 kW of solar cell modules for the Large Scale Production Task, a Low Cost Silicon Solar Array Project. Final technical report
Jones, G.T.
December 1, 1977
Primary view of 45-Day safety screening for Tank 241-B-102 auger samples, riser 1
Bell, K. E.
December 1, 1994
Back to Top of Screen